BINS-001217-2019 03012019INSPECTION WORKSHEET (BINS-001217-2019)
CC-0005-2019Permit Management
Case Number:Case Module:
03/01/2019Partial Pass
Inspection Date:Inspection Status:
John O'BrienCommercial Final Inspection
Inspector:Inspection Type:
308.20-1-3.3
Job Address:Parcel Number:
75 Carey Rd
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantJ. Luke Construction
ArchitectMonarch Design Group LLC
ContractorJ. Luke Construction
Granted PermissionOkie Properties, LLC
Primary OwnerOkie Properties, LLC
TenantMotimac USA
Checklist ItemPassedComments
Low flow toilet 1.3 gal/flushing cycleTrue
Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire DoorsFalse
Bldg Num or Tenant Address on Bld or DriveTrueInstall Suite Number
Gas Shut-off Exposed & Regulator (18) Above GradeTrue
Handicapped Service Counters 34 inchFalse
-Install break room counter with sink as per plan, range not
allowed. Remove outlet box from break room partition, wiring and
breakers from panel for range.
Gas Furnace Shut OffTrue
Engineer or Architect ApprovalTrue
Chimney Rain Cap InstalledTrue
OK to Issue C/OFalse
2/28/19 Final Inspection Not Approved
Remaining Items:
-Submit HVAC Air Balancing Report for Suite #1 & #2
-Install Suite Number
-Install right handed flush handle handicapped toilet.
-Install break room counter with sink as per plan no stove.
-Complete Fire Marshal's Items.
Chimney / B Vent / Direct Vent LocationTrue
Universal Symbol of Access displayedTrue
Final Electrical / Flex Gas Piping BondedTrue
Plumbing Vent Through Roof/Roof completeTrue
Relief Valve ,Heat Trap/Water Temp 110 deg or lessTrue
Handicapped Bath/Parking Lot SignageTrue
Exits At Grade Or Platform 36 (w) x 44 (l)True
H/C toilet flush handle on open sideTrue
December 15, 2020Page 1 of 2
INSPECTION WORKSHEET (BINS-001217-2019)
Checklist ItemPassedComments
OK to Issue Temporary C/OFalse
3/1/19 Final Inspection Partial Approval-Ok to Issue a Temporary
CO!
Conditions
-Submit HVAC Air Balancing Report for Suite #2
-Install break room counter with sink as per plan, range not
allowed. Remove outlet box from break room partition, wiring and
breakers from panel for range.
-Complete outstanding Fire Marshal’s item regarding wiring of
emergency lights and exit signs for each individual tenant space.
Occupancy sensor lighting controlTrue
Special InspectionsFalse-Submit HVAC Air Balancing Report for Suite #2
Doors 36 inch wLever Hand Panic Hardware, if reqTrue
Floor Bathroom Watertight Other Floors OkayTrue
December 15, 2020Page 2 of 2