JB201133.0033.Foundation Observations.2020-12-10.Rpt.0033FOUNDATION OBSERVATIONS REPORT Report Number:JB201133.0033 Service Date:12/10/20 30 Corporate Cir Ste 201 Report Date:12/10/20 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe foundation construction activities as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: Jared Hall Reported To:Bobby w. BBL Contractor:Galusha Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue Reviewed By:____________________________________ (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens M. McHenry (1) Galusha & Sons LLC, James Campagnone Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 On this date this Dente Group representative visited the above-referenced site to review subgrades at the request of BBL. Specifically, portions of the subgrade of Building 2, located within the northeast portion of the site, had been prepared and are shown on the attached figure. Our observations and recommendations are provided below. Prior to this representative’s arrival, the earthwork contractor, Galusha, had prepared the exterior strip footing subgrade for the areas shown on the attached (approximately Lines T and 28 to T and 38, Lines 38 and T to 38 and E). These grades had been reportedly excavated to the bottom of footing elevation then covered with frost protection blankets. Upon arrival, the subgrade was observed to consist of the glaciofluvial sand and silt described in our Geotechnical Engineering Report, dated September 25, 2020. The grades were probed with a “T”-handle soil probe and were firm under body weight. In our opinion these grades are suitable for the support of the proposed foundations. All observations were given to BBL representatives prior to this representative’s departure from the site. DRAWING TITLE DWG. NUMBER: 260 JOB NO.: NO.DESCRIPTIONREVISIONSS-2 Foundation / First Floor Plan - NorthDATE302 Washington Ave. Ext.Albany, New York 12203518-452-8200 fax 518-452-2898BBLConstruServicesctionNOTE: IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION DEPARTMENT LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER, TO ALTER AN ITEM AS INDICATED ON DRAWINGS, IN ANY WAY. Foundation / First Floor Plan - North Scale: 1/8" = 1'-0" 260-2024Matchline Key Plan N10/23/2020-3 Story Mixed UseFowler SquareBlind Rock & Bay Road, Queensbury l NYIssued For Permit11/10/20201General Revisions11/13/20202Added Shear Walls329'-8" 8'-0"14'-0"28'-4"14'-0"8'-0" 34'-10"16'-4"16'-0"12'-6"26'-4"25'-8"26'-4"25'-8" 25'-8"12'-10"60'-8"12'-10"25'-8"30'-0"16'-6"13'-10"24'-0"126'-4"4'-0"10'-6"14'-4"20'-0"25'-8"45'-10"3'-0"3'-0"6'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"2'-0" 3'-0" 3'-0" 2'-0" 4'-0" 2'-6" footing 8" wall 2" shelf 11" 2'-6" footing 8" wall 2" shelf 11"2'-6" footing8" wall2" shelf11"2'-6" footing2'-6" footing8" wall2" shelf11"4'-0"2'-0"13'-3"27'-6"13'-3"3'-0"3'-0"2'-0"1'-2"5'-2"1'-2" 26'-4" 470'-4" 2'-0"16'-2"7'-0"14'-4"10'-6"4'-0"3'-0"3'-0"4'-0"6'-0"3'-0"3'-0"7'-012"2'-1112"3'-1"3'-012"28 29 30 31 33 36 37 38 39 A B C E F G H K R S T L 26242322212019 35 38 D 323028 N 25 J 27 29 P M 34 Q10'-6"12'-0"6'-8"11'-6"7'-4"3'-0"1'-0"2'-8"13'-4"2'-6"6'-2"8'-8"2'-8"2'-0"4'-0"17'-0"3'-0"7'-2"24'-0"17'-2"10'-10"10'-0"4'-0"2'-0"26'-0"2'-0"23'-61 4"10'-8"12'-93 4"32'-3"29'-0"29'-0"1'-6"29'-0"1" expansion jointStair No. 2 Stair No. 3 Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footin g T y p e " F 9 0 " T.F.E. - 1' - 4 "Footing Type "F105"T.F.E. -4'-0"Footing T y p e " F 6 0 " T.F.E. -4' - 0 "2'-6" footing8" wall2" shelf11"Floor Drain Floor Drain Floor Drain Elevator Pit72'-4" 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" 4- #4 bars each way bottom 5- #4 bars each way bottom 4'-0" x 4'-0" x 1'-0" thick 4'-6" x 4'-6" x 1'-0" thick Type Footing Schedule Size Reinforcing 4- #5 bars each way bottom5'-0" x 5'-0" x 1'-1" thick 5- #5 bars each way bottom5'-6" x 5'-6" x 1'-2" thick 6- #5 bars each way bottom6'-0" x 6'-0" x 1'-3" thick 7- #5 bars each way bottom6'-6" x 6'-6" x 1'-4" thick 8- #5 bars each way bottom7'-0" x 7'-0" x 1'-5" thick 6- #6 bars each way bottom7'-6" x 7'-6" x 1'-6" thick 7- #6 bars each way bottom8'-0" x 8'-0" x 1'-7" thick 8- #6 bars each way bottom8'-6" x 8'-6" x 1'-9" thick 9- #6 bars each way bottom9'-0" x 9'-0" x 1'-10" thick 10- #6 bars each way bottom9'-6" x 9'-6" x 1'-11" thick 8- #7 bars each way bottom10'-0" x 10'-0" x 2'-0" thick 9- #7 bars each way bottom10'-6" x 10'-6" x 2'-1" thick 10- #7 bars each way bottom11'-0" x 11'-0" x 2'-2" thick 11- #7 bars each way bottom11'-6" x 11'-6" x 2'-3" thick (3,000 PSF Bearing Pressure) F45 F40 F50 F55 F60 F65 F70 F75 F80 F85 F90 F95 F100 F105 F110 F115 Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Foot ing Type "F30"T.F .E . -4 '-0"Foot ing Type "F30"T.F .E . -4 '-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"F o o t i n g T y p e " F 3 0 "T.F.E. -4'-0"F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " Unreinforced3'-0" x 3'-0" x 1'-0" thickF30 Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T . F . E . - 4 ' - 0 " 21'-8"2'-4"2'-4" 8"8"5'-0"F A B B B B B A A A C D B C D E Slab control or construction joist (typical) Overpour slab @ entry door (typical) Overpour slab @ garage door Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F95"T.F.E. -1'-4"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type " F 4 0 " T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T.F.E. -4'-0"Footing Type "F50"T . F . E . - 4 ' - 0 "Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Foo t i n g T y p e " F 4 5 " T.F . E . - 4 ' - 0 "Footing Type "F55"T.F.E. -4'-0"F o o t i n g T y p e " F 5 5 " T . F . E . - 4 ' - 0 "Footing Type "F40"T.F.E. -4'-0"Footing Type "F60"T.F.E. -4'-0"Footing Type "F60"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F70"T.F.E. -0'-8"Footing Type "F100"T.F.E. -4'-0"Footing Type "F90"T.F.E.-3'-4"Footing Type "F75"T.F.E. -0'-8"Footing Type "F75"T.F.E. -0'-8"Footing Type "F95"T.F.E. -0'-8"Footing Type "F75"T.F.E. -0'-8"Footing Type "F75"T.F.E. -3'-4"Footing Type "F95"T.F.E. -3'-4"Foot i n g T y p e " F 4 0 " T.F. E . - 4 ' - 0 "Footing Type "F95"T.F.E. -4'-0"3'-0"3'-0" 3'-0"3'-0"8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing Footing Type "F90"T . F . E . - 1 ' - 4 "Footing Type "F80"T.F.E. -0'-8"8 #5 bars long and #5 bars @ 9"o.c. short in addition to elevator pit reinforcing Footing Type "F100"T.F.E. -4'-0"Footing Type "F90"T.F.E. -4'-0"Footing Type "F85"T.F.E. -4'-0"5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" F F F F F FF 1 1 1 1 1 D T.P . E . 2'-0 " A T.P.E.2'-0"B T.P.E.-1'-4"B T.P.E.- 0 ' - 8 " B T . P . E .-0'-8"B T.P.E.-0'-8"C T.P.E.-0-'8"C T.P.E.-0'-8"B T.P.E.-0'-8"C T.P.E.-0'-8"C T . P . E .-0'-8"C T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"B T.P.E.-0'-8"B T . P . E .-0'-8"B T.P.E.- 0 ' - 8 " FT.P.E.0' - 6 " F T . P . E .0'-6"F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"F T . P . E .0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"B T.P . E . -0'- 8 " B T.P.E.- 0 ' - 8 " E T.P.E.2'-0"D T.P.E.2'-0"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P.E. 0'-6"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 " BT.P.E.-1'-4"AT.P.E.2' - 0 " AT.P .E .2'-0" B T.P . E . -1'- 4 " B T.P.E.-0'-8"BT.P.E.-0'-8"BT.P.E.-0'-8"A T.P.E.2'-0"BT.P.E. -0'-8" BT.P.E.-0'-8"BT.P.E.-0'-8"B T.P.E. -0'-8" B T.P.E.-0'-8"BT.P.E.-0'-8"B T.P.E.-0'-8"FT.P.E.0'-6"B T.P . E . -0'- 8 "UpUpUp UpB T.P.E. -0'-8" F T.P.E . 0'-6" -1.00" -0.00" -0.00" -0.00" -0.75" -0.00" -0.75" -0.00"-0.00"-0.00" -0.00" -0.75"-0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -1.50" -1.50" -1.50" -0.00" -1.50"-1.50" -8.50" -8.50" B StepWallStep Wall Shear Wall No. 3Shear Wall No. 4 2 2 2" cover Sawcut control joint 13 4" deep 2" cover 2x4 keyway Tooled edges 1 8"Scale: 3/4" = 1'-0" Construction Joint Cut 50% of the mesh in line with the control joint 5"5" concrete slab with 6x6 - W2.9 x W2.9 wwf 5"5" concrete slab with 6x6 - W2.9 x W2.9 wwf 1 8"8" 1'-4" 5" Slab Joint Details Control Joint Locate At Control joint See Plan For Location Scale: 3/4" = 1'-0" Grade Preparation Detail 1'-0"5" concrete slab (see sections for reinforcing) 15 mil "Stego Wrap" vapor barrier 6" base of crushed stone vapor break (ASTM 57 blend material) Compacted subgrade 6"12" compacted imported structural fill 3" cover3" coverStep (t)2 x (t) 1 1 Provide standard 90° hook on ends of higher reinforcing Standard Lap Footing Step Detail Scale: 3/4" = 1'-0" Photo No. 1 Approximately at E and 38 facing east.Photo No. 2 Near T and 32, facing south. Photo No. 3 Blanket removed by this representative to reveal the underlying native sand and silt. Rosetti Acquisitions LLC Project Number:JB201133 Attn: Christopher Falvey Report Number: JB201133.0033 427 New Karner Rd Technician: Jared Hall 30 Corporate Cir Ste 201 Albany, NY 12205 Date: 12/10/20 Albany, NY 12203-5169 Scale: Not to Scale 518-266-0310