Signed Inspection Report (Fri Dec 18, 2020 at 302 PM)INSPECTION WORKSHEET (FDTN-007229-2020)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0621-2020 Case Module:Permit
Inspection Date:Fri Dec 18, 2020 Inspection Status:Partial Pass
Inspector:O'Brien, John Inspection Type:Building Foundation
Job Address:Parcel Number:719 BAY RD
Queensbury, NY, 12804
289.19-1-27
Contact Type Company Name Name
Contractor BBL Construction Services
Applicant BBL Construction Services
Granted Permission BBL Construction Services
Primary Owner Rosetti Acquisitions LLC
Architect HCP Architects, LLP
Checklist Item Status
Dec 18, 2020 Page (1)
INSPECTION WORKSHEET (FDTN-007229-2020)
Checklist Item Status
Building Inspector Notes Failed
10/26/20 recieved compaction tests
11/24/20 Footing Partial Approval
T-17 to C-11
12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16.
12/9/20 Foundation Partial Approval
- Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1.
- Footings Partial Approval from T16 to T29
12/11/20 Foundation Partial Approval
- Foundation Insulation installed from H3 to D9
- Backfill Partial Approval from H3 to D9
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
12/16/20 Foundation Partial Approval
- Foundation Insulation D9 - T18
- Backfill D9 - T18
12/18/20 Foundation Partial Approval
- Footings G16 - F24
Footings Passed
11/24/20 Footing Partial Approval
T-17 to C-11
12/2/20 Footings Partial Approval
12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16.
12/9/20 Foundation Partial Approval
- Footings Partial Approval from T16 to T29
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
12/18/20 Foundation Partial Approval
- Footings G16 - F24
Dec 18, 2020 Page (2)
INSPECTION WORKSHEET (FDTN-007229-2020)
Checklist Item Status
Piers Failed
Monolithic Slab Failed
Reinforcement in Place Passed
11/24/20 Footing Partial Approval
T-17 to C-11
12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16.
12/9/20 Foundation Partial Approval
- Footings Partial Approval fromT16 to T29
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
12/18/20 Foundation Partial Approval
- Footings G16 - F24
Foundation / Wallpour Passed
12/9/20 Foundation Partial Approval
- Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1.
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
Reinforcement in Place Passed
12/9/20 Foundation Partial Approval
- Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1.
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
Dec 18, 2020 Page (3)
INSPECTION WORKSHEET (FDTN-007229-2020)
Checklist Item Status
Masonry Wall Failed
Reinforcement in Place Failed
Footing Dowels or Keyway in place Passed
11/24/20 Footing Partial Approval
T-17 to C-11
12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16.
12/9/20 - Footings Partial Approval fromT16 to T29
12/16/20 Foundation Partial Approval
- Foundation Walls T5 - T19
- Footings T25 - B38
12/18/20 Foundation Partial Approval
- Footings G16 - F24
Foundation Dampproofing Failed
Foundation Waterproofing Failed
Footing Drain Daylight or Sump Failed
Footing Drain Stone - 12 inch width Failed
Footing Drain Stone - 6 inches above footing Failed
Footing Drain stone - 6 mil poly Failed
Dec 18, 2020 Page (4)
INSPECTION WORKSHEET (FDTN-007229-2020)
Checklist Item Status
Backfill Approval Passed
12/11/20 Foundation Partial Approval
- Foundation Insulation installed from H3 to D9
- Backfill Partial Approval from H3 to D9
12/16/20 Foundation Partial Approval
- Foundation Insulation D9 - T18
- Backfill D9 - T18
Plumbing Under Slab Failed
PVC / Cast / Copper Failed
Foundation Insulation Interior / Exterior Passed
12/11/20 Foundation Partial Approval
- Foundation Insulation installed from H3 to D9
- Backfill Partial Approval from H3 to D9
12/16/20 Foundation Partial Approval
- Foundation Insulation D9 - T18
- Backfill D9 - T18
Rough Grade 6 inch drop within 10 ft.Failed
Poly Under Slab Failed
Dec 18, 2020 Page (5)
O'Brien, John