FRM-005627-2020 10082020INSPECTION WORKSHEET (FRM-005627-2020)
CC-0080-2020Permit Management
Case Number:Case Module:
10/08/2020Passed
Inspection Date:Inspection Status:
John O'BrienBuilding Framing
Inspector:Inspection Type:
288.12-1-21
Job Address:Parcel Number:
1454 State Rte 9
Lake George, NY 12845
Contact TypeCompany NameName
ApplicantDAVE KENNY
ArchitectRucinski-Hall Architecture
ContractorEllsworth Excavating
Granted Permission1454 State Route 9, LLCDave Kenny
Primary Owner1454 State Route 9, LLCDave Kenny
Checklist ItemPassedComments
Building Inspector NotesFalse
5/8/20 Framing Partial Approval
Remaining Items:
- Add thunder studs at bottom plate splices 1' from splice both
sides.
- Locate attic access in each space.
- Relocate lateral brace in trusses interfering with roof hatch.
- Provide detail of modified roof framing for roof top units ductwork.
Once I receive detail I will reinspect.
- Provide structural framing report from special inspector.
- Complete air sealing of sheathing and joint between bottom of
sheathing and concrete wall.
5/12/20 Framing Partial Approval
Remaining Items:
- Relocate lateral brace in trusses interfering with roof hatch.
- Provide detail of modified roof framing for roof top units ductwork.
Once I receive detail I will reinspect.
- Provide structural framing report from special inspector.
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
Air Seal all Plates and SillsTrue
Joist hangersFalse
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
Draft stopping 1,000 sq. ft. floor trussesTrueTruss Draftstop approved
Design Professional Sign-off, if requiredFalse
5/12/20 Framing Partial Approval
Remaining Items:
- Relocate lateral brace in trusses interfering with roof hatch.
- Provide detail of modified roof framing for roof top units ductwork.
Once I receive detail I will reinspect.
- Provide structural framing report from special inspector.
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
December 11, 2020Page 1 of 2
INSPECTION WORKSHEET (FRM-005627-2020)
Checklist ItemPassedComments
Anchor Bolts 6 ft. or less on centerTrue
Ice and water shield 24 inches from wallTrue
12 O.C.True
Air Sealing all Joints Before InsulationTrue
Notches Holes Bearing WallsTrue
Truss Specification ProvidedTrue
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
Bracing BridgingTrue
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
Jack Studs HeadersTrue
Jack Posts Main BeamsTrue
Attic Access 22 x 30 minimumTrue
Exterior sheeting nailed properlyTrue
Hurricane Clips/Uplift Screws/Nail Holes FilledTrue
FramingTrue
5/8/20 Framing Partial Approval
Remaining Items:
- Add thunder studs at bottom plate splices 1' from splice both
sides.
- Locate attic access in each space
- Relocate lateral brace in trusses interfering with roof hatch.
- Provide detail of modified roof framing for roof top units ductwork.
Once I receive detail I will reinspect.
- Provide structural framing report from special inspector.
5/12/20 Framing Partial Approval
Remaining Items:
- Relocate lateral brace in trusses interfering with roof hatch.
- Provide detail of modified roof framing for roof top units ductwork.
Once I receive detail I will reinspect.
- Provide structural framing report from special inspector.
5/18/20 Framing Partial Approval
- HVAC framed openings approved. Received truss
manufacturer's approval along with Ethan Hall's Roof Framing
As-Built.
Headroom 6 ft. 8 in.True
December 11, 2020Page 2 of 2