FRM-003904-2020 07292020INSPECTION WORKSHEET (FRM-003904-2020)
RC-0734-2019Permit Management
Case Number:Case Module:
07/29/2020Partial Pass
Inspection Date:Inspection Status:
Charles DyerBuilding Framing
Inspector:Inspection Type:
240.5-1-5
Job Address:Parcel Number:
50 Russell Harris Rd
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantMH IMPERIAL HOMES CORP.
ArchitectRucinski-Hall Architecture
Concrete ContractorKlint Asmus
ContractorMH IMPERIAL HOMES CORP.
EngineerHutchins Engineering
Granted PermissionHEIDI TAFLAN
Primary OwnerHEIDI TAFLAN
Checklist ItemPassedComments
Building Inspector NotesFalse
home is a modular, garage was stick framed, please provide
truss specs, have plans on hand for recheck. call when ready
Air Seal all Plates and SillsFalse
Joist hangersFalse
20 in. (W)False
Draft stopping 1,000 sq. ft. floor trussesFalse
5.0 sf gradeFalse
Design Professional Sign-off, if requiredFalse
24 in. (H)False
Air Seal All Registers at FloorFalse
<4:12 pitch double layer of ice/snow underlaymentFalse
Anchor Bolts 6 ft. or less on centerFalse
Ice and water shield 24 inches from wallFalse
12 O.C.False
Air Sealing all Joints Before InsulationFalse
Notches Holes Bearing WallsFalse
5.7 sf above below gradeFalse
Cont Hdrs/Strapping/Nailing Grid for Garage DoorFalse
Truss Specification ProvidedFalse
Windows Habitable Space BedroomsFalse
Metal Strapping for Notches Top PlateFalse
Bracing BridgingFalse
Deck (post beam connections hex head bolts)False
provide 7" hex headed galvanized bolts with nuts and washers at
ledger, 2 per post, then with 4x4 lateral bracing at each post.
7/29/20
Jack Studs HeadersFalse
Jack Posts Main BeamsFalse
Attic Access 22 x 30 minimumFalse
November 30, 2020Page 1 of 2
INSPECTION WORKSHEET (FRM-003904-2020)
Checklist ItemPassedComments
Soffits-Insulation BaffelFalse
Exterior sheeting nailed properlyFalse
Hurricane Clips/Uplift Screws/Nail Holes FilledTrueat garage
FramingFalse
Headroom 6 ft. 8 in.False
November 30, 2020Page 2 of 2