JB201133.0049.Masonry Observations.2020-12-29.Rpt.0049MASONRY OBSERVATIONS REPORT Report Number:JB201133.0049 Service Date:12/29/20 30 Corporate Cir Ste 201 Report Date:01/04/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 6-30-11, Rev.9 Page 1 of 3 DOCUMENTS USED FOR INSPECTION: Structural drawings LOCATION OF THE WORK PERFORMED: Stairway No.1. 10” CMU Wall, grouting of 5 courses, top of lift at bond beam course just below the 2nd floor level. REMARKS: Contractor placed #4 dowels every 16” O.C. at bond beam for slab on deck for second floor slab connection at shear wall. Contractor grouted perimeter walls solid. The vertical reinforcing was continued through the wall at 16” oc with the proper splice lap. ☒ CONFORMANCE STATEMENT: Based on our observations, masonry construction activities at the above referenced locations appeared to be in general conformance with the project plans and specifications. ☐ WITH THE FOLLOWING EXCEPTIONS: A. MATERIAL VERIFICATION General Conformance Non- Conformance N/A 1. Verify the use of approved CMU Block: Type, Size ☒☐☐ 2. Verify the mortar type and strength ☒☐☐ 3. Verify the reinforcing steel size and grade ☒☐☐ 4. Verify the type and gauge of horizontal joint reinforcement ☒☐☐ REMARKS: Where observed B. WORKMANSHIP General Conformance Non- Conformance N/A 1. Verify the webs containing grout are confined by mortar ☒☐☐ 2. Verify the horizontal and vertical joint thickness conforms to 3/8” ± 1/8”☒☐☐ 3. Verify the mortar consistency, mixing, and working time ☒☐☐ 4. Verify the cover for horizontal joint reinforcement in the mortar bed ☒☐☐ REMARKS: Where observed MASONRY OBSERVATIONS REPORT Report Number:JB201133.0049 Service Date:12/29/20 30 Corporate Cir Ste 201 Report Date:01/04/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 6-30-11, Rev.9 Page 2 of 3 C. GROUTING General Conformance Non- Conformance N/A 1. Verify that cores containing reinforcement are clean and free from debris ☒☐☐ 2. Verify the spacing of vertical reinforcement and location in the cell ☒☐☐ 3. Verify low lift grouting height ☒☐☐ 4. Check for the presence of clean out if high lift grouting is being used ☒☐☐ 5. Grout consolidated using vibratory methods ☒☐☐ 6. Verify the slump of grout is between 8 and 11 inches ☒☐☐ REMARKS: Where observed, slump was a 9. D. COLD WEATHER REQUIREMENTS General Conformance Non- Conformance N/A 1.Verify /measure the CMU's temperature and condition ☒☐☐ 2.Verify that the mortar temperature is between 40 F and 120 F ☐☐☒ 3. Verify that the grout temperature is minimum of 70F at the time of placement if the ambient temperature in enclosure is below 32F ☒☐☐ 4.Check protection arrangements for installed masonry and grout ☒☐☐ REMARKS: Work area enclosed and heated to above 40 degrees contractor reported heat would remain on overnight. Mix water was being heated during the time of inspection. MASONRY OBSERVATIONS REPORT Report Number:JB201133.0049 Service Date:12/29/20 30 Corporate Cir Ste 201 Report Date:01/04/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe masonry construction activities as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: Abdulaziz Abdalla Reported To:Bobby w. BBL Contractor:BBL Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue Reviewed By:____________________________________ (1) BBL Construction Services, Scott Lounsbury (1) Galusha & Sons LLC, Drew Stevens M. McHenry (1) Galusha & Sons LLC, James Campagnone Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 6-30-11, Rev.9 Page 3 of 3 E. MORTAR/GROUT TESTING General Conformance Non- Conformance N/A 1. Was mortar testing performed? (YES/NO): No Select Y/N.☐☐☒ 2. Indicate number of sample cubes and temperature at point of placement: Number = Temperature= ☐☐☒ 3. Was grout testing performed? (YES/NO): Yes Select Y/N.☒☐☐ 4. Indicate number of grout prisms and temperature at point of placement: Number= 4 Temperature= 60 ☒☐☐ 5. Slump of grout at point of placement in inches: 9 ☒☐☐ 6. Forecasted mean temperature for 24 hours (F): 29 ☒☐☐ 7. Ambient air temperature (F): 30 ☒☐☐ REMARKS: Where observed