Loading...
ResCheck , • Generated by REScheck-Web Software Compliance Certificate Project New Residence • Energy Code: 2018 IECC FILE COPY • Locatiorl: Glens Falls, New York Constrdction Type: Single-family Project Type: New Construction Conditioned Floor Area: 2,204 ft2 REVIEWED FOR Glazing Area 11% ENERGY COpE COMPLIANCE Climate Zone: 6 (7635 HDD) • Permit Date: Permit Number: Construction Site: owner/Agent: Designer/Contractor 10 Westberry Way Adam Taylor Jen Lockhart Ethan P.Hall Queensbury; NY 12804 Queensbury, NY 12804 Rucinski Hall ArchitectUre •jenlockhart09@yahoo.com 134 Dix Ave Glens Falls, NY 12801 ephall@nycap.rr.com Compliance: Passes using UA trade-off Compliance: 2:8%Better Than Code Maximum UA: 325 Your UA: 316 ' The%Better or Worse Than Code index reflects how close to compliance the house Is based on code trade-off-rules. It DOES NOT provide an estimate of energy use or cost relative to a Minimum-code home. Envelope:Assemblies Gross Area Cavity Cont. Assembly or U-Factor UA R-Value R-Value Perimeter Ceiling 1: Raised or Energy Truss 2,204 38.0 0.0 0.025 55 Wall 1:Wood Frame, 16"o.c. 2,167 21.0 3.6 0.046 86 Door 1:Solid 38 0.300 11 Door 2:Solid 18 0.300 5 Door 3:Stglid 18 0.300 5 Door 4:Glass 40 0.320 13 Window 1:Wood Frame:Double Pane with Low-E 189 0.290 55 Floor 1:All-Wood JoistfTruss:Over Unconditioned Space 20 30.0 0.0 0.033 1 Basement Wall 1: Solid Concrete or Masonry 1,853 19:0 0.0 0.046 85 Wall height:8.9' Depth below grade: 7.5' ...„ ......_..._....._. _ . —___. Insulation depth:8.5' :.,:i. (-17' 'k=,;; il %All ' - ' '4 rA) 1::: ‘.....i I::: 0 n:\ 1.) - • ..i. 1 1 I ,v,,,, 1 L ii I j j L 0 1 LiS23 ] j TOWN 0 F Q U E E N S F:.!LY BUILDING &COF.; 'S --- Project Title: New Residence Report date: 07/06/20 Data filename: Page 1 of10 Compliance Statement The proposed building design described here is consistegwith the building plans,specifications,and other calculations submitted with the permit application.The proposed building hasbeen;desgned to meet the 2018 IECC requirements in REScheck Version :'REScheck-Web and to comply with the mandatory"r i ement te. - e-REScheck Inspection Checklist. `` 'I N11. . Nr— l`�'�7s r 1 rg ate ��PIU"Idea, Name-Title Sigpat• ei_ i;C,' �� at e y els Project Title: New Residence Report date: 07/06/20 Data filename: Page 2 of10 gREScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements 0.0% were addressed directly in the REScheck software Text in the "Comments/AssUmptions" column is provided by the user in the REScheck Requirements screen. For each requirement the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Complies? Comments/Assumptions Value : Value & Recj.ID 103.1, ;ConstrUction drawings and ; Complies , 1n2 documentation demonstrate i Does Not [PR1]1 ;energy code compliance for the - , • • ' building envelope,Thermal 1ONot Observable ...., , i envelope represented on : l:INot Applicable construction documents. 103.1, ;Construction drawings arid Momplies 103.2, idocumentation demonstrate ,1=1Does Not 403.7 ;energy code compliance for t Obbl [PR3]1 :lighting and mechanical systems. IONo serva e Systems serving Multiple • IONot Applicable ;dwelling units must demonstrate. 1 1 compliance with the IECC , i commercial Provisions. 302.1, IHeating and cooling equipment is Heating: Heating Eompiies 1 403.7 I sized per ACCA Manual S based 'Biii/hr Btu/hr EIDOes Not [PR2]2 On loads calculated per ACCA cooling: Cooling: alot Observable 0 I Manual J or other rnethods i !approved by the code official. Btu/hr Btu/hr- ONot Applicable Additional Comments/Assumptionsi 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 3 Of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies?- Comments/Assumptions & Req.ID 402.1.1 ,Conditioned basement wall : R R- ❑Complies See the Envelope Assemblies [F04]1 iinsulation R-value:Where interior R. R- ❑Does Not table for values. ' :insulation is used;verification may need to occur during ['Not Observable Insulation Inspection: Not ❑Not Applicable :required in warm-humid locations i in Climate Zone 3. 303.2 ;Conditioned basement wall ❑Complies. [F05]1 iinsulation installed per : 1 }❑Does Not 44, . :manufacturer's:instructions. 10Not.Observable I❑Not Applicable:. 402.2.9 . :Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [F06]1 iinsulation depth of burial or DDoes Not table for values. U distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 1A protective covering is installed 1❑Complies [F011]2 ito protect exposed exterior I❑Does Not ,J insulation and extends a. DNot Observable minimum of 6 in. below grade. ❑Not Applicable. 403.9 'Snow-'and ice-melting system. 1❑Complies [F012]2 controls installed. i❑Does Not J I I❑Not Observable • I❑Not Applicable . . Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) . 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, 1 Door U-factor. U U ❑Complies See the Envelope:Assemblies 402.3.4 ❑Does Not table for values. [FRl]1 �� ❑Not Observable ❑Not Applicable 402.1.1; ;Glazing U-factor(area-weighted U- U- ;❑Complies See the Envelope Assemblies 402.3.1, ;average). ;❑ge) Does Not table for values. . N 402.3.3, 402.5 ;❑Not Observable [FR2]1 I ;❑Not Applicable 303.1.3 ;U-factors of fenestration products IDComplies. . [FR4]1 fare determined in accordance 10Does Not . ;with the NFRC test procedure or 4 :taken from the default table. !❑Not Observable i 1❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier IEIComplies [FR23]1 installed per manufacturers I i❑Does Not ;A instructions.. ; ;DNot Observable ffi ;❑Not Applicable 402.4.3 Fenestration that is not site built I❑Complies [FR20]1 i is listed.and labeled as meeting. ( ❑Does Not IAAMA/WDMA/CSA 101/I.5.2/A440 4for has infiltration rates per NFRC I Not Observable 400 that do not exceed code i ONot Applicable limits. 402.4.5 I IC-rated recessed lighting fixtures ❑Complies [FR16]2 Isealed at housing/interior finish Oboes Not land labeled to indicate 5_2.0 cfm ;leakage.at 75 Pa. ❑Not Observable :Dot Applicable 403.3.1 :Supply and return ducts in attics { j❑Complies [FR12]1 'insulated >= Ft-8 where duct is i 10Does Not ;>=3 inches in diameter and > - - R-6 where< 3 inches.Supply and i 1❑Not Observable ;return ducts in other portions of 11=INot Applicable ;the building insulated >= R-6 for ; } ;diameter>= 3 inches and R4.2 , for'<3 inches in diameter. 403.3.2 Ducts,air handlers and filter - ❑Complies [FR13]i ;boxes are sealed with ; ❑Does Not ;®J ' :joints/seams compliant with International Mechanical Code or 10Not.Observable International Residential Code,as{ IDNot Applicable ;applicable. i 1 . 403.3.5 I Building cavities are not used as lEIComplies [FR15]3 ;ducts or plenums. IODoes Not 8' 1 ❑Not Observable 1 ;❑Not Applicable I 1 1 High Impact(Tier 1) Medium Impact(Tier.2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 5 of10 Section. Plans Verified Field Verified . # Framing/Rough-In Inspection Complies? Comments/Assumptions &Req.ID Value Value 403.3.7 Ducts declared to be within the (❑Complies [FR28]3 conditioned space are either 1) ! 1❑Does Not „9, Icompletely within the continuous air barrier and within the building i !❑Not Observable thermal envelope, 2)buried i❑Not Applicable within ceiling insulation in iaccordance with Section i !R403.3.6 and the air handler is I ! I located completely within the Icontinuous air barrier and within € _ ;the building thermal envelope land the duct leakage is<_ 1.5 cfm:/100 square feet of conditioned floor area served by !the duct system,or 3)the ceiling insulation R-value installed against and.àbove the insulated `duct>=to the proposed ceiling Iinsulation.R-value, less.the R- value of the insulation on the 403.4 HVAC piping conveying fluids R- R- ;❑Complies [FR17]2 o;above 105-F or chilled fluids I❑Does Not J ;below 55 4F are insulated to>R- I_ 3 ;❑Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC ; ❑Complies [FR24]1 ;piping. i ❑Does Not e, I I ❑Not Observable I., ❑Not Applicable 403.5.3 j Hot water pipes are insulated to R- R- ❑Complies [FR18]2 ;>_R-3. ❑Does Not U i ❑Not Observable i ONot Applicable 403.6 ;Automaticor gravity dampers are - ;❑Complies [FR19]2 'installed on all outdoor air ❑Does Not ;intakes and exhausts. 11:1Not Observable i S j❑Not Applicable Additional Comments/Assumptions: � Impact(Tier 3) l 1 1 High Impact(Tier 1) 1 2 Mediumimpact(Tier 2) 3 Low Project Title: New Residence Report date: 07/06/20 Data filename: Page 6 of10 Section. Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled l❑Complies [IN13]z or the installed R-values 1❑Does Not ;provided. I❑Not Observable ❑Not Applicable 402.1.1, ;Floor insulation R-value: R- R: ❑Complies See the Envelope Assemblies 402.2.6 table for values. [imp ❑ Wood � Wood Oboes Not ❑ Steel ❑ Steel ;]Not Observable ❑Not Applicable 303.2, Floor insulation installed per 1 ❑Complies 402.2.7 manufacturer's instructions and ❑Does Not. . [IN2]1 in substantial contact with the gip' . ;underside pf the subfloor,or floor; ;❑Not.Observable framing cavity insulation is in IONot Applicable contact with the top side of ;sheathing,or continuous 'insulation is installed on the underside of floor framing and extends.from the bottom to the ;top of all perimeter floor framing members: ; 402.1.1, ;Wall insulation R-value. If this is a R- R .. ❑Complies See the Envelope Assemblies 402.2.5, ;mass wall with at least V2 of the ❑ Wood ❑ Wood Oboes Not table for values. 402.2.6 ;wall insulation on the wall ❑ Mass ❑ Mass [IN3j1 ;exterior,the exterior insulation ❑Not Observable Steel requirement applies(FR10). ❑ El Steel ONot Applicable 303.2 'Wall insulation is installed per ;❑Complies [IN4]1 !manufacturer's instructions. ;ODoes Not IQNot Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R-value. R- R- DComplies See the Envelope Assemblies 402.2.1, ❑ Wood 0 Wood DDoes Not table for values. 402.2.2, ❑ Steel 0 Steel ONot Observable 402.2.6 [FI1]1 ❑Not Applicable 303.1.1.1,;Ceiling insulation installed per ;DComplies 303.2 :manufacturer's instructions. 1❑Does Not [FI2ji ;Blown insulation marked every i 300 ft2. lENot Observable ;❑Not Applicable 402.2.3 ;Vented attics with air permeable i .. ;❑Complies (FI22)2 !insulation include baffle adjacent ;❑Does Not ;to soffit and eave vents that ,extends over insulation. ❑Not Observable i ! ;❑Not Applicable 402.2.4 ;Attic access hatch and door R- R- DComplies [F13]1 insulation >_R=value of the Oboes Not ;adjacent assembly. [Mot Observable . ONot Applicable 402.4.1.2 ;Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50=. DComplies [F117]1 ;achin Climate Zones 1-2,and ❑Does Not <=3 ach in Climate Zones 3-8. ONot Observable ❑Not Applicable 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]l. determine air leakage with ft2 ft2 Oboes Not ;either: Rough-in test:Total ;leakage measured with a ONot Observable pressure differential of 0:1 inch ONot Applicable ;w,g.across the system including :the manufacturer's air handler !enclosure if installed at time of ;test. Postconstruction test:Total leakage measured with a j pressure differential of 0.1 inch w.g.across the entire system :including the manufacturer's air handler enclosure. 403.3.4 DUct tightness test result of<=4 cfm7100 cfm/100 DComplies [FI4]1 i cfm/100 ft2 across the system or ft2 ft2 ❑Does Not ;<=3 cfm/100 ft2 without air ONot Observable :handler @ 25 Pa. For rough-in tests,verification may need to DNot Applicable occur during Framing Inspection. 403.3.2.1 ;Air handler leakage designated 'DComplies [FI24]1 :by manufacturer at<=2%of Oboes Not ;design airflow. + :. ❑Not Observable ❑Not Applicable 403.1.1 ;Programmable thermostats !DComplies [Fl9]2 :installed for control of primary i0Does Not heating and cooling systems and initially set by manufacturer to ONot Observable i code specifications. . i ONot Applicable 403.1.2 !Heat pump thermostat installed ;DComplies [FI10]2 on heat pumps. i !❑Does Not , ,ONot Observable ❑Not Applicable 403.5.1 ;Circulating service hot water ; ❑Complies [FI11]2 :systems have automatic or i ;❑Does Not accessible manual controls. l , 1❑Not Observable ONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID . 403.6.1 :All mechanical ventilation system ;❑Complies [F125]2 fans not part of tested and listed ; i❑Does Not HVAC equipment meet efficacy and air flow limits per Table ❑Not Observable R403.6.1. ;❑Not Applicable 403.2 ;Hot water boilers supplying heat ❑Complies [F126]2 ;through one-or two-pipe heating ❑Does Not systems have outdoor setback i control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable ;temperature. 403.5.1.1 ;Heated water circulation systems ; ;❑Complies [F128]2 !have a circulation pump.The !DDoes Not ;system return pipe is a dedicated return pipe or a cold water supply l ❑Not Observable !pipe.Gravity and thermos- :❑Not Applicable ;syphon circulation systems are not present. Controls for i circulating hot water system ' pumps start the pump with signal for hot water demand within the ;occupancy.Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and ; • no demand for hot water exists. 1 403.5.1.2 ;Electric heat trace systems ; ',❑Complies [F129]2 comply with IEEE 515.1 or UL iODoes Not 515.Controls automatically i adjust the energy input to the ,❑Not Observable heat tracing to maintain the `DNot Applicable • desired water temperature in the piping. 403.5.2 i Demand recirculation water ; ;❑Complies [F130]2 !systems have controls that 10Does Not ;manage operation of the pump :and limit the temperature of the ❑Not Observable ;water entering the cold water !❑Not Applicable ;piping to <= 104°F. 403.5.4 :Drain water heat recovery units {❑Complies [FI31]2 ;tested in accordance with CSA iODoes Not B55.1. Potable water-side pressure loss of drain water heat ❑Not Observable 'recovery units < 3 psi for 11=INot Applicable individual units connected to one ; ;or two showers. Potable Water- ;side pressure loss of drain water ;heat recovery units< 2 psi for individual units connected to ;three or more showers. . 404.1 90%or more of permanent '❑Complies [Fl6]1 ;fixtures have high efficacy lamps. ;❑Does Not ❑Not Observable ❑Not Applicable 404.1.1 I Fuel gas lighting systems have i❑Complies [FI23]3 ;no continuous pilot light. i0Does Not V' ! ;❑Not Observable i ❑Not Applicable 401.3 :Compliance certificate posted. ❑Complies [FI7]2 ; i❑Does Not ❑Not Observable ;❑Not Applicable ; ET. High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 0.7/06/20 Data filename: Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 303.3 i Manufacturer manuals for ;❑Complies [FI18]3 I mechanical and water heating i❑Does Not systems have been provided. ❑Not Observable ;❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Residence Report date: 07/06/20 Data filename: Page 10 of10 CI2018 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 24.60 Below-Grade Wall 19.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass& Door Rating U-Factor SHGC Window 0.29 Door 0.32 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments