Loading...
RPLUM-002294-2020 05222020INSPECTION WORKSHEET (RPLUM-002294-2020) CC-0080-2020Permit Management Case Number:Case Module: 05/22/2020Partial Pass Inspection Date:Inspection Status: John O'BrienRough Plumbing Inspector:Inspection Type: 288.12-1-21 Job Address:Parcel Number: 1454 State Rte 9 Lake George, NY 12845 Contact TypeCompany NameName ApplicantDAVE KENNY ArchitectRucinski-Hall Architecture ContractorEllsworth Excavating Granted Permission1454 State Route 9, LLCDave Kenny Primary Owner1454 State Route 9, LLCDave Kenny Checklist ItemPassedComments Building Inspector NotesFalse 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved Pressure TestFalse Pressure TestTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 3" Vent Through RoofFalse Washing Machine Drain 2 inch minimumFalse All Return Air Hard Duct WorkFalse 5 psi or 10 ft. above highest conn. for 15 minutesTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved Rough Plumbing / Nail PlatesFalse 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved Duct Testing Outside Conditioned SpaceFalse Plumbing Under SlabFalse Shower liner test (2" of water)False Water Supply PipingFalse Duct Insulation - if required in unheated spacesFalse Duct work sealed properlyFalse Cleanout every 100 feet change of directionFalse Plumbing Vent Vents in PlaceFalse Air Test Gas Piping 10 psi for 10 MinutesFalse Washing Machine Trap: 18"-42" dischargeFalse Air HeadFalse Air HeadTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 50 P.S.I for 15 minutesFalse 1 ½ inch minimum Drain SizeFalse Drain VentTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved December 11, 2020Page 1 of 1