RPLUM-005629-2020 10082020INSPECTION WORKSHEET (RPLUM-005629-2020)
CC-0080-2020Permit Management
Case Number:Case Module:
10/08/2020Passed
Inspection Date:Inspection Status:
John O'BrienRough Plumbing
Inspector:Inspection Type:
288.12-1-21
Job Address:Parcel Number:
1454 State Rte 9
Lake George, NY 12845
Contact TypeCompany NameName
ApplicantDAVE KENNY
ArchitectRucinski-Hall Architecture
ContractorEllsworth Excavating
Granted Permission1454 State Route 9, LLCDave Kenny
Primary Owner1454 State Route 9, LLCDave Kenny
Checklist ItemPassedComments
Building Inspector NotesFalse
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
Pressure TestTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
Pressure TestFalse
3" Vent Through RoofTrue
Washing Machine Drain 2 inch minimumFalse
All Return Air Hard Duct WorkFalse
5 psi or 10 ft. above highest conn. for 15 minutesTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
Rough Plumbing / Nail PlatesTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
Duct Testing Outside Conditioned SpaceFalse
Plumbing Under SlabFalse
Water Supply PipingFalse
Duct Insulation - if required in unheated spacesFalse
Duct work sealed properlyFalse
Cleanout every 100 feet change of directionTrue
Plumbing Vent Vents in PlaceFalse
Air Test Gas Piping 10 psi for 10 MinutesFalse
December 11, 2020Page 1 of 2
INSPECTION WORKSHEET (RPLUM-005629-2020)
Checklist ItemPassedComments
Washing Machine Trap: 18"-42" dischargeFalse
Air HeadFalse
Air HeadTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
50 P.S.I for 15 minutesFalse
1 ½ inch minimum Drain SizeTrue
Drain VentTrue
5/22/20 Rough Plumbing Partial Approval
- Roof Drains Head Test Approved
6/22/20 Rough Plumbing Partial Approval
- Sanitary drainage from main floor to crawl space approved
- 10' head test witnessed
December 11, 2020Page 2 of 2