JB201133.0062.Reinforcing Steel Observations.2021-01-05.Rpt.0062REINFORCING STEEL OBSERVATIONS REPORT Report Number:JB201133.0062 Service Date:01/05/21 30 Corporate Cir Ste 201 Report Date:01/07/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe the placement of reinficing steel and/or embedded elements as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: Bryan Smith Reported To:Bobby w/ BBL & Galusha Reps Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue Reviewed By:____________________________________ (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens M. McHenry (1) Galusha & Sons LLC, James Campagnone Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 ☐ SPREAD FOUNDATION ☐ GRADE BEAM ☐ FOUNDATION WALL ☐ STRUCTURAL SLAB ☐ CLASSIFICATION ☒ OTHER Exterior Piers REFERENCE DRAWINGS S-1 LOCATION Piers at points (15.5,T.5), (16.2,T.5), (16.66,T.5), (17.66,T.2), (18.1,T.2), (18.5,T.2), (16.75,E), (17.2,E), (17.5,E), (18.5,E), and (19,E) ☒ REQUIRED BAR SIZE ☒ REQUIRED GRADE STEEL ☒ REQUIRED BAR SPACING ☒ REQUIRED BAR CLEARANCE ☒ REQUIRED SPLICES ☒ CONFORMS TO DRAWING ☐ DOES NOT CONFORM ☐ REMARKS Photo No. 1 Pier located on the east side of the structure, that was poured on this date.Photo No. 2 One of the exterior piers located on the west side of the structure, that was poured on this date. Photo No. 3 The detail for “Type F” Piers, which encompasses all the piers poured on this date. Rosetti Acquisitions LLC Project Number:JB201133 Attn: Christopher Falvey Report Number: JB201133.0062 427 New Karner Rd Technician: Bryan Smith 30 Corporate Cir Ste 201 Albany, NY 12205 Date: 01/05/21 Albany, NY 12203-5169 Scale: Not to Scale 518-266-0310