Loading...
JB201133.0035.Field Density Testing.2020-12-14.Rpt.0035FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0035 12/14/20 12/22/20 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description (pcf)Test Method Min 95.01101.313.2JB201133.0001B Silty sand ASTM D1557 Field Test Data No.Test Location Elev.No. Test Lift /Mat.Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in)(pcf)(pcf)(pcf) Exterior of Structure 1 Location 1 on attached TOF -1.5'1 10 111.5 13.7 14.0 97.8 96.5 2 Location 2 on attached TOF -1.5'1 10 112.5 15.5 16.0 97.0 95.8 3 Location 3 on attached TOF -1.5'1 10 107.4 10.6 10.9 96.8 95.6 4 Location 4 on attached TOF -1.5'1 10 110.3 12.3 12.6 98.0 96.7 5 Location 5 on attached TOF-2.5'1 10 110.3 13.7 14.2 96.6 95.4 6 Location 6 on attached TOW- 2.5'1 10 113.4 14.8 15.0 98.6 97.3 7 Location 7 on attached TOW -1.5'1 10 107.7 11.2 11.6 96.5 95.3 8 Location 8 on attached TOW -1.5'1 10 108.7 12.5 13.0 96.2 95.0 9 Location 9 on attached TOW-1 1 10 106.1 9.5 9.8 96.6 95.4 10 Location 10 on attached TOW-1 1 10 109.7 12.4 12.7 97.3 96.1 11 Location 11 on attached TOF 1 10 109.1 12.6 13.1 96.5 95.3 12 Location 12 on attached TOF+1 1 10 106.4 10.0 10.4 96.4 95.2 13 Location 13 on attached TOF+2 1 10 110.4 13.4 13.8 97.0 95.8 14 Location 14 on attached TOF 1 10 107.9 11.6 12.0 96.3 95.1 15 Location 15 on attached TOF+1 1 10 109.3 12.7 13.1 96.6 95.4 16 Location 16 on attached TOF+2 1 10 107.5 10.5 10.8 97.0 95.8 Interior of Structure 17 Location 17 on attached TOF 1 10 110.2 13.9 14.4 96.3 95.1 18 Location 18 on attached TOF 1 10 110.8 11.1 11.1 99.7 98.4 19 Location 19 on attached TOF+1 1 10 108.8 9.8 9.9 99.0 97.7 20 Location 20 on attached TOF+1 1 10 108.3 11.4 11.8 96.9 95.7 21 Location 21 on attached TOF+2 1 10 111.6 12.9 13.1 98.7 97.4 22 Location 22 on attached TOF+2 1 10 108.8 12.0 12.4 96.8 95.6 23 Location 23 on attached TOF+3 1 10 110.7 10.4 10.4 100.3 99.0 24 Location 24 on attached TOF+3 1 10 115.1 14.0 13.8 101.1 99.8 Comments: Datum:TOF = Top of Footing TOW= Top of Found Wall Std. Cnt. M:Std. Cnt. D:1804661 Test and/or retest results on this report meet project requirements as noted above. Last Cal. Date:Model:Make:S/N:23630 Troxler 3440 01/29/2020 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 2 FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0035 12/14/20 12/22/20 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Services: Reported To: Contractor: Bobby w/ BBL & Galusha Reps Galusha Jared Hall Staff Geologist Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Reviewed By: Dente Group - A Terracon Co. Rep.: Nicholas Cook ASTM D6938Test Methods: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 2 of 2 DRAWING TITLE DWG. NUMBER: 260 JOB NO.: 260-2024NO.DESCRIPTIONREVISIONSS-1 Foundation / First Floor Plan - SouthDATE10/23/2020-302 Washington Ave. Ext.Albany, New York 12203518-452-8200 fax 518-452-2898BBLConstruServicesction3 Story Mixed UseFowler SquareBlind Rock & Bay Road, Queensbury l NYNOTE: IT IS A VIOLATION OF THE NEW YORK STATE EDUCATION DEPARTMENT LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ENGINEER, TO ALTER AN ITEM AS INDICATED ON DRAWINGS, IN ANY WAY. Foundation / First Floor Plan - South Scale: 1/8" = 1'-0"MatchlineKey Plan NIssued For Permit11/10/20201General Revisions11/13/20202Added Shear WallsUnreinforcd 5- #4 bars each way bottom 3'-0" x 3'-0" x 1'-0" thick 4'-6" x 4'-6" x 1'-0" thick Type Footing Schedule Size Reinforcing 4- #5 bars each way bottom5'-0" x 5'-0" x 1'-1" thick 5- #5 bars each way bottom5'-6" x 5'-6" x 1'-2" thick 6- #5 bars each way bottom6'-0" x 6'-0" x 1'-3" thick 7- #5 bars each way bottom6'-6" x 6'-6" x 1'-4" thick 8- #5 bars each way bottom7'-0" x 7'-0" x 1'-5" thick 6- #6 bars each way bottom7'-6" x 7'-6" x 1'-6" thick 7- #6 bars each way bottom8'-0" x 8'-0" x 1'-7" thick 8- #6 bars each way bottom8'-6" x 8'-6" x 1'-9" thick 9- #6 bars each way bottom9'-0" x 9'-0" x 1'-10" thick 10- #6 bars each way bottom9'-6" x 9'-6" x 1'-11" thick 8- #7 bars each way bottom10'-0" x 10'-0" x 2'-0" thick 9- #7 bars each way bottom10'-6" x 10'-6" x 2'-1" thick 10- #7 bars each way bottom11'-0" x 11'-0" x 2'-2" thick 11- #7 bars each way bottom11'-6" x 11'-6" x 2'-3" thick (3,000 PSF Bearing Pressure) F45 F30 F50 F55 F60 F65 F70 F75 F80 F85 F90 F95 F100 F105 F110 F115 72'-4" 8'-0"14'-0"28'-4"14'-0"8'-0" 329'-8" 25'-8"26'-4"25'-8"26'-4"12'-6"16'-0"16'-4"34'-10" 24'-0"13'-10"16'-6"30'-0"25'-8"12'-10"60'-8"12'-10"25'-8"126'-4"3'-0"3'-0"45'-10"25'-8"20'-0"14'-4"10'-6"4'-0"6'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"2'-0" 3'-0" 3'-0" 2'-0" 4'-0" 2'-6" footing 8" wall 11" 2'-6" footing 8" wall 2" shelf 11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"2'-6" footing8" wall2" shelf11"1'-2"2'-0"3'-0"3'-0"13'-3"20'-0"7'-6"13'-3"2'-0"4'-0"5'-2"7'-2"26'-4" 470'-4" 2'-0"7'-0"16'-2"14'-4"10'-6"4'-0"6'-0"3'-0"7'-012"3'-0"3'-0"4'-0"3'-0"3'-0"3'-1"1 2 3 4 5 6 7 8 9 10 11 A B C E F G K R S T 20191817166121314523 H D 15 29'-0"1'-6"29'-0"29'-0"29'-0"17'-1"2'-11"29'-0"29'-0"29'-0"20'-0"16'-3"3'-0"1'-2"10'-6"12'-0"6'-8"11'-6"7'-4"3'-0"1'-0"16'-0"26'-0"17'-0"3'-0"1" expansion jointStair No. 1 Elevator PitFooting Type "F75"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F86"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"T.F.E. -4'-0"Footing Type "F45"T.F.E. -4'-0"Footing Type "F70"T.F.E. -1'-4"Footing Type "F50"T.F.E. -4'-0"Footing Type "F75"T.F.E. -1'-4"Footing Type "F105"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"Footing Type "F95"T.F.E. -1'-4"T.F.E. -1'-4"Footing Type "F90"T.F.E. -2'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footing Type "F80"T.F.E. -4'-0"Footing Type "F90"T.F.E. -1'-4"Footing Type "F90"T.F.E. -1'-4"Footin g T y p e " F 9 0 " T.F.E. - 1' - 4 "Footing Type "F95"T.F.E. -1'-4"Footing Type "F105"T.F.E. -4'-0"Footing Type "F85"T . F . E . - 1 ' - 4 " Footing T y p e " F 6 0 " T.F.E. -4' - 0 "11"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F50"T.F.E. -4'-0"Footing Type "F70"Footing Type "F75"Footing Type "F80"T.F.E. -3'-4"Footing Type "F65"T.F.E. -1'-4"T.F.E. -0'-8"T.F.E. -0'-8"Footing Type "F40"T.F.E. -4'-0"Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 "Footing Type "F40"T . F . E . - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E. - 4 ' - 0 " Footin g T y p e " F 4 0 " T.F.E . - 4' - 0 "Footing Type "F40"T.F.E. -4'-0"F o o t i n g T y p e " F 5 5 "T.F.E. -4'-0"Footing Type "F55"T.F.E. -4'-0"Floor DrainFloor Drain Floor Drain Floor Drain Floor Drain Floor Drain 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" 5" concrete slab with 6x6- W2.9xW2.9 wwf F.F.E. 0'-0" F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 " F o o t i n g T y p e " F 3 0 " T . F . E . - 4 ' - 0 "Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Foot ing Type "F30"T.F .E . -4 '-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"Footing Type "F30"T.F.E. -4'-0"4- #4 bars each way bottom4'-0" x 4'-0" x 1'-0" thickF40 5'-0" B B A A B A A C D E E A A A A Foot ing Type "F50"T.F .E . -4 '-0" E Slab control or construction joist (typical) Column isolation joint (typical) Overpour slab @ entry door (typical) Overpour slab @ garage door Footing Type "F40"T.F.E. -4'-0"F.S.F.S.Footing Type "F90"T.F.E. -4'-0"3'-0" 3'-0" 8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"Footing Type "F95"T.F.E. -4'-0"8 #5 bars long and #5 bars @9"o.c. short in addition to elevator pit reinforcing 3'-0"3'-0"3'-0" Footin g T y p e " F 5 0 " T.F.E. - 4' - 0 " B A A Overpour slab @ entry door (typical) FF F 1 1 1 1 1 1 1 1 BT.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.-0'-8"B T.P.E.- 0 ' - 8 " B T.P . E . -0'- 8 " B T.P.E.- 0 ' - 8 " C T.P.E.2'-0"A T.P.E.2' - 0 " A T.P.E.2'-0"B T.P.E.-1'-4"B T.P.E.- 1 ' - 4 " B T.P.E.- 1 ' - 4 " A T.P.E.2'-0"D T.P . E . 2'-0 " F T.P.E.0'-6"F T.P.E.0' - 6 " F T.P.E.0' - 6 " B T.P.E.- 0 ' - 8 " B T.P.E.-0'-8"FT.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"F T.P.E.0'-6"A T . P . E .2'-0"F T.P.E. 0'-6" FT.P.E.0' - 6 " FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0'-6"FT.P.E.0' - 6 " F T . P . E .0'-6"F T.P.E.0'-6"F T.P.E.0'-6"B T.P . E . -0'- 8 " BT.P.E.-1'-4"AT.P.E.2'-0"A T.P.E.2'-0"A T.P.E . 2'-0" C T.P.E.2'-0"CT.P.E. 2'-0" C T.P.E.2'-0"AT.P .E .2'-0" BT.P.E.-1'-4"B T.P.E . -0'-8" B T.P . E . -1'- 4 " AT.P.E.2'-0"BT.P.E.- 1 ' - 4 " E T.P.E.2'-0"D T.P.E.2'-0"F T.P.E. 0'-6"F T.P . E . 0'-6 " F T.P . E . 0'-6 " F T.P . E . 0'-6 "UpUpUp Up-0.00"-0.00"-0.00" -0.00" -0.00"-0.00" -0.00"-0.00" -0.00" -0.00" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -1.50" -0.75" -1.50" -0.75" -1.50" -0.75"-0.75" -0.00" -0.75" -0.00"-0.00"-0.00" +0.75"+0.75" -0.75" -0.75"-0.75"-0.75" -1.50"-1.50" -1.50"-1.50" -1.50" -1.50" -1.50" -1.50" -0.00" -0.00"-1.50"-1.50"-1.50" -1.50"-1.50" -0.00" -0.00"-0.75" -0.75" -0.00"-0.00" -0.00" -1.50"-1.50" -0.00" -8.50" -8.50" -6.50" -8.50" -8.50" -1.50" Step Wall Step Wall Shear Wall No. 1 Shear wall No. 2 2 2 CL CL 2'-0"10"6"8"1'-2"1'-8" 10"10" 11 2" cover #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing Typical wall reinforcing #4 ties @ 12"o.c.1'-8"10"10"CL #4 stirrups @ 12"o.c. 6- #8 bars vertical - dowel to footing 11 2" cover Pier Details Scale: 3/4" = 1'-0" CL 1'-8" 10"10" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"CL #4 stirrups @ 12"o.c. 8- #8 bars vertical - dowel to footing 11 2" cover CL 2'-0" 1'-0"1'-0" #4 ties @ 12"o.c.2'-0"1'-0"1'-0"S #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 #4 ties @ 12"o.c. 3'-6"2'-4"1'-2"1'-2"CL #4 stirrups @ 12"o.c. 8- #6 bars vertical - dowel to footing 11 2" cover CL 2'-4" 1'-2"1'-2" #4 ties @ 12"o.c.1'-8"10"10"G #4 stirrups @ 12"o.c. 12- #8 bars vertical - dowel to footing 11 2" cover 19 10"10" #4 ties @ 12"o.c. 3'-2" 2020 R Type "A"Type "B"Type "C"Type "F"Type "D"Type "E" 1'-6" 1'-0"1'-0"1'-6" 1