Loading...
364.2020 Change Order 02 to Contract 01 Highway Garage (2) RESOLUTION AUTHORIZING CHANGE ORDER NUMBER: 02 TO CONTRACT 01 FOR GENERAL CONSTRUCTION WITH MLB CONSTRUCTION SERVICES, LLC IN CONNECTION WITH HIGHWAY GARAGE CAPITAL PROJECT RESOLUTION NO.: 364, 2020 INTRODUCED BY: Mr. George Ferone WHO MOVED ITS ADOPTION SECONDED BY: Mrs. Amanda Magee WHEREAS, by Resolution No.: 82,2016, the Queensbury Town Board authorized establishment of the Highway Garage Capital Project (Project) and Highway Garage Capital Project Fund #208 and engagement of C.T. Male Associates (C.T. Male) for engineering services related to the Project, and WHEREAS, by Resolution No.: 414,2019, the Town Board accepted and awarded the bids for the Project including for Contract O1 for General Construction to MLB Construction Services, LLC (MLB) for an amount not to exceed $2,496,900, and WHEREAS, C.T. Male has advised that after reaching a level of completion on MLB’s work and discussion with the Town Highway Superintendent, it was determined that adding in additional pavement costs to replace the balance of pavement in the back of the building (out-of- scope work) would be appropriate and not involve a significant additional cost to the Town, and WHEREAS, after negotiations with MLB, the cost for such additional pavement has been reduced to $67,303, which cost will be covered under the current Contract through use of the remaining allowance funds, leaving the sum of $12,565.89 which needs to be authorized through a Change Order as set forth in MLB’s proposed Change Order Number: 02 dated 10/30/2020 presented at this meeting, and WHEREAS, upon review, C.T. Male has recommended that the Town Board authorize Change Order Number: 02 in the amount of $12,565.89 for a new total Contract 01 sum including such Change Order to be $2,509,465.89, NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes and approves MLB Construction Services, LLC’s Change Order Number 002 dated 10/30/2020 pertaining to Highway Garage Project Contract O1 for General Construction as described in the preambles of this Resolution in the amount of $12,565.89 for a new total Contract 01 sum including such Change Order Number: 02 to be $2,509,465.89, to be paid for from Highway Garage Capital Project Fund #208, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to execute Change Order Number: 02 substantially in the form presented at this meeting and/or any other needed documentation, and BE IT FURTHER, RESOLVED, that the Town Board authorizes and directs the Town Budget Officer to adjust the Project’s appropriations and/or take any other needed actions as necessary, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor, Town Highway Superintendent and/or Town Budget Officer to take all other actions necessary to effectuate the terms of this Resolution. nd Duly adopted this 2 day of November, 2020, by the following vote: AYES : Mr. Metivier, Mr. Freer, Mr. Ferone, Mrs. Magee, Mr. Strough NOES : None ABSENT: None