BINS-003905-2020 07292020INSPECTION WORKSHEET (BINS-003905-2020)
RC-0734-2019Permit Management
Case Number:Case Module:
07/29/2020Partial Pass
Inspection Date:Inspection Status:
Charles DyerBuilding Insulation
Inspector:Inspection Type:
240.5-1-5
Job Address:Parcel Number:
50 Russell Harris Rd
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantMH IMPERIAL HOMES CORP.
ArchitectRucinski-Hall Architecture
Concrete ContractorKlint Asmus
ContractorMH IMPERIAL HOMES CORP.
EngineerHutchins Engineering
Granted PermissionHEIDI TAFLAN
Primary OwnerHEIDI TAFLAN
Checklist ItemPassedComments
Building Inspector NotesTrue
home is a modular, insulation installed at cathedral ceiling R 38C
and R 21 @ gable wall lakeside
U Factors = .3 cfm for windows, .5 cfm for doorsTrue
Tub Shower R-20 with Vapor BarrierFalse
All Return Air Hard Duct WorkFalse
House Wrap Taped at all SeamsFalse
Door / Window Sealed (No Insulation)Falseprovide foam at windows prior to casing in
All Ductwork Sealed Return and SupplyFalse
Air Barrier behind Knee WallsFalse
Blower Door TestFalseverify at final
Duct Insulation - if required in unheated spacesFalse
Tyvek or Similar Exterior SealantTrue
Combustion Air Supply for FurnaceFalse
Fresh air supply 3' from gradeFalse
Window SealingTrue
Duct Blaster Test for duct work, R-8False
Proper Vent, Attic VentTrue
Insulation Residential Check Commercial CheckTrueinsulation R 38C at ceiling and R 21 at gable wall/lakeside
November 30, 2020Page 1 of 1