Loading...
3.14 3.14 FINANCIALU020\Purchase-Cemetery Storage Building-Bluescope Construction-Best Value and Piggybacking-Sourcewell-Establish Capital Project Transfer From Capital Reserve 64-12-20 RESOLUTION AUTHORIZING PURCHASE AND CONSTRUCTION OF STORAGE BUILDING AT PINE VIEW CEMETERY BY BLUESCOPE CONSTRUCTION, INC. AND ESTABLISHMENT OF CEMETERY STORAGE BUILDING CAPITAL PROJECT FUND #236 RESOLUTION NO.: ,2020 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury's Cemetery Superintendent and Cemetery Commission have recommended that the Town Board authorize the establishment of a Cemetery Storage Building Capital Project to provide for the purchase and construction of a storage building at the Pine View Cemetery,and WHEREAS, Sourcewell is a cooperative, municipal purchasing program that specifically benefits municipalities countrywide, including the Town of Queensbury, which program combines competitive bidding and best value criteria, and WHEREAS, the New York State Legislature adopted legislation allowing any political subdivision in New York State to "piggyback" off an existing County/State Bid and therefore, due to the agreeable and advantageous terms represented by BlueScope Construction, Inc., in this instance, the Town of Queensbury wishes to piggyback with Sourcewell for the purchase and installation of a Rough Order Magnitude (ROM) Storage Building as set forth in BlueScope Construction's letter and proposal dated November 13, 2020 for the amount of $498,588 as presented at this meeting,and F WHEREAS, the Town of Queensbury will adhere to all New York State bidding requirements, and WHEREAS, the Town Board wishes to accordingly establish Cemetery Storage Building Capital Project No.: 236 and authorize withdrawals and expenditures in the amount of$498,588 from Capital Reserve No. 64 to fund this Capital Project, and WHEREAS, in accordance with New York State General Municipal Law §6(c), the Town Board is authorized to withdraw and expend funds from Capital Reserve No. 64 subject to permissive referendum, NOW, THEREFORE,BE IT RESOLVED, that the Queensbury Town Board hereby authorizes establishment of Cemetery Storage Building Capital Project No. 236 in the amount of $498,588 to establish funding for expenses related to the Cemetery Storage Building Capital Project described in the preambles of this Resolution, and BE IT FURTHER, RESOLVED, that the Queensbury Town Board hereby approves and authorizes the finalization of design consistent with the Sourcewell bid and purchase and construction of a Rough Order Magnitude (ROM) Storage Building by Blue as set forth in BlueScope Construction Inc.'s letter and proposal dated November 13, 2020 substantially in the form presented at this meeting and in accordance with the cooperative, municipal purchasing program Sourcewell for the amount of $498,588, and BE IT FURTHER, RESOLVED, that the Town Board acknowledges that the exact details of such building and the price will be determined consistent with the Sourcewell bid during the finalization of design process and that the Town Board will have to approve such bidding and final price at that time if different than that approved in this Resolution and if the Town Board should approve a total cost for the building of at least$500,000, it is a condition of approval that BlueScope Construction, Inc. shall have to comply with the New York State Wicks Law for this project,and BE IT FURTHER, RESOLVED, that this Resolution is contingent upon BlueScope Construction, Inc., paying prevailing wages as required for municipal projects under New York State Laws, and BE IT FURTHER, RESOLVED, that the Town Board hereby finds that the withdrawals and expenditures for such Capital Project are expenditures for a specific capital project for which the Capital Reserve Fund No. 64 was established, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs establishment of appropriations and estimated revenues as follows: 0 001-9950-9030-0064 Transfer to Capital Project- $498,588 • 236-0000-55031 Interfund Revenues - $498,588 • 236-8810-2899 Capital Construction - $498,588 and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Budget Officer k to amend the Town Budget, make any adjustments, budget amendments, transfers or prepare any documentation necessary to establish such appropriations and estimated revenues, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to execute any necessary documentation, including any needed Agreement between the Town and B1ueScope Construction, Inc., in form acceptable to the Town Supervisor, Cemetery Superintendent, Town Budget Officer and/or Town Counsel, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor, Cemetery Superintendent, Town Budget Officer, Purchasing Agent and/or Town Counsel to take any and all action necessary to effectuate the terms of this Resolution, and BE IT FURTHER, RESOLVED, that this Resolution is subject to a permissive referendum in accordance with the provisions of Town Law Article 7 and the Town Board hereby authorizes and directs the Town Clerk to publish and post such notices and take such other actions as may be required by law. Duly adopted this 2Is'day of December, 2020, by the following vote: AYES NOES ABSENT: CONSTRUCTIONBLUESCOPE November 13,2020 Ms. Barbara Tierney 742 Bay Rd, Queensbury, NY 12804 Regarding: Pineview Cemetery Storage Building ROM Queensbury, NY Dear Ms. Barbara Tierney: BlueScope Construction is pleased to present our Rough Order Magnitude(ROM)for the above referenced facility, Our history of service includes the successful competition of over 1,000 projects without termination,litigation or liquidated damages. We hope this type of service history will be part of the evaluation of each competitive offer as you review"best value"for this project. We look forward to offering our service to your agency for this new facility. By purchasing this facility through the Sourcewell contract,you can buy the building and construction services without going through the traditional bid process,saving you time and money.Additionally,the design-build process is collaborative and ensures you get the facility you desire at the price you have funded. Under this offering,we provide a firm fixed price so you can avoid the high cost of multiple change orders.You'll still get the local execution on the project you desire along with factory-direct pricing on the building shell.You'll find this method is much easier than typical procurement methods and helps you avoid the pitfalls of the low bid process. As General Contractor, BlueScope Construction is teaming with Whelan and Curry Construction local builder in the role of Prime Subcontractor.As the prime subcontractor Whelan and Curry Construction will be responsible for coordinating all local on-site vendors, trades and subcontractors This is our typical project approach, utilizing local specialists known and trusted to perform at a high level of quality and service.We believe this approach will be the best value:national experience and oversight from BlueScope Construction and local presence and small business participation from Whelan and Curry Construction. We believe our ROM is the best value based on the following: • BlueScope Construction is the preeminent supplier of pre-engineered buildings(PEB)with multiple North American manufacturing plants. BlueScope Buildings a member of the Metal Building Manufacturers Association,Design-Build Institute, and US Green Building Council. • BlueScope Building PEB brands,including Butler Buildings,are the world's most popular brands with more total in- place square footage than any other manufacturer. • As part of BlueScope Buildings, BlueScope Construction offers factory-direct pricing on the PEB at most favored customer pricing. • The Butler-Cote TM standard finishing system on metal panels has a 25-year warranty guaranteeing resistance to chalking and fading of the paint. This includes blistering,peeling,cracks or chipping. • The MR-240 metal roof system is the most specified standing seam metal roof in the industry and has an available 20-year weather tightness warranty. • BlueScope Construction is a national contractor with a direct connection to a local general contractor network giving you a local presence and small business participation on your project. Copyright BlueScope Construction,Inc.2020.This Proposal contains infamalion oonfio gr0al and proprietary to BlueScope Conskx bon,Inc.Anyinformaton,data and drawings included in this Proposal are supplied to you with the understanding that they W1be hell confidentially,used ody for the purpose of evaluabhg this Proposal,and wilt not be disused to third partes without the prior written consent of BlueScope Constnrction,Inc. 11-13-2020 Page 2 of 2 • Our experienced team has built over 1,000 government projects. • We offer unparalleled customer service with more than 85%of our business each year from repeat customers. • BlueScope Construction and BlueScope Buildings have outstanding quality control and the capability to build to the highest levels of construction performance. For these and many other reasons noted throughout this ROM,we believe you will receive the best value building by utilizing BlueScope Construction.Attached are the"Scope of Work"and"Schedule of Values"documents to complete our ROM. Please note that this offer is based on a design-build solution and the Scope of Work defines the intent of our proposed offer to furnish and install this Project for the price listed on the Schedule of Values document as per our Sourcewell purchasing cooperative contract vehicle. Thank you for your interest in our BlueScope Construction team and our Sourcewell contract for your facility needs. We welcome any questions or comments you may have regarding this ROM. Please contact Rasa at the number stated below. Regards, Rasa Kozak Brian Aldrich Project Manager Director, Government Services Phone: 816.245.6421 Phone: 816.245.6886 Cell: 816.681,4328 Fax: 816.245.6899 rasa.kozak(a bluescopeconstruction.com bn aid rich(a)_biuescopeconstruction.corn Copynght BlueScope Conshchon,Inc.2020.This Pmisal contains information confidential and propmtary to BlueScope Construction,Inc.Anyinfumation,data wd drawings induded h this Pmposal are supoiied to you with the understanding that they will be hell confidentially,used only for the purpose of evaluaPng this PrWai,,and will not be disclosed to third parties without the pnor w den coned of BlueScope Consftdon,Inc. x Town 91 Quqansl"'Iry' NY i 2,1643 )tiqe Building i312020 ATTACHMENT A SCOPE OF WORK BUTLER BUILDING MATERIALS {f Division 13 TRUCTION BUTLER Budding Structural System General The Building Structural System furnished by Butler Manufacturing/BlueScope Construction shall be as follows: Unit 1 30'-0" 80'-0" 1 14'-0" LRST 1 :12 4 @ 20' Low Str'Il,;tUroi Type Description—Genera! Pre-engineered Building Systems(PEB) The design of the LRST—single slope with tapered columns The endwall of the structural systems consist of rigid frames with endwall post.The endwalls have not been designed for future building expansion. In the longitudinal direction of these structural systems, rod bracing,portal frame will be used to resist longitudinal loads. This primary framework supports roof structurals and wall structurals,which, in turn,support the roof panels and wall panels, respectively. Roof structurals will consist of cold form Z's or C's appropriately designed to meet design criteria. The wall structurals consist of cold form Z's or C's designed to resist horizontal loads from the walls. Unless specified otherwise,BlueScope Construction will determine the structural system and the type and configuration of components that make up the structural system that satisfy the requirements necessary to meet codes,loads,building layout and clearances. 8LUE SCOPE CONSTRUCTION RUCTI ,terI x fawn of Queensbfrrry QueenSb'Uty, "NY 21543—Cemetery Staracpe Building `ti [ d+j Oesicin criteria i - •• International Buildin Code 14C18 I ur i' I • 2018 •• Standard Occu angZ Structure -.. ... a ... - ••• _20 psf(non-reducible) __ •• ••• 5 psf or actual-whichever greater ••• 5 psf • 115 mph Exposure B • Enclosed • Ss=23.8% S1=6.8% B •• none . • •• L1180 Live load • U100 10- ear wind or lateral crane_ e •• L/150(Live load) L190(10-year wind) Structural Steel Desire", All structural mill sections or welded-up plate sections shall be designed in accordance with the 15th Edition of the A1SC Specifications for the Structural Steel Buildings.Cold-formed steel structural members shall be designed in accordance with AISI Specification for the Design of Cold-Formed Steel Structural Members.Steel bar joists shall comply with specifications of the Steel Joist Institute. Wal&?ig Welding procedures shall be in accordance with the American Welding Society Structural Welding Code. Structu"al `ain iog All Butler structural steel components shall be factory cleaned to remove all loose mill scale and other foreign material generally conforming to SSPC-SP 2(Hand Tool Cleaning). The parts are shop coated with a single coat of gray corrosion inhibiting primer keeping with Steel Structures Painting Council(SSPC)Paint Specification 15.This primer is considered a temporary and provisional coating. This single coat primer is not an intermediate or finish coat. Cold formed Z's and C's will be G-30 galvanized and clear acrylic coated. ' A�F' #?{..i§ ,e oitL Unless requested by client,anchor bolts,embedded plates,handrail,pipe bollards,and other miscellaneous steel components are excluded from the building shell unless specifically included in our ROM. Use of ESFR sprinkler systems will require coordination of the sprinkler heads and the roof secondary members. If this coordination does not occur during the design of the steel building,field modifications may be required.The engineering and any field modifications required will be billed as a change order. OwI III �' •.Ii a • � ; u� � SLUESCOPE CONSTRIKIION Queensbury, NY s43— Cetneror✓Sh lrage Building 11/13/2020 BUTLER -)4"` Roof' stern i _. General The roof shall be MR-240 roof system as furnished by Butler Manufacturing as follows: Panels shall be factory roll-formed, 24"wide,with two major corrugations,2" high l4 (2%"including seam),24"on center.The flat of the panel shall contain cross flutes 6" r on center perpendicular to the major corrugations the entire length of the panel. Ridge assembly shall be designed to allow roof panels to move with expansion and contraction. r Roof panels shall be factory pre-punched at panel end to match pre-punched holes in the eave structural member. Panel end splices shall be pre-punched and pre- notched. 'Y A „{x Panel Maferiaj and Finish _ Panel material and finish shall be 24-gauge steel coated both sides with a layer of acrylic coated Galvalume°aluminum-zinc alloy(approximately 55%aluminum,45% zinc)applied by the continuous hot dip method. Minimum 0.55-ounce coated weight per square foot as determined by the triple spot test per ASTM Specification A-792.A clear acrylic film is applied for additional protection. System Design MR-24 roof system panel shall be designed in accordance with AISI Specifications for the Design of Light-Gauge,Cold-Formed Steel Structural Members or CAN/CSAS136 Cold-Formed Steel Structural Members—latest edition. Panel system shall be designed to support design live load. All endwail trim and roof transition flashings shall allow the roof panel to move relative to the wall panels as the roof expands and contracts with temperature change. Connection of MR-24 roof system panel-to-structural members,except at eave,shall be made with clips with movable stainless steel tabs that are seamed into standing seam side laps. MR-24 roof system panel-to-panel connections shall be made with a positive,field-formed standing double-lock seam,formed by a special lock seaming machine.The <.;w.. machine field forms the final 180 degrees of a 360- >'ime"eam degree Pittsburgh double-lock standing seam;all side "a lap sealant shall be factory applied. E.. us f S� � 1+`8iJs The MR-24 Roof System carries an Underwriters Laboratories(U.L.)wind uplift resistance classification of 90 to ensure structural integrity and possible reduction of insurance rates(construction numbers 62,62A,&178). 6pti.^I SqS;./O�bg'E 4 row/7 of Quagnsburry Queensb?ury, NY 11113/2020 Provision f r ExpansiordContraction (' Provision for thermal expansion movement of the MR-24 roof system panel shall be accomplished by the use of clips with a factory centered,stainless steel moveable tab.A force of no more than 8 pounds will be required to initiate tab movement. Each i clip shall accommodate a minimum movement of 1.25"in either direction. BUTLER Roof Accessories Gutter and Downspouts Gutter shall be Butler contour type(4-%"wide x 5"deep)and shall be provided with downspouts(4"x 3")at eaves. Gutter and downspouts shall be fabricated from 26-gauge galvanized steel,ASTM A924,G90 coating,and shall be painted in a Butler-Cote®paint finish in standard color. Gable Trim Gable trim shall be Butler contour type and shall be provided at gables.Gable trim shall be fabricated from 26-gauge galvanized steel,ASTM A525,G90 coating,and shall be painted in a Butler-Cote®paint finish in a standard color. Ear w i rir, Eave trim shall be Butler contour type and shall be provided at eaves. Eave trim shall be fabricated from 26-gauge galvanized steel,ASTM A525,G90 coating,and shall be painted in a Butler-Cote® paint finish in a standard color. . .� — � o Qi-}eensbury, ;91Y 16 31_ ninelery Storage uiid,;ng SUTLEf� 1_)W.3JlTMWaH System f General ShadowallTM wall system panels shall be furnished by Butler Manufacturing as follows: , Panels shall be 36"wide with four major corrugations, 1-7/16"high and 12"on center with two minor corrugations between each of the major corrugations the entire length of the panel. Wail panels shall be factory pre-punched and shall match pre-punched holes in f --_12 �._{- '2=, 'Z structural. 0 � i Panel Design Panel design shall be in accordance with AISI Specification for the Design of Light- Gauge, Cold-Formed Steel Structural Members,or CAN/CSA-S136 Cold-Formed Steel Structural Members,and in accordance with sound engineering methods and practices. a ;ri i��ia��,• a! a;�:� ;"i;�is� f:c��3 +;Vi 't'�r; v3 Panel material and finish shall be 26-gauge painted Gaivalume@ aluminum-zinc alloy The ShadowalITIA system is designed to as per ASTM Specification A-792 with exterior colors of Butler-CoteO finish system,a " ' full strength,70% Kynar 500e or Hylar 50000 fluoropolymer(PVDF)coating. h 1 a 5 ha/`1Ja;i3!'t !;diccaf,,ng shall 9?Ge =,-�i. i}I 25 03 For : ? i H C�,i wo.,y. a period of 25 years chalking shall not exceed ASTM D4214#8 rating and will not fade more than 5 color difference units per ASTM D2244. Interior color shall be tight Gray polyester color coat not formulated for exterior weathering. Panel-to-structural connections shall be made using ScruboltTm fasteners with TorO heads or self-drilling screws with Torx heads. Panel-to-panel connections shall be made with self-drilling screws with Torx heads.All exposed fasteners shall be pre-painted to match wall color. MOD-36 wall liner panels shall be provided as follows: __-36 MOD-36 wall liner panels shall be formed from 28-gauge coated steel with a minimum yield strength of 80,000 psi and shall be nominal 36"wide with corrugations V high, 3"on center. Appropriate pre-painted outside corner,inside corner,channel cap,and trims at liner penetrations are included;however,base and column trims are excluded. ., 1 Tnvnof -lueensburry Queensbury, NY t 21343 a ('�meter tcrage Building 11/13/2020 1 � I IF Wall Accessories Butler Pre-Hung Personnel Boors Personnel doors shall be provided as per Butler's standard product offering as follows: (500 Series) (2) each—3'x 7'with panic hardware,closure and kick-plate Personnel doors shall be pre-hung hollow metal type and meet the requirements of Commercial Standards SDI-100. Door leaves shall be 1%"thick,full flush,constructed of 18-gauge hot dipped galvanized steel(A60),prime painted in beige color. Doors to have an insulated polystyrene core continuously bonded to door skins. Door frames shall be 16-gauge galvanized steel(A60)and prime painted in beige color. Doors shall be complete with aluminum threshold,weather-stripping,and full mortise ball bearing hinges. Doors shall have a Hager 701exit device with lever locket. Closers shall be falcon SC71 heavy duty. Overhead Door Openings Overhead door openings shall be provided as follows: Two(2)each 12'x 10' Two(2)each 12'x 12' Overhead door openings shall be as per Butler standard details complete with structural secondaries for jambs and head,drip gutter trim for head, and trims for jambs as appropriate for the Butler metal wall panels. BUTLER tac:r?us�x Roof and wall insulation shall be faced fiberglass blanket insulation furnished as follows: Roof—R19 (6"faced over pudins)uninsulated half of building Roof—R30 (6"faced over purlins bottom,3'/2"top layer)insulated half of building Wall—R19 (6"faced)%building plus the partition wall Note:The R-values listed above are not continuous where compressed at the purlins and gifts. Fiberglass shall be as outlined in the North American Insulation Manufacturing Association(NAIMA 202-96)specification,or equal.The fiberglass shall be faced with WMP-VR-R on one side.The composite of fiberglass and facing shall have surface burning characteristics not to exceed 25 flame spread and 50 smoke developed when tested in accordance with U.L.723 test method or ASTM E84 test method. C: The facing shall be WMP-VR-R. WMP-VR-R is composed of PSKP,white polypropylene film,fiberglass and polyester scrim, metallized polyester.The resulting facing shall have a water vapor transmission rate of 0.02 US perm(ASTM E96). L` 5SCOPE 4("'N STRtJCTIO 56 — Queensbury, AN .� 21643- {eMgte-y,Starige Building \ ;� 1312020 ( ilverc o ) Pialin Glide Fail protection f LIrlin Gjll e(registered trademark) f Is an OSHA-Compliant leading edge fall prevention(over the purlin)roof system that provides high R value with speed of installation,including bar joist.Single and Multiple Layer systems up to R32. Meets or exceeds ASTM E-84.The welding process produces seams that exceeds the ASTM D-751 for the fabric.The system allows flexibility under adverse weather conditions. M UFSCOP CONSTRUC TfON m � ToNrJCfQG'eetlSbClt' ueensbury. APY Storage Building 14111312 0?J l._ E 1 i ATTACHMENT A SCOPE OF WORK ANCILLARY SERVICES Architectural Services Structural Design and Engineering INSTALLATION AND SITE PREPARATION Division 1 t �: � ' IREMENTS General Conditions Project management Site supervision Site maintenance during construction Site Safety Program Final clean up—all work to be"broom clean"unless noted otherwise Division 2 - L ; TRUCTION Mobilization Slab preparation including six-inch(6")crusher run base Sidewalk prep-apron including six-inch(6")crusher run base Foundation excavation&backfill Site demolition—concrete pads at existing garages Earthwork-swale and misc.grading Storm drainage Division �,RETE Footing concrete figured to be 2'-0"x1'-0" Ten-inch(10")frost wall concrete at insulated portion of building 12"xl8"concrete haunch-unheated portion of building 2'-6"x2'-6"x4'-0"piers concrete 3'-6"x3'-6"x1'-0"piers footing concrete Six-inch(6")concrete slab Fibers for slab Concrete apron to be length of building five feet(5')wide and six-inch(6")depth Concrete reinforcement and accessories: Strip footing .P, 1 ___----.--• Queensbury; N� 1, 2164 —L'ernetery Storage Build i 1111312020 Wall Piers Pier footing 1 1 Haunch Chairs-footing and slab Under slab poly Expansion joint and cap Two(2)pump trucks Division NRY Not included Division xALS Not Included Division 6 - h.ASTICS Not Included Division 7 - THEk0 PROTECTION Two-inch(2")rigid insulation(R-10)at foundation Sill sealer/caulk Division 8 - L. '01INDOWS One(2) 12'x12' insulated sectional door Three(2) 12'x10' insulated sectional door Four(4)overhead door operators Division 9 FINISHES Not included Division i '11.TIES Not included Division e 1.1MENT Not included Division i . "'ISHINGS Not included Division 13 — INSTALL. & SPECIAL. CON; ,_90N Installation of Butler Building Materials, Summarized Above Complies with BlueScope Construction Safety practices ..• •..• as tot.Off SCOPE f 0012STRUCTION `W v 4tr;eueensburry ueensbury, N:, '176543 w Cam?tWy storage Building -= !1i 13/2020 Division 1 , SYSTEMS Not included - ! Division i u;. =� LAICAL 1 Provide HVAC system including two(2)tube style infrared heaters at insulated side of building Tie to existing sewer line to stub in building for future use Tie to existing water service line for hose bib connections Tie to existing gas service line-tie to tube heaters Oil water separator Four(4)catch basins Two(2)exterior hoses bibs Two(2) interior hose bibs Division _ 11--I 'RICAL Feed new building from existing panel Fourteen(14)convenience outlets forty-eight inches(48")AFF Connection for compressor Overhead door operator connections Interior LED strip lighting in each bay Three exterior wall packs Exit signs/lighting ASSUMPTIONS, CLARIFICATIONS AND EXCLUSIONS Assn; °ins A Standard Butler Color will be specified Geotechnical investigation and recommendations shall be provided by the city.We have assumed an allowable soil bearing of 2,000 PSF Davis-Bacon Prevailing Wages Warranty; Includes one(1)Year Materials and Installation Connection to existing utilities,will be within 5 feet of building slab perimeter Utilities have adequate capacity for building needs Progress Payment Invoicing,according to Schedule of Values,submitted with no more than one invoice per month Clad#. _ ns This offer is based on a design/build solution and this ROM supersedes all other plans and specifications related to this project. If there is a discrepancy between plans or specifications provided for this project and this ROMI,the descriptions included in this Scope of Work shall take precedence. If there are any questions regarding clarity of our ROM, please contact us prior to issuance of a Purchase Order. Trovwi of Queensburry Qu�ensdury, NY 21643—'Ct'iratefy Storage Building. �+ 11i13/2020 Sales tax, City shall provide necessary tax-exempt certificate Builders Risk insurance Municipal Agency&Building Permit Application fees Site work other than building-related sitework mentioned above;asphalt paving,parking lot preparation(see alternate), Stormwater systems except as mentioned above,landscaping,etc.(to be determined) Rock excavation if encountered Fire Alarm, Fire Protection systems(to be determined) Special painting or galvanizing of structural steel Interior build-out,finishes,millwork,etc. (to be determined) Tap Fees Building &site signage Furniture, fixtures&equipment Utility consumption charges&service fees for water,gas and electric during construction Material testing services during construction Hazardous material testing and abatement Winter conditions National Grid Fees-confirmation on service size TBD Bollards Company Information for Order Entry Includes BlueScope Construction, Inc. Sourcewell Contract Number:013019-BSC Tax ID Number:43-0949971 LUESC PE CON S TRUCT O _. owo `. ae,-?-?sbw y, NY -;'"i-312020 ATTACHMENT B SCHEDULE OF VALUES Schedule of Values per Division, as defined above: DIVISION • AMOUNT Division 1 General Requirements $101,824 1A Design &Ancillary Services $15,957 113 Payment& Performance Bond $2,668 Division 2 Existing Conditions $72,751 Division 3 Concrete $84,334 Division 7 Thermal and Moisture Protection $6,644 Division 8 Doors and Windows $20,445 Division 13 Special Construction (PEMB Installation) $57,354 13A Special Construction (BBNA Materials) $57,713 Division 22 Plumbing $24,699 Division 23 HVAC $19,896 Division 26 Electrical $34,303 TOTAL = $498,688 The Design, Installation and Site Preparation Services portion of this quote is valid for 30 days at which time a new quote must be obtained. ALTERNATE PRICING Bid Alternate—Exterior Improvements(asphalt paving, parking lot preparation): ADD $36,502 Wif .. '' ALUESCOPE