Environmental Assessment Form
[[729,165,1819,240][16][B,I,][Times New Roman]]Short Environmental Assessment Form
[[934,244,1134,309][14][B,I,][Times New Roman]]Part 1 [[1098,244,1148,309][14][B,I,][Times New Roman]]- [[1131,244,1632,309][14][B,I,][Times New Roman]]Project Information
Instructions for Completing
Responses become part of the
Part 1 – Project Information. The applicant or project sponsor is responsiblefor the completion of Part 1.
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1 –Project and Sponsor Information
îÍÊÈÔÅÛÃé×ÐÖéÈÍÊÛÕ×ððù
Name of Action or Project:
ûÏ×ÎØ×ØéÓÈ×ìÐÛÎÖÍÊîÍÊÈÔÅÛÃé×ÐÖéÈÍÊÛÕ×
Project Location (describe, and attach a location map):
ùÛÊ×ÃêÍÛØëÇ××ÎÉÚÇÊÃîã
Brief Description of Proposed Action:
ûÌÌÐÓÙÛÎÈÌÊÍÌÍÉ×ÉÈÍÏÍØÓÖÃÈÔ×ÍÊÓÕÓÎÛÐÐÃÛÌÌÊÍÆ×ØÉÓÈ×ÌÐÛÎÖÊÍÏ
ÈÍÓÎÙÐÇØ×ÙÐ×ÛÊÓÎÕÍÖ×ÄÓÉÈÓÎÕÅÍÍØ×ØÛÊ×ÛÛÐÍÎÕÈÔ×ÖÊÍÎÈÃÛÊØÐÓÎ×ÛÎØÙÊ×ÛÈ×
ÛÐÛÅÎÛÎØÐÛÎØÉÙÛÌ×ØÛÊ×Û
Name of Applicant or Sponsor:
Telephone:
îÍÊÈÔÅÛÃé×ÐÖéÈÍÊÛÕ×ððù
E-Mail:
ÕÌÐÈØÇÉüÃÛÔÍÍÙÍÏ
Address:
îÍÊÈÔÅÛÃðÛÎ×
City/PO:State:Zip Code:
ëÇ××ÎÉÚÇÊà îã
1.Does the proposed action only involve the legislative adoption of a plan, local law, ordinance,
NOYES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2.Does the proposed action require a permit, approval or funding from any other government Agency?
NOYES
If Yes, list agency(s) name and permit or approval:
èÍÅÎÍÖëÇ××ÎÉÚÇÊÃìÐÛÎÎÓÎÕúÍÛÊØ
3.a. Total acreage of the site of the proposed action? __________ acres
b.Total acreage to be physically disturbed? __________ acres
c.Total acreage (project siteand any contiguous properties) owned
or controlled by the applicant or project sponsor? __________ acres
Check all land uses that occur on,adjoining near the proposed actio
Rural(non-agriculture)ndustrialCommercialResidential(suburban)
ForestAgriculture
Parkland
Page 1 of 3
5.Is the proposed action,NOYESN/A
a.A permitted use under the zoning regulations?
b.Consistent with the adopted comprehensive plan?
NOYES
6.Is the proposed action consistent with the predominant character of the existing built or natural landscape?
7.Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area?
NOYES
If Yes, identify: ________________________________________________________________________________
NOYES
a.Will the proposed action result in a substantial increasein traffic above present levels?
Are public transportationservices available at or near the site of the proposed action?
Are any pedestrian accommodations or bicycle routesavailable on or nearsite of the proposed
action?
9.Does the proposed action meet or exceed the state energy code requirements?
NOYES
If the proposed action will exceed requirements, describe design features and technologies:
_____________________________________________________________________________________________
_____________________________________________________________________________________________
10.Will the proposed action connect toan existingpublic/privatewater supply?
NOYES
If No, describe method for providing potable: _________________________________________
_____________________________________________________________________________________________
11.Will the proposed action connect to existing wastewater utilities?
NOYES
If No, describe method for providing wastewater treatment: ______________________________________
åÛÉÈ×ÅÛÈ×ÊÓÉÎÍÈÎ××Ø×ØÖÍÊÈÔÓÉÌÊÍÌÍÉÛÐ
_____________________________________________________________________________________________
NOYES
. Does any portion of thesite of the proposed action, orlands adjoining the proposed action, contain
NOYES
wetlands or otherwaterbodies regulated byafederal, state or local agency?
Would the proposed actionphysically alter, or encroach into, any existing wetland orwaterbody?
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________
_____________________________________________________________________________________________
_____________________________________________________________________________________________
Page 2 of 3
Identify the typicalhabitat types that occur on, or are likelyto be found on the project site. Check all that apply:
ShorelineForestAgricultural/grasslands
Early mid-successional
WetlandUrban Suburban
15.Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or
NOYES
Federal government as threatened or endangered?
16.Is the project site located in theloodplan?
NOYES
NOYES
17.Will the proposed action create storm water discharge, either from point or non-point sources?
If Yes,
a.Will storm water discharges flow to adjacent properties?
b.Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?
If Yes, briefly describe:
_____________________________________________________________________________________________
_____________________________________________________________________________________________
18.Does the proposed action include construction or other activities thatresult in the impoundment ofwater
NOYES
other liquids(e.g. retention pond,waste lagoon, dam)?
or
If Yes, explainpurpose and size
____________________________________________________________________________________________
_
19.Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
NOYES
management facility?
If Yes, describe: _______________________________________________________________________________
_____________________________________________________________________________________________
20.Has thesite of the proposed action or an adjoining property beensubject of remediation (ongoing
NOYES
for hazardouswaste?
completed)
If Yes, describe: _______________________________________________________________________________
_____________________________________________________________________________________________
I THAT THEINFORMATION PROVIDED ABOVE IS TRUEAND ACCURATE TO THE BEST OF
MYKNOWLEDGE
ûÇÕÇÉÈ
øúÊÓ×ÎêÛÕÍÎ×
Applicant/sponsorname:______________________ Date:_______________________________________________
ðÛÎØÉÙÛÌ×ûÊÙÔÓÈ×ÙÈðû
Signature: _____________________________________________________
ìêóîèöíêï
Page 3 of 3
ÛßÚ Ó¿°°»® Í«³³¿®§ λ°±®¬
ïÍÎØÛÃûÇÕÇÉÈ
ìï
øÓÉÙÐÛÓÏ×Ê
èÔ×÷ûöïÛÌÌ×ÊÓÉÛÉÙÊ××ÎÓÎÕÈÍÍÐÓÎÈ×ÎØ×ØÈÍÛÉÉÓÉÈ
ÌÊÍÒ×ÙÈÉÌÍÎÉÍÊÉÛÎØÊ×ÆÓ×ÅÓÎÕÛÕ×ÎÙÓ×ÉÓÎÌÊ×ÌÛÊÓÎÕÛÎ×ÎÆÓÊÍÎÏ×ÎÈÛÐ
ÛÉÉ×ÉÉÏ×ÎÈÖÍÊÏ÷ûöîÍÈÛÐÐËÇ×ÉÈÓÍÎÉÛÉÑ×ØÓÎÈÔ×÷ûöÛÊ×
ÛÎÉÅ×Ê×ØÚÃÈÔ×÷ûöïÛÌÌ×ÊûØØÓÈÓÍÎÛÐÓÎÖÍÊÏÛÈÓÍÎÍÎÛÎÃ÷ûö
ËÇ×ÉÈÓÍÎÙÛÎÚ×ÍÚÈÛÓÎ×ØÚÃÙÍÎÉÇÐÈÓÎÕÈÔ×÷ûöåÍÊÑÚÍÍÑÉûÐÈÔÍÇÕÔ
ÈÔ×÷ûöïÛÌÌ×ÊÌÊÍÆÓØ×ÉÈÔ×ÏÍÉÈÇÌÈÍØÛÈ×ØÓÕÓÈÛÐØÛÈÛÛÆÛÓÐÛÚÐ×ÈÍ
ø÷ùÃÍÇÏÛÃÛÐÉÍÎ××ØÈÍÙÍÎÈÛÙÈÐÍÙÛÐÍÊÍÈÔ×ÊØÛÈÛÉÍÇÊÙ×ÉÓÎÍÊØ×Ê
ÈÍÍÚÈÛÓÎØÛÈÛÎÍÈÌÊÍÆÓØ×ØÚÃÈÔ×ïÛÌÌ×ÊøÓÕÓÈÛÐØÛÈÛÓÉÎÍÈÛ
ÉÇÚÉÈÓÈÇÈ×ÖÍÊÛÕ×ÎÙÃØ×È×ÊÏÓÎÛÈÓÍÎÉ
ìÛÊÈ
ëÇ×ÉÈÓÍÎáùÊÓÈÓÙÛÐ÷ÎÆÓÊÍÎÏ×ÎÈÛÐîÍ
ûÊ×Ûß
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
îÍ
ê×ÕÓÉÈ×ÊÍÖôÓÉÈÍÊÓÙìÐÛÙ×ÉÍÊéÈÛÈ×÷ÐÓÕÓÚÐ×
éÓÈ×Éß
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
ã×É
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
Ûáå×ÈÐÛÎØÉÍÊíÈÔ×ÊîÍ
ê×ÕÇÐÛÈ×ØåÛÈ×ÊÚÍØÓ×Éß
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
áèÔÊ×ÛÈ×Î×ØÍÊîÍ
÷ÎØÛÎÕ×Ê×ØûÎÓÏÛÐß
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
á
ã×ÛÊöÐÍÍØìÐÛÓÎßøÓÕÓÈÛÐÏÛÌÌÓÎÕØÛÈÛÛÊ×ÎÍÈÛÆÛÓÐÛÚÐ×ÍÊÛÊ×ÓÎÙÍÏÌÐ×È×ê×Ö×ÊÈÍ÷ûö
åÍÊÑÚÍÍÑ
ìÛÊÈ
ëÇ×ÉÈÓÍÎ
îÍ
éÔÍÊÈ÷ÎÆÓÊÍÎÏ×ÎÈÛÐûÉÉ×ÉÉÏ×ÎÈöÍÊÏ÷ûöïÛÌÌ×ÊéÇÏÏÛÊÃê×ÌÍÊÈ
[[2414,3217,2464,3255][8][B,I,][Times New Roman]]1