Field Observation Report #4
Date of Report: 9/21/2020
Date of Field Visit: 9/21/2020
Time of Visit: 8:45 a.m.
By: Al Longtin, P.E.
Longtin Engineering, PLLC
Distribution: John Van Oort (S7)
Tom Albrecht Sr. (Hilltop)
Tim Bartlett (CFDS)
Project Name: Respite Care Facility
160 Aviation Road, Queensbury, NY
LE Project Number: 19-114
The purpose of the field visit is to review construction at areas noted for general compliance with the
design concept set forth in the Contract Documents. Comments are based upon observations of the
progress and quality of the work, and are not intended to be exhaustive. This report and the actions
recommended herein neither extends nor alters any contractual obligation and does not authorize
changes to the Contract Sum, Contract Time, or scope of the Project.
Specific Items:
A field visit was made on Monday, September 21, 2020 to observe construction progress. During this
site visit the following observations were made.
1. All building structural work has been completed with the exception of the following items:
a. Interior wood sheathing on shearwall SW2.
b. Interior wood sheathing on shearwall SW8.
c. Interior wood sheathing on the second side of shearwall SW4-A and SW4-B.
d. Interior wood sheathing on the second side of shearwall SW6-A and SW6-B.
e. Interior wood sheathing on the second side of shearwall SW7.
10 Main St.
Ballston Lake, NY 12019
Phone: 518-348-1301
Fax: 518-348-1303
www.longtinengineering.com
Page 2 of 3
PHOTOS
10 Main St.
Ballston Lake, NY 12019
Phone: 518-348-1301
Fax: 518-348-1303
www.longtinengineering.com
Page 3 of 3