Loading...
BINS-003905-2020 07292020INSPECTION WORKSHEET (BINS-003905-2020) RC-0734-2019Permit Management Case Number:Case Module: 07/29/2020Partial Pass Inspection Date:Inspection Status: Charles DyerBuilding Insulation Inspector:Inspection Type: 240.5-1-5 Job Address:Parcel Number: 50 Russell Harris Rd Queensbury, NY 12804 Contact TypeCompany NameName ApplicantMH IMPERIAL HOMES CORP. ArchitectRucinski-Hall Architecture Concrete ContractorKlint Asmus ContractorMH IMPERIAL HOMES CORP. EngineerHutchins Engineering Granted PermissionHEIDI TAFLAN Primary OwnerHEIDI TAFLAN Checklist ItemPassedComments Building Inspector NotesTrue home is a modular, insulation installed at cathedral ceiling R 38C and R 21 @ gable wall lakeside U Factors = .3 cfm for windows, .5 cfm for doorsTrue Tub Shower R-20 with Vapor BarrierFalse All Return Air Hard Duct WorkFalse House Wrap Taped at all SeamsFalse Door / Window Sealed (No Insulation)Falseprovide foam at windows prior to casing in All Ductwork Sealed Return and SupplyFalse Air Barrier behind Knee WallsFalse Blower Door TestFalseverify at final Duct Insulation - if required in unheated spacesFalse Tyvek or Similar Exterior SealantTrue Combustion Air Supply for FurnaceFalse Fresh air supply 3' from gradeFalse Window SealingTrue Duct Blaster Test for duct work, R-8False Proper Vent, Attic VentTrue Insulation Residential Check Commercial CheckTrueinsulation R 38C at ceiling and R 21 at gable wall/lakeside November 30, 2020Page 1 of 1