Loading...
ResCheck /r f aciREScheck Software Version 4.6.4 ComplianceCertificate jECEOVE 281 li Project 26x42 (1092) RANCH MAY $ 1 Energy Code: 2015 IECC - - - Location: Glens Falls, New York � � OF � � (� Y BU Construction Type: Single-family ILDING`' ES Project Type: New Construction Orientation: Bldg. faces 180 deg. from North Conditioned Floor Area: 1,092 ft2 309.17-1-2.2 RC-0232-2018 Glazing Area 12% Bell, Chris Climate Zone: 6 (7635 HDD) 86 Eagan Road Permit Date: Permit Number: • Single Family Dwelling 1092 s.f. Construction Site: Owner/Agent: Designer/Contractor: 86 EAGAN RD CLUTE ENTERPRISES, INC QUEENSBURY, NY 12804 6 HOLDEN AVE QUEENSBURY, NY 12804 518-793-7277 CLUTEENTERPRISES@GMAIL.COM Compliance: Passes using UA trade-off Compliance: 5.4%Better Than Code Maximum UA: 168 Your UA: 159 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies - AssemblyGross Area Cavity Cont. °r R-Value R-Value U-Factor UA Perimeter Ceiling 1: Raised or Energy Truss 1,025 38.0 0.4 0.025 26 Wall 1:Wood Frame, 16"o.c. 200 19.0 0.0 0.060 9 Orientation: Front Window 1: Vinyl Frame:Double Pane with Low-E 30 0.290 9 Orientation: Front Door 1:Solid 20 0.160 3 Orientation: Front Wall 2:Wood Frame, 16"o.c. 328 19.0 0.0 0.060 17 Orientation:Left side Window 2:Vinyl Frame:Double Pane with Low-E 22 0.290 6 Orientation: Left side Door 2: Solid 19 0.160 3 Orientation: Left side Wall 3:Wood Frame, 16"o.c. 200 19.0 0.0 0.060 12 Orientation: Back Wall 4:Wood Frame, 16" o.c. 328 19.0 0.0 0.060 15 Orientation: Right side Window 3:Vinyl Frame:Double Pane with Low-E 30 0.290 9 Orientation: Right side Door 3: Glass 40 0.310 12 Orientation: Right side Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Ciutel\Rescheck\2018-86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 1 of10 Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Basement Wall 1:Solid Concrete or Masonry 184 0.0 19.0 0.038 7 Orientation: Front Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Basement Wall 2: Solid Concrete or Masonry 306 0.0 19.0 0.038 12 Orientation: Left side Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Basement Wall 3: Solid Concrete or Masonry 184 0.0 19.0 0.038 7 Orientation: Back Wall height: 7.8' Depth below grade: 7.0' Insulation depth:7.8' Basement Wall 4: Solid Concrete or Masonry 306 0.0 19.0 0.038 12 Orientation: Right side Wall height: 7.8' Depth below grade: 7.0' Insulation depth:7.8' Compliance Statement: The proposed building design described here is -insistent with t► .u', z pl.r specifications,and other calculations submitted with the permit application.The proposed bui ng ha own de '•n;, . ee 'tee 2015 IECC requirements in REScheck Version 4.6.4 and to comply with the mandatory require, ents ' e. m - •E . k In O `• Checklist. Name-Title y S'+.- . e Date Project Notes: Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clute1\Rescheck\2018-86 EAGAN RD QSBY- 26x42 (1092) RANCH.rck Page 2 of10 'EREScheck Software Version 4.6.4 (I Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions &Req.ID , 103.1, Construction drawings and - . ❑Complies 103.2 documentation demonstrate i. _ y❑Does Not [PR1]1 energy code compliance for the .: ' : _, - i ;❑Not Observable 4 building envelope.Thermal r ❑Not Applicable envelope represented on construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. 4 ❑Not Observable Systems serving multiple r ;❑Not Applicable dwelling units must demonstrate compliance with the IECC I Commercial Provisions. F - 302.1, Heating and cooling equipment is Heating: Heating: ElComplies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]z on loads calculated per ACCA Cooling: Cooling: ❑Not Observable Manual J or other methods Btu/hr Btu/hr ❑Not Applicable approved by the code official. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018-86 EAGAN RD QSBY- 26x42 (1092) RANCH.rck Page 3 of10 Section Plans Verified Field Verified Foundation Inspection Value Value Complies? Comments/Assumptions &Req.ID 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies [FO4]1 insulation R-value.Where interior R- R- ❑Does Not table for values. ;insulation is used,verification ['Not Observable may need to occur during Insulation Inspection. Not ❑Not Applicable ;required in warm-humid locations lin Climate Zone 3. 7 303.2 Conditioned basement wall . .'.= ::: F ❑Complies [FO5]1 insulation installed per ,:_ ` %:, r,_, E,: . = :i❑Does Not manufacturer's instructions. } ['Not Observable - ❑Not Applicable 402.2.9 ;Conditioned basement wall ft ft . ❑Complies See the Envelope Assemblies [FO611 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ; ❑Complies [FO11]2 to protect exposed exterior : *`. - • ❑Does Not insulation and extends a minimum of 6 in. below grade. ( ❑Not Observable ❑Not Applicable 403.9 ;Snow-and ice-melting system .," " <-=- ;❑Complies [FO12]2 controls installed. ❑Does Not ( , ;;'❑Not Observable ;❑Not Applicable Additional Comments/Assumptions: • • • • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018-86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 4 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions &Req.ID 402.1.1, Door U-factor. U- U- ❑Complies ;See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1F- ; f .❑Not Observable • ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- a U- il=IComplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, [Not Observable 402.5 ❑Not Applicable [FR2]i 303.1.3 U-factors of fenestration products : - - :❑Complies [FR4]1 are determined in accordance s`'_';.,. Oboes Not with the NFRC test procedure or taken from the default table. ;;.A❑Not Observable }..... ;❑Not Applicable 402.4.1.1 ,Air barrier and thermal barrier t -":- ;❑Complies [FR23]'- :installed per manufacturer's +❑Does Not i instructions. 1 { r❑Not Observable ❑Not Applicable 402.4.3 ;Fenestration that is not site built `$$ -❑Complies [FR20]' :is listed and labeled as meeting 4 $ ; 1❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 x- 9) or has infiltration rates per NFRC ;;';_ ,'-,: - ;::_ �. ..:..; :: , _._ ,',; ❑Not Observable 400 that do not exceed code )❑Not Applicable limits. [ ' 402.4.5 IC-rated recessed lighting fixtures =` - _ ❑Complies [FR16]z sealed at housing/interior finish - - ❑Does Not and labeled to indicate<_2.0 cfm leakage at 75 Pa. ;. 3❑Not Observable '(❑Not Applicable 403.2.1 Supply and return ducts in attics ; -, - %I❑Complies [FR12p- insulated8 >=R-8 where duct is ,,, `;❑Does Not 41 >= 3 inches in diameter and >= _, R-6 where< 3 inches.Supply and k ; ;❑Not Observable return ducts in other portions of r- ,❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. ' ' f ' '" 403.3.3.5 Building cavities are not used as E ❑Complies [FR15]3 ducts or plenums. I ❑Does Not x❑Not Observable : - ❑Not Applicable 403.4 HVAC piping conveying fluids R- R- ;❑Complies [FR17]2 :above 105°F or chilled fluids .❑Does Not ;below 55°F are insulated to>_R- 3 ❑Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC I0Complies [FR24]' piping. I .: inDoes Not h" ;❑Not Observable f `=:,',' >.t 10Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 a>R-3. ❑Does Not 4. i [Not Observable ❑Not Applicable fi 403.6 Automatic or gravity dampers are „❑Complies [FR19]2 "installed on all outdoor air i ❑Does Not intakes and exhausts. ; ; ❑Not Observable ?❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018 - 86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 5 of10 Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018-86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 6 of10 Section Plans Verified Field Verified Insulation Inspection ValueValue Complies? Comments/Assumptions &Req.ID 303.1 ;All installed insulation is labeled ❑Complies -[IN13]2 or the installed R-values f l - • 3❑Does Not ;provided. ❑Not Observable . ❑Not Applicable 402.1.1, Wall insulation R-value.If this is a R- R- '❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall [IN3]1 exterior,the exterior insulation El Mass ❑ Mass ['Not Observable :requirement applies(FR10). El Steel ❑ Steel ❑Not Applicable 303.2 ;Wall insulation is installed per ❑Complies ; [IN4]1 °manufacturer's instructions. I.` i❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018-86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID - 402.1.1, Ceiling insulation R-value. R- R- ❑Complies :See the Envelope Assemblies 402.2.1, ❑ Wood ;❑ Wood ❑Does Not !table for values. 402.2.2, Steel 402.2.E ❑ ❑ Steel ❑Not Observable [Fll]1 ❑Not Applicable • x F + e x 303.1.1.1, Ceiling insulation installed per .' ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. ❑Not Observable t❑Not Applicable 402.2.3 ;Vented attics with air permeable '"' =' ;.';DComplies [FI2212 insulation include baffle adjacent l = "❑Does Not to soffit and eave vents that 'extends over insulation. ; -'-.`❑Not Observable #❑Not Applicable 402.2.4 °Attic access hatch and door R- R- ❑Complies [FI3]1 I insulation R-value of the ❑Does Not ;adjacent assembly. ❑Not Observable ENot Applicable 402.4.1.2 'Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]1 Each in Climate Zones 1-2,and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [Fl4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests,verification may need to ❑Not Applicable ;occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated i - : ?- - r IEComplies [FI24]1 by manufacturer at<=2%of { ❑Does Not design air flow. r _ ,_ t •�. )❑Not Observable - ❑Not Applicable 403.1.1 ;Programmable thermostats IEComplies [FI912 i installed for control of primary s '3❑- Does Not heating and cooling systems and _ !initially set by manufacturer to ❑Not Observable code specifications. I ,:: :: :>__ :'❑Not Applicable 403.1.2 ;Heat pump thermostat installed ,. ;❑Complies [FI1012 ion heat pumps. l ❑Does Not 'I❑Not Observable :. :. i❑Not Applicable 403.5.1 Circulating service hot water a❑Complies [FI11]2 systems have automatic or I ❑Does Not (accessible manual controls. j ❑Not Observable 1 ,_ ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018- 86 EAGAN RD QSBY- 26x42 (1092) RANCH.rck Page 8 of10 h � Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 ;All mechanical ventilation system° F s ❑Complies [FI2512 'fans not part of tested and listed `=❑Does Not HVAC equipment meet efficacy j _'; _. and airflow limits. i ❑Not Observable ;❑Not Applicable z_. 403.2 Hot water boilers supplying heat i ` ❑Complies [F126]2 through one-or two-pipe heating `, v.n }=.=w:,:--,.:-:3`- r ;> ;;; -•::<-=:, _3❑Does Not systems have outdoor setback S control to lower boiler water ; -. Not Observable temperature based on outdoor ;❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems = `�°;❑Complies [F128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated k ;❑Not Observable return pipe or a cold water supply l ❑Not Applicable pipe. Gravity and thermos- pp ;syphon circulation systems are ;not present.Controls for circulating hot water system F i pumps start the pump with signal[ for hot water demand within the } occupancy.Controls automatically turn off the pump i ;when water is in circulation loop i is at set-point temperature and _ no demand for hot water exists. ; 403.5.1.2 ;Electric heat trace systems ❑Complies [FI29]2 ;comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically adjust the energy input to the a❑Not Observable heat tracing to maintain the i ;❑Not Applicable desired water temperature in the I_.. piping. 403.5.2 Water distribution systems that • ❑Complies [FI3012 have recirculation pumps that ( • ❑Does Not pump water from a heated water ; ' - supply pipe back to the heated ( Not Observable water source through a cold ;`_ s❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls i ;that manage operation of the pump and limit the temperature of the water entering the cold ;water piping to 104°F. i 403.5.4 ;Drain water heat recovery units , ; ❑Complies [FI31]2 ',tested in accordance with CSA ❑Does Not ;B55.1. Potable water-side I pressure •loss of drain water heat ❑Not Observable recovery units < 3 psi for • '❑Not Applicable individual units connected to one ;or two showers. Potable water- { ;- _ _ t (side pressure loss of drain water ;heat recovery units <2 psi for { ;individual units connected to ( 3 three or more showers. `r 404.1 75%of lamps in permanent `-._';❑Complies [FI6]1 fixtures or 75%of permanent i !❑Does Not fixtures have high efficacy lamps.f:-',,:`R ❑Not Observable Does not apply to low-voltage lighting. ; • ❑Not Applicable 404.1.1 ;Fuel gas lighting systems have ❑Complies [FI23]3 no continuous pilot light. ;❑Does Not 1 , i❑Not Observable " ...:._..._ .--_ ... ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018 - 86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.iD I 401.3 ;Compliance certificate posted. ;❑Complies [FI7]2 ❑Does Not ;❑Not Observable ;❑Not Applicable 303.3 ;Manufacturer manuals for ❑Complies [FI18]3 ;mechanical and water heating ..._. ;❑Does Not systems have been provided. ; ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 26x42 (1092) RANCH Report date: 04/23/18 Data filename: Z:\Clutel\Rescheck\2018-86 EAGAN RD QSBY-26x42 (1092) RANCH.rck Page 10 of10 . J R i CI 20 IE Efficiency15CC Energy Certificate Insulation Rating R-Value Above-Grade Wall 19.00 Below-Grade Wall 19.00 Floor 13.00 Ceiling / Roof 38.38 Ductwork (unconditioned spaces): _ Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.31 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments