Loading...
FRM-005627-2020 10082020INSPECTION WORKSHEET (FRM-005627-2020) CC-0080-2020Permit Management Case Number:Case Module: 10/08/2020Passed Inspection Date:Inspection Status: John O'BrienBuilding Framing Inspector:Inspection Type: 288.12-1-21 Job Address:Parcel Number: 1454 State Rte 9 Lake George, NY 12845 Contact TypeCompany NameName ApplicantDAVE KENNY ArchitectRucinski-Hall Architecture ContractorEllsworth Excavating Granted Permission1454 State Route 9, LLCDave Kenny Primary Owner1454 State Route 9, LLCDave Kenny Checklist ItemPassedComments Building Inspector NotesFalse 5/8/20 Framing Partial Approval Remaining Items: - Add thunder studs at bottom plate splices 1' from splice both sides. - Locate attic access in each space. - Relocate lateral brace in trusses interfering with roof hatch. - Provide detail of modified roof framing for roof top units ductwork. Once I receive detail I will reinspect. - Provide structural framing report from special inspector. - Complete air sealing of sheathing and joint between bottom of sheathing and concrete wall. 5/12/20 Framing Partial Approval Remaining Items: - Relocate lateral brace in trusses interfering with roof hatch. - Provide detail of modified roof framing for roof top units ductwork. Once I receive detail I will reinspect. - Provide structural framing report from special inspector. 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. Air Seal all Plates and SillsTrue Joist hangersFalse 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. Draft stopping 1,000 sq. ft. floor trussesTrueTruss Draftstop approved Design Professional Sign-off, if requiredFalse 5/12/20 Framing Partial Approval Remaining Items: - Relocate lateral brace in trusses interfering with roof hatch. - Provide detail of modified roof framing for roof top units ductwork. Once I receive detail I will reinspect. - Provide structural framing report from special inspector. 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. December 11, 2020Page 1 of 2 INSPECTION WORKSHEET (FRM-005627-2020) Checklist ItemPassedComments Anchor Bolts 6 ft. or less on centerTrue Ice and water shield 24 inches from wallTrue 12 O.C.True Air Sealing all Joints Before InsulationTrue Notches Holes Bearing WallsTrue Truss Specification ProvidedTrue 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. Bracing BridgingTrue 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. Jack Studs HeadersTrue Jack Posts Main BeamsTrue Attic Access 22 x 30 minimumTrue Exterior sheeting nailed properlyTrue Hurricane Clips/Uplift Screws/Nail Holes FilledTrue FramingTrue 5/8/20 Framing Partial Approval Remaining Items: - Add thunder studs at bottom plate splices 1' from splice both sides. - Locate attic access in each space - Relocate lateral brace in trusses interfering with roof hatch. - Provide detail of modified roof framing for roof top units ductwork. Once I receive detail I will reinspect. - Provide structural framing report from special inspector. 5/12/20 Framing Partial Approval Remaining Items: - Relocate lateral brace in trusses interfering with roof hatch. - Provide detail of modified roof framing for roof top units ductwork. Once I receive detail I will reinspect. - Provide structural framing report from special inspector. 5/18/20 Framing Partial Approval - HVAC framed openings approved. Received truss manufacturer's approval along with Ethan Hall's Roof Framing As-Built. Headroom 6 ft. 8 in.True December 11, 2020Page 2 of 2