Loading...
JB201133.0067.Field Density Testing.2021-01-11.Rpt.0067FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0067 01/11/21 01/12/21 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description (pcf)Test Method Min 95.01101.313.2JB201133.0001B Silty sand ASTM D1557 2 110.014.4JB201133.0002B Poorly-graded sand with silt and gravel ASTM D1557 Field Test Data No.Test Location Elev.No. Test Lift /Mat.Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in)(pcf)(pcf)(pcf) Exterior of building 2 1 18 on line T TOF 2 8 114.6 9.9 9.5 104.7 95.2 2 19 on line T TOF 1 8 114.7 13.8 13.7 100.9 99.6 3 21 on line T TOF 2 8 113.4 8.7 8.3 104.7 95.2 4 22 on line T TOF 1 8 113.9 15.6 15.9 98.3 97.0 5 19 on line T TOF+1 1 8 111.9 13.7 14.0 98.2 96.9 6 21 on line T TOF+1 1 8 107.7 9.7 9.9 98.0 96.7 7 21 on line T TOF+1 1 8 110.3 10.0 10.0 100.3 99.0 8 19 on line T TOF+2 1 8 109.8 10.3 10.4 99.5 98.2 9 21 on line T TOF+2 1 8 112.2 11.9 11.9 100.3 99.0 10 22 on line T TOF+2 1 8 112.0 9.8 9.6 102.2 100+ 11 19 on line T TOF+3 1 8 111.7 8.8 8.6 102.9 100+ 12 21 on line T TOF+3 1 8 112.1 10.9 10.8 101.2 99.9 13 22 on line T TOF+3 1 8 109.9 8.6 8.5 101.3 100.0 Interior of building 2 14 Pier at 19/20 on line R TOF+2 1 8 108.4 7.2 7.1 101.2 99.9 Comments: Datum:TOF = Top of Footing +Feet Std. Cnt. M:Std. Cnt. D:1892658 Test and/or retest results on this report meet project requirements as noted above. Last Cal. Date:Model:Make:S/N:21608 Troxler 3430 01/29/2020 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 2 FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0067 01/11/21 01/12/21 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Services: Reported To: Contractor: Bobby w/ BBL & Galusha Reps Galusha M. McHenry Materials Department Manager Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Reviewed By: Dente Group - A Terracon Co. Rep.: Nicholas Cook ASTM D6938Test Methods: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 2 of 2