SEP-002850-2020 06152020INSPECTION WORKSHEET (SEP-002850-2020)
SEP-0258-2020Permit Management
Case Number:Case Module:
06/15/2020Passed
Inspection Date:Inspection Status:
Dave HatinSeptic
Inspector:Inspection Type:
301.7-2-35
Job Address:Parcel Number:
8 Sylvan Ave
Queensbury, NY 12804
Contact TypeCompany NameName
ApplicantScott Rowland
ContractorScott Rowland
Granted PermissionGloria Favreau
Primary OwnerGloria Favreau
Checklist ItemPassedComments
Building Inspector NotesFalse
Soil Type: SandTrue
Waterline separation distanceTruefront yard
Tank to Distribution BoxTrue2'
Opening Sealed:True
End CapTrue
Absorbtion Fields: Total LengthTrue150
Foundation to TankTrueexisting
Location of system on propertyTruerear yard
Type of Water: Municipal / Well WaterTrue
Depth of TrenchesTrue30"
Length of Each TrenchTrue50
Conforms as per Plot PlanTruesubmit as built 6/15/20 recieved
Foundation to AbsorptionTrue20
InletOutlet Pipes & BafflesTruenew outlet baffle installed
January 14, 2021Page 1 of 1