Loading...
Signed Inspection Report (11-25-2020) (18).pdfINSPECTION WORKSHEET (SEP-006706-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0255-2020 Case Module:Permit Inspection Date:Wed Nov 25, 2020 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Septic Job Address:Parcel Number:12 HALL RD EXT Queensbury, NY, 12804 289.11-1-17 Contact Type Company Name Name Engineer VanDeLoo, Walter Applicant Leonardo, Adam Primary Owner Leonardo, Rebecca Contractor Rosewood Home Builders Granted Permission Rosewood Home Builders Primary Owner Leonardo, Adam Applicant Leonardo, Rebecca Checklist Item Status Building Inspector Notes Failed 11/2/20 Septic System Partial Approval - Verified sanitary force main has been sleeved with 20' of pipe at location where water line to well will cross force main 5' above. Force main has been installed at approximately 10' below proposed grade. Verified 1 1/2" water line sleeved in SCHD 80 under access road 11/25/20 Soil Type: Sand Passed Type of Water: Municipal / Well Water Failed Well Nov 25, 2020 Page (1) INSPECTION WORKSHEET (SEP-006706-2020) Checklist Item Status Waterline separation distance Failed Well separation distance Failed Well Casing Lengt: 50ft +/-Failed Absorbtion Fields: Total Length Failed Septic system field above flood plain Failed Sump pump not connected to septic system Failed Septic tanks & pump station anchored in flood zone Failed Water softener not hooked to septic system Failed Length of Each Trench Failed Depth of Trenches Failed System Use Status Failed 11/2/20 Septic System Partial Approval - Verified sanitary force main has been sleeved with 20' of pipe at location where water line to well will cross force main 5' above. Force main has been installed at approximately 10' below proposed grade. Nov 25, 2020 Page (2) INSPECTION WORKSHEET (SEP-006706-2020) Checklist Item Status Size of Stone Failed Size:Failed Stone Size:Failed Building to Tank Failed Tank to Distribution Box Failed Distribution box to Field / Pit Failed Opening Sealed:Failed End Cap Failed InletOutlet Pipes & Baffles Failed Manholes 12 or less below grade Failed [Provide extension collar if Yes]Failed Locations / Separations Failed Nov 25, 2020 Page (3) INSPECTION WORKSHEET (SEP-006706-2020) Checklist Item Status Foundation to Tank Failed Foundation to Absorption Failed Conforms as per Plot Plan Failed Engineer Report and As-Built Failed ETU Maintenance Contract provided Failed Location of system on property Failed Nov 25, 2020 Page (4) Dyer, Charles