Loading...
FRM-003904-2020 07292020INSPECTION WORKSHEET (FRM-003904-2020) RC-0734-2019Permit Management Case Number:Case Module: 07/29/2020Partial Pass Inspection Date:Inspection Status: Charles DyerBuilding Framing Inspector:Inspection Type: 240.5-1-5 Job Address:Parcel Number: 50 Russell Harris Rd Queensbury, NY 12804 Contact TypeCompany NameName ApplicantMH IMPERIAL HOMES CORP. ArchitectRucinski-Hall Architecture Concrete ContractorKlint Asmus ContractorMH IMPERIAL HOMES CORP. EngineerHutchins Engineering Granted PermissionHEIDI TAFLAN Primary OwnerHEIDI TAFLAN Checklist ItemPassedComments Building Inspector NotesFalse home is a modular, garage was stick framed, please provide truss specs, have plans on hand for recheck. call when ready Air Seal all Plates and SillsFalse Joist hangersFalse 20 in. (W)False Draft stopping 1,000 sq. ft. floor trussesFalse 5.0 sf gradeFalse Design Professional Sign-off, if requiredFalse 24 in. (H)False Air Seal All Registers at FloorFalse <4:12 pitch double layer of ice/snow underlaymentFalse Anchor Bolts 6 ft. or less on centerFalse Ice and water shield 24 inches from wallFalse 12 O.C.False Air Sealing all Joints Before InsulationFalse Notches Holes Bearing WallsFalse 5.7 sf above below gradeFalse Cont Hdrs/Strapping/Nailing Grid for Garage DoorFalse Truss Specification ProvidedFalse Windows Habitable Space BedroomsFalse Metal Strapping for Notches Top PlateFalse Bracing BridgingFalse Deck (post beam connections hex head bolts)False provide 7" hex headed galvanized bolts with nuts and washers at ledger, 2 per post, then with 4x4 lateral bracing at each post. 7/29/20 Jack Studs HeadersFalse Jack Posts Main BeamsFalse Attic Access 22 x 30 minimumFalse November 30, 2020Page 1 of 2 INSPECTION WORKSHEET (FRM-003904-2020) Checklist ItemPassedComments Soffits-Insulation BaffelFalse Exterior sheeting nailed properlyFalse Hurricane Clips/Uplift Screws/Nail Holes FilledTrueat garage FramingFalse Headroom 6 ft. 8 in.False November 30, 2020Page 2 of 2