Loading...
Signed Inspection Report (12-30-2020) (6).pdfINSPECTION WORKSHEET (SEP-007393-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0255-2020 Case Module:Permit Inspection Date:Wed Dec 30, 2020 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Septic Job Address:Parcel Number:12 HALL RD EXT Queensbury, NY, 12804 289.11-1-17 Contact Type Company Name Name Applicant Leonardo, Adam Primary Owner Leonardo, Rebecca Contractor Rosewood Home Builders Applicant Leonardo, Rebecca Granted Permission Rosewood Home Builders Engineer VanDeLoo, Walter Primary Owner Leonardo, Adam Checklist Item Status Building Inspector Notes Failed 11/2/20 Septic System Partial Approval - Verified sanitary force main has been sleeved with 20' of pipe at location where water line to well will cross force main 5' above. Force main has been installed at approximately 10' below proposed grade. Verified 1 1/2" water line sleeved in SCHD 80 under access road 11/25/20 Soil Type: Sand Passed Type of Water: Municipal / Well Water Failed Well Dec 30, 2020 Page (1) INSPECTION WORKSHEET (SEP-007393-2020) Checklist Item Status Waterline separation distance Failed Well separation distance Passed Well Casing Lengt: 50ft +/-Passed Absorbtion Fields: Total Length Passed 240 ft Septic system field above flood plain Passed Yes Sump pump not connected to septic system Passed No Septic tanks & pump station anchored in flood zone NA Water softener not hooked to septic system NA Length of Each Trench Passed 60 ft Depth of Trenches Passed 12-16 inches System Use Status Failed 11/2/20 Septic System Partial Approval - Verified sanitary force main has been sleeved with 20' of pipe at location where water line to well will cross force main 5' above. Force main has been installed at approximately 10' below proposed grade. Dec 30, 2020 Page (2) INSPECTION WORKSHEET (SEP-007393-2020) Checklist Item Status 12/30/20 field has been verified 4 lines @ 60-2" force main connection to 4" SCHD 40 to D-box, pump/floats alarm to be verified. Size of Stone Passed #2 Size:Failed Stone Size:Failed Building to Tank Failed Tank to Distribution Box Passed 2" force main to D box Distribution box to Field / Pit Passed 4" SDR 26 to sewer and drain perforated Opening Sealed:Passed End Cap Passed InletOutlet Pipes & Baffles Failed Field verification 12/30/20 Manholes 12 or less below grade Failed [Provide extension collar if Yes]Failed Dec 30, 2020 Page (3) INSPECTION WORKSHEET (SEP-007393-2020) Checklist Item Status Locations / Separations Failed See specs Foundation to Tank Failed Foundation to Absorption Failed Conforms as per Plot Plan Failed Engineer Report and As-Built Failed ETU Maintenance Contract provided Failed Location of system on property Failed See specs Dec 30, 2020 Page (4) Dyer, Charles