engineer's sign off •
• • ,
• •
• •
ENGINEERING , PLLC
October 14, 2020 s 11 t "
Town of Queensbury
Attn: Mr. Mark Smith, Codes ®CT 14 2020 I Li
742 Bay Road
Queensbury,New York 12804 TOWN OF Q11EENSBURY
MarkS@queensbury.net BUILDING OOPS
RE: Onsite Wastewater Treatment System Final Inspection
Sbrocco Cottage
2952 State Route 9L f- 01o31- 20
Queensbury,New York 12801
Dear Mr. Smith:
The undersigned completed final observation of the above-referenced onsite wastewater treatment system
on September 24, 2020.. Construction observation was completed during the construction phase. The
installation was completed in substantial conformance with the intent of the design drawings dated June
24,2020.
Do not hesitate to contact me at(315)254-6891 if you have any questions.
Sincerely;
Eric E.Murdock,P.E.
ONSITE ENGINEERING I PO BOX 6265, SYRACUSE, NEW YORK 13217 I TEL 315.254 .6891
PROTECTING OUR LAKES AND RIVERS I W W W _ O N S I T E - ENGINEER ! N G . U S