Loading...
RPLUM-005629-2020 10082020INSPECTION WORKSHEET (RPLUM-005629-2020) CC-0080-2020Permit Management Case Number:Case Module: 10/08/2020Passed Inspection Date:Inspection Status: John O'BrienRough Plumbing Inspector:Inspection Type: 288.12-1-21 Job Address:Parcel Number: 1454 State Rte 9 Lake George, NY 12845 Contact TypeCompany NameName ApplicantDAVE KENNY ArchitectRucinski-Hall Architecture ContractorEllsworth Excavating Granted Permission1454 State Route 9, LLCDave Kenny Primary Owner1454 State Route 9, LLCDave Kenny Checklist ItemPassedComments Building Inspector NotesFalse 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed Pressure TestTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed Pressure TestFalse 3" Vent Through RoofTrue Washing Machine Drain 2 inch minimumFalse All Return Air Hard Duct WorkFalse 5 psi or 10 ft. above highest conn. for 15 minutesTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed Rough Plumbing / Nail PlatesTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed Duct Testing Outside Conditioned SpaceFalse Plumbing Under SlabFalse Water Supply PipingFalse Duct Insulation - if required in unheated spacesFalse Duct work sealed properlyFalse Cleanout every 100 feet change of directionTrue Plumbing Vent Vents in PlaceFalse Air Test Gas Piping 10 psi for 10 MinutesFalse December 11, 2020Page 1 of 2 INSPECTION WORKSHEET (RPLUM-005629-2020) Checklist ItemPassedComments Washing Machine Trap: 18"-42" dischargeFalse Air HeadFalse Air HeadTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed 50 P.S.I for 15 minutesFalse 1 ½ inch minimum Drain SizeTrue Drain VentTrue 5/22/20 Rough Plumbing Partial Approval - Roof Drains Head Test Approved 6/22/20 Rough Plumbing Partial Approval - Sanitary drainage from main floor to crawl space approved - 10' head test witnessed December 11, 2020Page 2 of 2