BINS-000044-2019 01042019 INSPECTION WORKSHEET (BINS-000044-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-0195-2018Permit Case Number:Case Module: Fri Jan 4, 2019Partial Pass Inspection Date:Inspection Status: John O'BrienBuilding Framing Inspector:Inspection Type: 230 LOCKHART MOUNTAIN RD252.-1-38.1 Job Address:Parcel Number: Lake George, NY 12845 Contact TypeCompany NameName Primary OwnerSilverberg, Errol ApplicantClothier, Dale Granted PermissionLakeside Construction ArchitectG. Peter Jensen Architect Primary OwnerSilverberg, Lynn ContractorLakeside Construction Checklist ItemPassedComments Building Inspector NotesNO1/4/19 Framing Partial Approval - Ice & Water Shield Approved Remaining Items: - Provide letter from engineer (Peter Jensen) signing off on framing and detail showing new supports for exit door canopies. - Complete lateral bracing in the 2 locations discussed for the trusses to west gable end. - Unable to verify anchor bolts they were not through bottom plate of walls. Please have Peter Jensen address this item. NOTE: 2" foam insulation has been extended to top of concrete frost walls on interior side with cement board covering it and the pressure treated plate covering the top of the foam. Jan 04, 2019Page (1) INSPECTION WORKSHEET (BINS-000044-2019) Checklist ItemPassedComments FramingYES1/4/19 Framing Partial Approval - Ice & Water Shield Approved Remaining Items: - Provide letter from engineer (Peter Jensen) signing off on framing and detail showing new supports for exit door canopies. - Complete lateral bracing in the 2 locations discussed for the trusses to west gable end. - Unable to verify anchor bolts they were not through bottom plate of walls. Please have Peter Jensen address this item. NOTE: 2" foam insulation has been extended to top of concrete frost walls on interior side with cement board covering it and the pressure treated plate covering the top of the foam. Attic Access 22 x 30 minimumNO Continuous Header for Garage Doors withNO Straping Bracing BridgingNO- Complete lateral bracing in the 2 locations discussed for the trusses to west gable end. Hurricane Clips/Uplift Screws/Nail Holes FilledYESUplift screws installed Air Seal all Plates and SillsNO Air Seal All Registers at FloorNO Air Sealing all Joints Before InsulationNO Anchor Bolts 6 ft. or less on centerNO- Unable to verify anchor bolts they were not through bottom plate of walls. Please have Peter Jensen address this item. Jan 04, 2019Page (2) INSPECTION WORKSHEET (BINS-000044-2019) Checklist ItemPassedComments Design Professional Sign-off, if requiredNO- Provide letter from engineer (Peter Jensen) signing off on framing and detail showing new supports for exit door canopies. - Unable to verify anchor bolts they were not through bottom plate of walls. Please have Peter Jensen address this item. O'Brien, John (Inspector) Jan 04, 2019Page (3)