Loading...
JB201133.0029.Reinforcing Steel Observations.2020-12-09.Rpt.0029REINFORCING STEEL OBSERVATIONS REPORT Report Number:JB201133.0029 Service Date:12/09/20 30 Corporate Cir Ste 201 Report Date:12/10/20 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe the placement of reinficing steel and/or embedded elements as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: Moung Kee Reported To:Bobby w/ BBL and Dylan w/ Galusha Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue Reviewed By:____________________________________ (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens M. McHenry (1) Galusha & Sons LLC, James Campagnone Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 ☒ SPREAD FOUNDATION ☐ GRADE BEAM ☒ FOUNDATION WALL ☐ STRUCTURAL SLAB ☐ CLASSIFICATION ☐ OTHER REFERENCE DRAWINGS:S-1, S-2, S-3 section A, B, F LOCATION: South and North Foundation wall and footings – See attached Plan ☒ PROPER BAR SIZE ☒ PROPER GRADE STEEL ☒ PROPER BAR SPACING ☒ PROPER BAR CLEARANCE ☒ PROPER SPLICES ☒ CONFORMS TO DRAWING ☐ DOES NOT CONFORM ☐ REMARKS DRAWING TITLE DWG. NUMBER: 260 JOB NO.: 260-2024NO.DESCRIPTIONREVISIONSS-1 Foundation / First Floor Plan - SouthDATE10/23/2020-302 Washington Ave. Ext.Albany, New York 12203518-452-8200 fax 518-452-2898BBLConstruServicesction3 Story Mixed UseFowler SquareBlind Rock & Bay Road, Queensbury l NYNOTE: IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION DEPARTMENT LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER, TO ALTER AN ITEM AS INDICATED ON DRAWINGS, IN ANY WAY. Foundation / First Floor Plan - South Scale: 1/8" = 1'-0"MatchlineKey Plan NIssued For Permit11/10/20201General Revisions11/13/20202Added Shear WallsUnreinforcd 5- #4 bars each way bottom 3'-0" x 3'-0" x 1'-0" thick 4'-6" x 4'-6" x 1'-0" thick Type Footing Schedule Size Reinforcing 4- #5 bars each way bottom5'-0" x 5'-0" x 1'-1" thick 5- #5 bars each way bottom5'-6" x 5'-6" x 1'-2" thick 6- #5 bars each way bottom6'-0" x 6'-0" x 1'-3" thick 7- #5 bars each way bottom6'-6" x 6'-6" x 1'-4" thick 8- #5 bars each way bottom7'-0" x 7'-0" x 1'-5" thick 6- #6 bars each way bottom7'-6" x 7'-6" x 1'-6" thick 7- #6 bars each way bottom8'-0" x 8'-0" x 1'-7" thick 8- #6 bars each way bottom8'-6" x 8'-6" x 1'-9" thick 9- #6 bars each way bottom9'-0" x 9'-0" x 1'-10" thick 10- #6 bars each way bottom9'-6" x 9'-6" x 1'-11" thick 8- #7 bars each way bottom10'-0" x 10'-0" x 2'-0" thick 9- #7 bars each way bottom10'-6" x 10'-6" x 2'-1" thick 10- #7 bars each way bottom11'-0" x 11'-0" x 2'-2" thick 11- #7 bars each way bottom11'-6" x 11'-6" x 2'-3" thick (3,000 PSF Bearing Pressure) F45 F30 F50 F55 F60 F65 F70 F75 F80 F85 F90 F95 F100 F105 F110 F115 72'-4" 8'-0"14'-0"28'-4"14'-0"8'-0" 329'-8" 25'-8"26'-4"25'-8"26'-4"12'-6"16'-0"16'-4"34'-10" 24'-0"13'-10"16'-6"30'-0"25'-8"12'-10"60'-8"12'-10"25'-8"126'-4"3'-0"3'-0"45'-10"25'-8"20'-0"14'-4"10'-6"4'-0"6'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"2'-0" 3'-0" 3'-0" 2'-0" 4'-0" 2'-6" footing 8" wall 11" 2'-6" footing 8" wall 2" shelf 11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"1'-2"2'-0"3'-0"3'-0"13'-3"20'-0"7'-6"13'-3"2'-0"4'-0"5'-2"7'-2"26'-4" 470'-4" 2'-0"7'-0"16'-2"14'-4"10'-6"4'-0"6'-0"3'-0"7'-012"3'-0"3'-0"4'-0"3'-0"3'-0"3'-1"1 2 3 4 5 6 7 8 9 10 11 A B C E F G K R S T 20191817166121314523 H D 15 29'-0"1'-6"29'-0"29'-0"29'-0"17'-1"2'-11"29'-0"29'-0"29'-0"20'-0"16'-3"3'-0"1'-2"10'-6"12'-0"6'-8"11'-6"7'-4"3'-0"1'-0"16'-0"26'-0"17'-0"3'-0"1" expansion jointStair No. 1 Elevator PitFooting Type "F75"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F86"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Footing Type "F70"T.F.E. -1'-4"Footing Type "F50"T.F.E. -4'-0"Footing Type "F75"T.F.E. -1'-4"Footing Type "F105"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"T.F.E. -2'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F80"T.F.E. -4'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footin g T y p e " F 9 0 " T.F.E. - 1' - 4 "Footing Type "F95"T.F.E. -1'-4"Footing Type "F105"T.F.E. -4'-0"Footing Type "F85"T . F . E . - 1 ' - 4 " Footing T y p e " F 6 0 " T.F.E. -4' - 0 "11"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"Footing Type "F75"Footing Type "F80"T.F.E. -3'-4"Footing Type "F65"T.F.E. -1'-4"T.F.E. -0'-8"T.F.E. -0'-8"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E. - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E . - 4' - 0 "Footing Type "F40"T.F.E. -4'-0"F o o t i n g T y p e " F 5 5 "T.F.E. -4'-0"Footing Type "F55"T.F.E. -4'-0"Floor DrainFloor Drain Floor Drain Floor Drain Floor Drain Floor Drain 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Foot ing Type "F30"T.F .E . -4 '-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"4- #4 bars each way bottom4'-0" x 4'-0" x 1'-0" thickF40 5'-0" B B A A B A A C D E E A A A A Foot ing Type "F50"T.F .E . -4 '-0" E Slab control or construction joist (typical) Column isolation joint (typical) Overpour slab @ entry door (typical) Overpour slab @ garage door Footing Type "F40"T.F.E. -4'-0"F.S.F.S.Footing Type "F90"T.F.E. -4'-0"3'-0" 3'-0" 8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"Footing Type "F95"T.F.E. -4'-0"8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"3'-0" Footin g T y p e " F 5 0 " T.F.E. - 4' - 0 " B A A Overpour slab @ entry door (typical) FF F 1 1 1 1 1 1 1 1 BT.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " B T.P . E . -0'- 8 " B T.P.E.- 0 ' - 8 " C T.P.E.2'-0"A T.P.E.2' - 0 " A T.P.E.2'-0"B T.P.E.-1'-4"B T.P.E.- 1 ' - 4 " B T.P.E.- 1 ' - 4 " A T.P.E.2'-0"D T.P . E . 2'-0 " F T.P.E.0'-6"F T.P.E.0' - 6 " F T.P.E.0' - 6 " B T.P.E.- 0 ' - 8 " B T.P.E.-0'-8"FT.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"A T . P . E .2'-0"F T.P.E. 0'-6" FT.P.E.0' - 6 " FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"F T.P.E.0'-6"F T.P.E.0'-6"B T.P . E . -0'- 8 " BT.P.E.-1'-4"AT.P.E.2'-0"A T.P.E.2'-0"A T.P.E . 2'-0" C T.P.E.2'-0"CT.P.E. 2'-0" C T.P.E.2'-0"AT.P .E .2'-0" BT.P.E.-1'-4"B T.P.E . -0'-8" B T.P . E . -1'- 4 " AT.P.E.2'-0"BT.P.E.- 1 ' - 4 " E T.P.E.2'-0"D T.P.E.2'-0"F T.P.E. 0'-6"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 "UpUpUp Up-0.00"-0.00"-0.00" -0.00" -0.00"-0.00" -0.00"-0.00" -0.00" -0.00" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -0.00" -0.75" -0.00"-0.00"-0.00" +0.75"+0.75" -0.75" -0.75"-0.75"-0.75" -1.50"-1.50" -1.50"-1.50" -1.50" -1.50" -1.50" -1.50" -0.00" -0.00"-1.50"-1.50"-1.50" -1.50"-1.50" -0.00" -0.00"-0.75" -0.75" -0.00"-0.00" -0.00" -1.50"-1.50" -0.00" -8.50" -8.50" -6.50" -8.50" -8.50" -1.50" Step Wall Step Wall Shear Wall No. 1 Shear wall No. 2 2 2 CL CL 2'-0"10"6"8"1'-2"1'-8" 10"10" 11 2" cover #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing Typical wall reinforcing #4 ties @ 12"o.c.1'-8"10"10"CL #4 stirrups @ 12"o.c. 6- #8 bars vertical - dowel to footing 11 2" cover Pier Details Scale: 3/4" = 1'-0" CL 1'-8" 10"10" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"CL #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing 11 2" cover CL 2'-0" 1'-0"1'-0" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"S #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 #4 ties @ 12"o.c. 3'-6"2'-4"1'-2"1'-2"CL #4 stirrups @ 12"o.c. 8- #6 bars vertical - dowel to footing 11 2" cover CL 2'-4" 1'-2"1'-2" #4 ties @ 12"o.c.1'-8"10"10"G #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 10"10" #4 ties @ 12"o.c. 3'-2" 2020 R Type "A"Type "B"Type "C"Type "F"Type "D"Type "E" 1'-6" 1'-0"1'-0"1'-6" 1 DRAWING TITLE DWG. NUMBER: 260 JOB NO.: NO.DESCRIPTIONREVISIONSS-2 Foundation / First Floor Plan - NorthDATE302 Washington Ave. Ext.Albany, New York 12203518-452-8200 fax 518-452-2898BBLConstruServicesctionNOTE: IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION DEPARTMENT LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER, TO ALTER AN ITEM AS INDICATED ON DRAWINGS, IN ANY WAY. Foundation / First Floor Plan - North Scale: 1/8" = 1'-0" 260-2024Matchline Key Plan N10/23/2020-3 Story Mixed UseFowler SquareBlind Rock & Bay Road, Queensbury l NYIssued For Permit11/10/20201General Revisions11/13/20202Added Shear Walls329'-8" 8'-0"14'-0"28'-4"14'-0"8'-0" 34'-10"16'-4"16'-0"12'-6"26'-4"25'-8"26'-4"25'-8" 25'-8"12'-10"60'-8"12'-10"25'-8"30'-0"16'-6"13'-10"24'-0"126'-4"4'-0"10'-6"14'-4"20'-0"25'-8"45'-10"3'-0"3'-0"6'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"2'-0" 3'-0" 3'-0" 2'-0" 4'-0" 2'-6" footing 8" wall 2" shelf 11" 2'-6" footing 8" wall 2" shelf 11"2'-6" footing8" wall2" shelf11"2'-6" footing2'-6" footing8" wall2" shelf11"4'-0"2'-0"13'-3"27'-6"13'-3"3'-0"3'-0"2'-0"1'-2"5'-2"1'-2" 26'-4" 470'-4" 2'-0"16'-2"7'-0"14'-4"10'-6"4'-0"3'-0"3'-0"4'-0"6'-0"3'-0"3'-0"7'-012"2'-1112"3'-1"3'-012"28 29 30 31 33 36 37 38 39 A B C E F G H K R S T L 26242322212019 35 38 D 323028 N 25 J 27 29 P M 34 Q10'-6"12'-0"6'-8"11'-6"7'-4"3'-0"1'-0"2'-8"13'-4"2'-6"6'-2"8'-8"2'-8"2'-0"4'-0"17'-0"3'-0"7'-2"24'-0"17'-2"10'-10"10'-0"4'-0"2'-0"26'-0"2'-0"23'-61 4"10'-8"12'-93 4"32'-3"29'-0"29'-0"1'-6"29'-0"1" expansion jointStair No. 2 Stair No. 3 Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footin g T y p e " F 9 0 " T.F.E. - 1' - 4 "Footing Type "F105"T.F.E. -4'-0"Footing T y p e " F 6 0 " T.F.E. -4' - 0 "2'-6" footing8" wall2" shelf11"Floor Drain Floor Drain Floor Drain Elevator Pit72'-4" 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" 4- #4 bars each way bottom 5- #4 bars each way bottom 4'-0" x 4'-0" x 1'-0" thick 4'-6" x 4'-6" x 1'-0" thick Type Footing Schedule Size Reinforcing 4- #5 bars each way bottom5'-0" x 5'-0" x 1'-1" thick 5- #5 bars each way bottom5'-6" x 5'-6" x 1'-2" thick 6- #5 bars each way bottom6'-0" x 6'-0" x 1'-3" thick 7- #5 bars each way bottom6'-6" x 6'-6" x 1'-4" thick 8- #5 bars each way bottom7'-0" x 7'-0" x 1'-5" thick 6- #6 bars each way bottom7'-6" x 7'-6" x 1'-6" thick 7- #6 bars each way bottom8'-0" x 8'-0" x 1'-7" thick 8- #6 bars each way bottom8'-6" x 8'-6" x 1'-9" thick 9- #6 bars each way bottom9'-0" x 9'-0" x 1'-10" thick 10- #6 bars each way bottom9'-6" x 9'-6" x 1'-11" thick 8- #7 bars each way bottom10'-0" x 10'-0" x 2'-0" thick 9- #7 bars each way bottom10'-6" x 10'-6" x 2'-1" thick 10- #7 bars each way bottom11'-0" x 11'-0" x 2'-2" thick 11- #7 bars each way bottom11'-6" x 11'-6" x 2'-3" thick (3,000 PSF Bearing Pressure) F45 F40 F50 F55 F60 F65 F70 F75 F80 F85 F90 F95 F100 F105 F110 F115 Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Foot ing Type "F30"T.F .E . -4 '-0"Foot ing Type "F30"T.F .E . -4 '-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"F o o t i n g T y p e " F 3 0 "T.F.E. -4'-0"F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " Unreinforced3'-0" x 3'-0" x 1'-0" thickF30 Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 " 21'-8"2'-4"2'-4" 8"8"5'-0"F A B B B B B A A A C D B C D E Slab control or construction joist (typical) Overpour slab @ entry door (typical) Overpour slab @ garage door Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F95"T.F.E. -1'-4"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type " F 4 0 " T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F50"T . F . E . - 4 ' - 0 "Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Foo t i n g T y p e " F 4 5 " T.F . E . - 4 ' - 0 "Footing Type "F55"T.F.E. -4'-0"F o o t i n g T y p e " F 5 5 " T . F . E . - 4 ' - 0 "Footing Type "F40"T.F.E. -4'-0"Footing Type "F60"T.F.E. -4'-0"Footing Type "F60"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F70"T.F.E. -0'-8"Footing Type "F100"T.F.E. -4'-0"Footing Type "F90"T.F.E.-3'-4"Footing Type "F75"T.F.E. -0'-8"Footing Type "F75"T.F.E. -0'-8"Footing Type "F95"T.F.E. -0'-8"Footing Type "F75"T.F.E. -0'-8"Footing Type "F75"T.F.E. -3'-4"Footing Type "F95"T.F.E. -3'-4"Foot i n g T y p e " F 4 0 " T.F. E . - 4 ' - 0 "Footing Type "F95"T.F.E. -4'-0"3'-0"3'-0" 3'-0"3'-0"8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing Footing Type "F90"T . F . E . - 1 ' - 4 "Footing Type "F80"T.F.E. -0'-8"8 #5 bars long and #5 bars @ 9"o.c. short in addition to elevator pit reinforcing Footing Type "F100"T.F.E. -4'-0"Footing Type "F90"T.F.E. -4'-0"Footing Type "F85"T.F.E. -4'-0"5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" F F F F F FF 1 1 1 1 1 D T.P . E . 2'-0 " A T.P.E.2'-0"B T.P.E.-1'-4"B T.P.E.- 0 ' - 8 " B T . P . E .-0'-8"B T.P.E.-0'-8"C T.P.E.-0-'8"C T.P.E.-0'-8"B T.P.E.-0'-8"C T.P.E.-0'-8"C T . P . E .-0'-8"C T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"B T.P.E.-0'-8"B T . P . E .-0'-8"B T.P.E.- 0 ' - 8 " FT.P.E.0' - 6 " F T . P . E .0'-6"F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"F T . P . E .0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"B T.P . E . -0'- 8 " B T.P.E.- 0 ' - 8 " E T.P.E.2'-0"D T.P.E.2'-0"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P.E. 0'-6"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 " BT.P.E.-1'-4"AT.P.E.2' - 0 " AT.P .E .2'-0" B T.P . E . -1'- 4 " B T.P.E.-0'-8"BT.P.E.-0'-8"BT.P.E.-0'-8"A T.P.E.2'-0"BT.P.E. -0'-8" BT.P.E.-0'-8"BT.P.E.-0'-8"B T.P.E. -0'-8" B T.P.E.-0'-8"BT.P.E.-0'-8"B T.P.E.-0'-8"FT.P.E.0'-6"B T.P . E . -0'- 8 "UpUpUp UpB T.P.E. -0'-8" F T.P.E . 0'-6" -1.00" -0.00" -0.00" -0.00" -0.75" -0.00" -0.75" -0.00"-0.00"-0.00" -0.00" -0.75"-0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -1.50" -1.50" -1.50" -0.00" -1.50"-1.50" -8.50" -8.50" B StepWallStep Wall Shear Wall No. 3Shear Wall No. 4 2 2 2" cover Sawcut control joint 13 4" deep 2" cover 2x4 keyway Tooled edges 1 8"Scale: 3/4" = 1'-0" Construction Joint Cut 50% of the mesh in line with the control joint 5"5" concrete slab with 6x6 - W2.9 x W2.9 wwf 5"5" concrete slab with 6x6 - W2.9 x W2.9 wwf 1 8"8" 1'-4" 5" Slab Joint Details Control Joint Locate At Control joint See Plan For Location Scale: 3/4" = 1'-0" Grade Preparation Detail 1'-0"5" concrete slab (see sections for reinforcing) 15 mil "Stego Wrap" vapor barrier 6" base of crushed stone vapor break (ASTM 57 blend material) Compacted subgrade 6"12" compacted imported structural fill 3" cover3" coverStep (t)2 x (t) 1 1 Provide standard 90° hook on ends of higher reinforcing Standard Lap Footing Step Detail Scale: 3/4" = 1'-0"