RPLUM-002294-2020 05222020INSPECTION WORKSHEET (RPLUM-002294-2020)
CC-0080-2020Permit Management
Case Number:Case Module:
05/22/2020Partial Pass
Inspection Date:Inspection Status:
John O'BrienRough Plumbing
Inspector:Inspection Type:
288.12-1-21
Job Address:Parcel Number:
1454 State Rte 9
Lake George, NY 12845
Contact TypeCompany NameName
ApplicantDAVE KENNY
ArchitectRucinski-Hall Architecture
ContractorEllsworth Excavating
Granted Permission1454 State Route 9, LLCDave Kenny
Primary Owner1454 State Route 9, LLCDave Kenny
Checklist ItemPassedComments
Building Inspector NotesFalse
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
Pressure TestFalse
Pressure TestTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
3" Vent Through RoofFalse
Washing Machine Drain 2 inch minimumFalse
All Return Air Hard Duct WorkFalse
5 psi or 10 ft. above highest conn. for 15 minutesTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
Rough Plumbing / Nail PlatesFalse
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
Duct Testing Outside Conditioned SpaceFalse
Plumbing Under SlabFalse
Shower liner test (2" of water)False
Water Supply PipingFalse
Duct Insulation - if required in unheated spacesFalse
Duct work sealed properlyFalse
Cleanout every 100 feet change of directionFalse
Plumbing Vent Vents in PlaceFalse
Air Test Gas Piping 10 psi for 10 MinutesFalse
Washing Machine Trap: 18"-42" dischargeFalse
Air HeadFalse
Air HeadTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
50 P.S.I for 15 minutesFalse
1 ½ inch minimum Drain SizeFalse
Drain VentTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
December 11, 2020Page 1 of 1