Loading...
JB201133.0041.Reinforcing Steel Observations.2020-12-18.Rpt.0041REINFORCING STEEL OBSERVATIONS REPORT Report Number:JB201133.0041 Service Date:12/18/20 30 Corporate Cir Ste 201 Report Date:12/22/20 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe the placement of reinficing steel and/or embedded elements as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: Christian Makasi Reported To:Bobby w. BBL Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue Reviewed By:____________________________________ (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens Jared Hall (1) Galusha & Sons LLC, James Campagnone Staff Geologist The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 ☐ SPREAD FOUNDATION ☐ GRADE BEAM ☐ FOUNDATION WALL ☐ STRUCTURAL SLAB ☐ CLASSIFICATION ☒ OTHER: Footings REFERENCE DRAWINGS: S-1, S-2, S-3 LOCATION: Building perimeter footings: From mid-point between line 16 & 17 to line 23. (Spread footings around building perimeter included) ☒ PROPER BAR SIZE ☒ PROPER GRADE STEEL ☒ PROPER BAR SPACING ☒ PROPER BAR CLEARANCE ☒ PROPER SPLICES ☒ CONFORMS TO DRAWING ☐ DOES NOT CONFORM ☐ REMARKS: