Loading...
JB201133.0024.Concrete Compressive Strength Test.2020-11-24.Rpt.0024Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201 JB201133.0024 11/24/20 12/01/20 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 35000 Pallette Stone Material Information 1251 6534 Plant: Ticket No.:843763 Field Test Data Test Air Content (%): Result Specification 4 3/4 4 - 6 6.0 4.5 - 7.5 63 40 - 95 41 3,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:11/24/20 0140 Moung Kee Mostly Sunny 10 10 End of the truck chuteSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Footings- See Attached PlanPlacement Location: Laboratory Test Data Set Avg Diam.Area Weight DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By(lbs) 1 1 4.00 12.57 11/25/20 8.55 12/01/20 7 70,550 3 5,610 ADB 1 2 11/25/20 8.60 12/22/20 28 1 3 11/25/20 8.55 12/22/20 28 1 4 11/25/20 8.55 12/22/20 28 1 5 11/25/20 8.65 Hold 1 6 11/25/20 8.60 Hold Initial Cure:Final Cure:Onsite Cooler Moist Room Comments:Not tested for plastic unit weight. 3500psi Concrete-Foundation walls,footings,Exterior,concrete tempered water,Mid Range water-Reducer Samples Made By: Dente Group - A Terracon Co. Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services: Reported To: Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Bobby w/ BBL and Dylan w/ Galusha ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Dente Group - A Terracon Co. Rep.: Moung Kee The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 2CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201 JB201133.0024 11/24/20 12/01/20 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 35000 Pallette Stone Material Information 0244 6539 Plant: Ticket No.:843767 Field Test Data Test Air Content (%): Result Specification 5 1/4 4 - 6 7.4 4.5 - 7.5 60 40 - 95 39 3,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:11/24/20 0310 Moung Kee sunny 10 10 End of the truck chuteSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): South Footings- See Attached PlanPlacement Location: Laboratory Test Data Set Avg Diam.Area Weight DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By(lbs) 2 1 4.00 12.57 11/25/20 8.25 12/01/20 7 57,960 2 4,610 ADB 2 2 11/25/20 8.30 12/22/20 28 2 3 11/25/20 8.25 12/22/20 28 2 4 11/25/20 8.30 12/22/20 28 2 5 11/25/20 8.35 Hold 2 6 11/25/20 8.30 Hold Initial Cure:Final Cure:Onsite Cooler Moist Room Comments:Not tested for plastic unit weight. 3500psi Concrete-Foundation walls,footings,Exterior,concrete tempered water,Mid Range water-Reducer Samples Made By: Dente Group - A Terracon Co. Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services: Reported To: Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone M. McHenry Materials Department Manager Bobby w/ BBL and Dylan w/ Galusha Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Dente Group - A Terracon Co. Rep.: Moung Kee The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 2CR0001, 11-16-12, Rev.6 DRAWING TITLE DWG. NUMBER: 260 JOB NO.: 260-2024NO.DESCRIPTIONREVISIONSS-1 Foundation / First Floor Plan - SouthDATE10/23/2020-302 Washington Ave. Ext.Albany, New York 12203518-452-8200 fax 518-452-2898BBLConstruServicesction3 Story Mixed UseFowler SquareBlind Rock & Bay Road, Queensbury l NYNOTE: IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION DEPARTMENT LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER, TO ALTER AN ITEM AS INDICATED ON DRAWINGS, IN ANY WAY. Foundation / First Floor Plan - South Scale: 1/8" = 1'-0"MatchlineKey Plan NIssued For Permit11/10/20201General Revisions11/13/20202Added Shear WallsUnreinforcd 5- #4 bars each way bottom 3'-0" x 3'-0" x 1'-0" thick 4'-6" x 4'-6" x 1'-0" thick Type Footing Schedule Size Reinforcing 4- #5 bars each way bottom5'-0" x 5'-0" x 1'-1" thick 5- #5 bars each way bottom5'-6" x 5'-6" x 1'-2" thick 6- #5 bars each way bottom6'-0" x 6'-0" x 1'-3" thick 7- #5 bars each way bottom6'-6" x 6'-6" x 1'-4" thick 8- #5 bars each way bottom7'-0" x 7'-0" x 1'-5" thick 6- #6 bars each way bottom7'-6" x 7'-6" x 1'-6" thick 7- #6 bars each way bottom8'-0" x 8'-0" x 1'-7" thick 8- #6 bars each way bottom8'-6" x 8'-6" x 1'-9" thick 9- #6 bars each way bottom9'-0" x 9'-0" x 1'-10" thick 10- #6 bars each way bottom9'-6" x 9'-6" x 1'-11" thick 8- #7 bars each way bottom10'-0" x 10'-0" x 2'-0" thick 9- #7 bars each way bottom10'-6" x 10'-6" x 2'-1" thick 10- #7 bars each way bottom11'-0" x 11'-0" x 2'-2" thick 11- #7 bars each way bottom11'-6" x 11'-6" x 2'-3" thick (3,000 PSF Bearing Pressure) F45 F30 F50 F55 F60 F65 F70 F75 F80 F85 F90 F95 F100 F105 F110 F115 72'-4" 8'-0"14'-0"28'-4"14'-0"8'-0" 329'-8" 25'-8"26'-4"25'-8"26'-4"12'-6"16'-0"16'-4"34'-10" 24'-0"13'-10"16'-6"30'-0"25'-8"12'-10"60'-8"12'-10"25'-8"126'-4"3'-0"3'-0"45'-10"25'-8"20'-0"14'-4"10'-6"4'-0"6'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"2'-0" 3'-0" 3'-0" 2'-0" 4'-0" 2'-6" footing 8" wall 11" 2'-6" footing 8" wall 2" shelf 11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"1'-2"2'-0"3'-0"3'-0"13'-3"20'-0"7'-6"13'-3"2'-0"4'-0"5'-2"7'-2"26'-4" 470'-4" 2'-0"7'-0"16'-2"14'-4"10'-6"4'-0"6'-0"3'-0"7'-012"3'-0"3'-0"4'-0"3'-0"3'-0"3'-1"1 2 3 4 5 6 7 8 9 10 11 A B C E F G K R S T 20191817166121314523 H D 15 29'-0"1'-6"29'-0"29'-0"29'-0"17'-1"2'-11"29'-0"29'-0"29'-0"20'-0"16'-3"3'-0"1'-2"10'-6"12'-0"6'-8"11'-6"7'-4"3'-0"1'-0"16'-0"26'-0"17'-0"3'-0"1" expansion jointStair No. 1 Elevator PitFooting Type "F75"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F86"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Footing Type "F70"T.F.E. -1'-4"Footing Type "F50"T.F.E. -4'-0"Footing Type "F75"T.F.E. -1'-4"Footing Type "F105"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"T.F.E. -2'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F80"T.F.E. -4'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footin g T y p e " F 9 0 " T.F.E. - 1' - 4 "Footing Type "F95"T.F.E. -1'-4"Footing Type "F105"T.F.E. -4'-0"Footing Type "F85"T . F . E . - 1 ' - 4 " Footing T y p e " F 6 0 " T.F.E. -4' - 0 "11"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"Footing Type "F75"Footing Type "F80"T.F.E. -3'-4"Footing Type "F65"T.F.E. -1'-4"T.F.E. -0'-8"T.F.E. -0'-8"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E. - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E . - 4' - 0 "Footing Type "F40"T.F.E. -4'-0"F o o t i n g T y p e " F 5 5 "T.F.E. -4'-0"Footing Type "F55"T.F.E. -4'-0"Floor DrainFloor Drain Floor Drain Floor Drain Floor Drain Floor Drain 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Foot ing Type "F30"T.F .E . -4 '-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"4- #4 bars each way bottom4'-0" x 4'-0" x 1'-0" thickF40 5'-0" B B A A B A A C D E E A A A A Foot ing Type "F50"T.F .E . -4 '-0" E Slab control or construction joist (typical) Column isolation joint (typical) Overpour slab @ entry door (typical) Overpour slab @ garage door Footing Type "F40"T.F.E. -4'-0"F.S.F.S.Footing Type "F90"T.F.E. -4'-0"3'-0" 3'-0" 8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"Footing Type "F95"T.F.E. -4'-0"8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"3'-0" Footin g T y p e " F 5 0 " T.F.E. - 4' - 0 " B A A Overpour slab @ entry door (typical) FF F 1 1 1 1 1 1 1 1 BT.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " B T.P . E . -0'- 8 " B T.P.E.- 0 ' - 8 " C T.P.E.2'-0"A T.P.E.2' - 0 " A T.P.E.2'-0"B T.P.E.-1'-4"B T.P.E.- 1 ' - 4 " B T.P.E.- 1 ' - 4 " A T.P.E.2'-0"D T.P . E . 2'-0 " F T.P.E.0'-6"F T.P.E.0' - 6 " F T.P.E.0' - 6 " B T.P.E.- 0 ' - 8 " B T.P.E.-0'-8"FT.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"A T . P . E .2'-0"F T.P.E. 0'-6" FT.P.E.0' - 6 " FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"F T.P.E.0'-6"F T.P.E.0'-6"B T.P . E . -0'- 8 " BT.P.E.-1'-4"AT.P.E.2'-0"A T.P.E.2'-0"A T.P.E . 2'-0" C T.P.E.2'-0"CT.P.E. 2'-0" C T.P.E.2'-0"AT.P .E .2'-0" BT.P.E.-1'-4"B T.P.E . -0'-8" B T.P . E . -1'- 4 " AT.P.E.2'-0"BT.P.E.- 1 ' - 4 " E T.P.E.2'-0"D T.P.E.2'-0"F T.P.E. 0'-6"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 "UpUpUp Up-0.00"-0.00"-0.00" -0.00" -0.00"-0.00" -0.00"-0.00" -0.00" -0.00" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -0.00" -0.75" -0.00"-0.00"-0.00" +0.75"+0.75" -0.75" -0.75"-0.75"-0.75" -1.50"-1.50" -1.50"-1.50" -1.50" -1.50" -1.50" -1.50" -0.00" -0.00"-1.50"-1.50"-1.50" -1.50"-1.50" -0.00" -0.00"-0.75" -0.75" -0.00"-0.00" -0.00" -1.50"-1.50" -0.00" -8.50" -8.50" -6.50" -8.50" -8.50" -1.50" Step Wall Step Wall Shear Wall No. 1 Shear wall No. 2 2 2 CL CL 2'-0"10"6"8"1'-2"1'-8" 10"10" 11 2" cover #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing Typical wall reinforcing #4 ties @ 12"o.c.1'-8"10"10"CL #4 stirrups @ 12"o.c. 6- #8 bars vertical - dowel to footing 11 2" cover Pier Details Scale: 3/4" = 1'-0" CL 1'-8" 10"10" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"CL #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing 11 2" cover CL 2'-0" 1'-0"1'-0" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"S #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 #4 ties @ 12"o.c. 3'-6"2'-4"1'-2"1'-2"CL #4 stirrups @ 12"o.c. 8- #6 bars vertical - dowel to footing 11 2" cover CL 2'-4" 1'-2"1'-2" #4 ties @ 12"o.c.1'-8"10"10"G #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 10"10" #4 ties @ 12"o.c. 3'-2" 2020 R Type "A"Type "B"Type "C"Type "F"Type "D"Type "E" 1'-6" 1'-0"1'-0"1'-6" 1