REDFINAL-006305-2020 11132020INSPECTION WORKSHEET (RESFINAL-006305-2020)
RC-0250-2020Permit Management
Case Number:Case Module:
11/13/2020Partial Pass
Inspection Date:Inspection Status:
Mark SmithResidential Final Inspection
Inspector:Inspection Type:
296.5-1-9
Job Address:Parcel Number:
77 Round Pond Rd
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantFOOTHILLS BUILDERS, LLC
ContractorFOOTHILLS BUILDERS, LLC
EngineerVision Engineering
Granted PermissionFOOTHILLS BUILDERS, LLC
Primary OwnerTerre Majestic Holdings, LLC
Checklist ItemPassedComments
Low flow toilet 1.3 gal/flushing cycleTrue
Bathroom Fans, if no windowTrue
3" Plumbing Vent through roof minimum 18 inchTrue
Grade away from foundation: 6" down, 10' outFalseCorrect grade at north east corner at back of house
Final Survey Plot PlanTrue
Window guards req:<2' above floor/6' above gradeTrue
Interior privacy/trim/doors/main entrance 36True
Emergency egress below gradeTrue
Intake OpeningsTrue
Safety glazing: w/in 5' of tub/showerTrue
Seals on Garage Doors, esp. WoodTrue
Attic Access Insulation = Attic R- ValueTrue
Gas Shut-off Exposed & Regulator (18) Above GradeTrue
Platform at all exterior doorsTrue
Garage Floor PitchedTrue
Wood deck: 2'+ from grade dia bracing requiredFalseProvide bracing at back deck
Inter ConnectedTrue
Arc Fault Breaker Habitable SpacesTrue
Dryer Duct Max Length 35', Labeled Over 35'True
Energy Sticker on Elec. Panel:R-Val. & Heating SysTrue
Furnace/Hot Water Heater operatingTrue
Fresh Air IntakeTrue
Basement stairs closed rise greater than 4 inchesTrue
Foam in basement/attics covered w/thermal barrierFalseSheetrock in basement need to be properly fastened
Outside every bedroom areaTrue
Blower Door Test CertificationTrue
Fin ElectEnergy Saving Light Bulbs 50 PercentTrue
OK to Issue C/OFalse
Truss ID Signage Installed at Electrical MeterTrue
January 13, 2021Page 1 of 3
INSPECTION WORKSHEET (RESFINAL-006305-2020)
Checklist ItemPassedComments
4 inch Building Number Address visible from roadTrue
CO in Bedrooms w/GasFalse
HVAC Vent Terminal 10' from Lot Line & OpeningsTrue
Attic Access GasketedTrue
Jack posts in basement lagged at top and bottomTrue
Guard at deck, porches 36" or moreTrue
6" clearance to sill plateTrue
5/8" Type X with Living Space AboveTrue
Propane Tank: Proper Setback from Prop Line/StructTrueMunicipal gas
4+ Deck Joist Ledger Connections-24" From EndsTrue
20 Minute Fire Door/Self-Closing HardwareTrue
Every level, Every bedroomTrue
Furnace shut-off w/in 30 ft. or w/in line of siteTrue
CO Detectors within 10' of all sleeping areasTrue
Relief Valve ,Heat Trap/Water Temp 110 deg or lessTrue
1/2" Gypsum or House Wall and GableTrue
Basement Egress: 5s.f. window w/sill or Bilco doorTrue
Bathroom / Kitchen WatertightTrue
HRV or ERV Installed per Bedroom RequirementsTrue
Duct work sealed properlyTrue
Foundation insulation to floorTrue
As Built Septic SystemTrue
Outside Spigots have Air GapTrue
OK to Issue Temporary C/OTrue
Plumbing fixturesTrue
Handrail 4 or more risersTrue
General CommentsFalse
11/13/20 final inspection for temporary C.O. Approved, the final
C.O. Can not be issued until the follow items are completed.
The sheet rock covering the ridged insulation in the basement
needs to be properly fastened. It appears to be installed in a
shoddy manner
Diagonal bracing is required at the back deck.
A 6" drop in 10' is required for the grade around the house, the
north east corner at the back of the house needs to be corrected.
Guards at stairs,decks,patios 30" + above gradeTrue
Smoke Detectors:True
Smoke Detectors 3' from Kitchens & Baths R314True
Guard at stairwell at 34" or moreTrue
Roof Complete / Exterior Finish CompleteTrue
Handrail Termination at Newell Post or WallTrue
Battery backup: _____True
All Hot Water Systems: 3/4" or larger piping R-3True
Fresh air supply 3' from gradeTrue
Attic Access 22 x 30 minimumTrue
Flex Gas Pipe BondingTrue
January 13, 2021Page 2 of 3
INSPECTION WORKSHEET (RESFINAL-006305-2020)
Checklist ItemPassedComments
Interior/Exterior Railings 34 to 38True
Deck Ledger-Bolted per CodeTrue
Carbon Monoxide Detectors:True
January 13, 2021Page 3 of 3