Signed Inspection Report (Thu Dec 31, 2020 at 1243 PM)INSPECTION WORKSHEET (FDTN-007397-2020) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0621-2020 Case Module:Permit Inspection Date:Thu Dec 31, 2020 Inspection Status:Partial Pass Inspector:O'Brien, John Inspection Type:Building Foundation Job Address:Parcel Number:719 BAY RD Queensbury, NY, 12804 289.19-1-27 Contact Type Company Name Name Applicant BBL Construction Services Primary Owner Rosetti Acquisitions LLC Architect HCP Architects, LLP Granted Permission BBL Construction Services Contractor BBL Construction Services Checklist Item Status Dec 31, 2020 Page (1) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Building Inspector Notes Failed 10/26/20 recieved compaction tests 11/24/20 Footing Partial Approval T-17 to C-11 12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16. 12/9/20 Foundation Partial Approval - Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1. - Footings Partial Approval from T16 to T29 12/11/20 Foundation Partial Approval - Foundation Insulation installed from H3 to D9 - Backfill Partial Approval from H3 to D9 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/16/20 Foundation Partial Approval - Foundation Insulation D9 - T18 - Backfill D9 - T18 12/18/20 Foundation Partial Approval - Footings G16 - F24 12/23/20 Foundation Partial Approval - 8 interior footings at south end of building approved - First Floor Stair #1 masonry block partial approval( Vertical bars 4-#7s in corners, vertical #4s at 48" oc and #4s @ 16" oc at shear wall 12/29/20 Foundation Partial Approval - East Foundation Wall - West Foundation Wall - Masonry Wall Bond Beam and Vertical Bar. Verticals reinforcing in place bond beam reinforcing not in place Terracon on site to witness placement and concrete grout testing. 12/30/20 Foundation Partial Approval - West Foundation Wall F12.5 to F21 Foundation Insulation. Ok to backfill! Dec 31, 2020 Page (2) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Footings Passed 11/24/20 Footing Partial Approval T-17 to C-11 12/2/20 Footings Partial Approval 12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16. 12/9/20 Foundation Partial Approval - Footings Partial Approval from T16 to T29 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/18/20 Foundation Partial Approval - Footings G16 - F24 12/23/20 Foundation Partial Approval - 8 interior footings at south end of building approved - First Floor Stair #1 masonry block partial approval( Vertical bars 4-#7s in corners, vertical #4s at 16" oc and #4s @ 48" oc at shear wall 12/31/20 Foundation Partial Approval - Interior Column and Pier Footings at lines R and K 12-20. Piers Failed Monolithic Slab Failed Dec 31, 2020 Page (3) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Reinforcement in Place Passed 11/24/20 Footing Partial Approval T-17 to C-11 12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16. 12/9/20 Foundation Partial Approval - Footings Partial Approval fromT16 to T29 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/18/20 Foundation Partial Approval - Footings G16 - F24 12/23/20 Foundation Partial Approval - 8 interior footings at south end of building approved - First Floor Stair #1 masonry block partial approval( Vertical bars 4-#7s in corners, vertical #4s at 16" oc and #4s @ 48" oc at shear wall 12/31/20 Foundation Partial Approval - Interior Column and Pier Footings at lines R and K 12-20. Foundation / Wallpour Passed 12/9/20 Foundation Partial Approval - Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1. 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/29/20 Foundation Partial Approval - East Foundation Wall T19 to T22 - West Foundation Wall F12.5 to F21 - Masonry Wall Bond Beam and Vertical Bar. Verticals reinforcing in place bond beam reinforcing not in place Terracon on site to witness placement and concrete grout testing. Dec 31, 2020 Page (4) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Reinforcement in Place Passed 12/9/20 Foundation Partial Approval - Foundation Walls partial approval from F12.5 to T4.5, Elevator #1 and Stair #1. 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/29/20 Foundation Partial Approval - East Foundation Wall T19 to T22 - West Foundation Wall F12.5 to F21 - Masonry Wall Bond Beam and Vertical Bar. Verticals reinforcing in place bond beam reinforcing not in place Terracon on site to witness placement and concrete grout testing. Masonry Wall Passed 12/23/20 Foundation Partial Approval - First Floor Stair #1 masonry block partial approval( Vertical bars 4-#7s in corners, vertical #4s at 48" oc and #4s @ 16" oc at shear wall 12/29/20 Foundation Partial Approval - Masonry Wall Bond Beam and Vertical Bar. Verticals reinforcing in place bond beam reinforcing not in place Terracon on site to witness placement and concrete grout testing. Dec 31, 2020 Page (5) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Reinforcement in Place Passed 12/23/20 Foundation Partial Approval - First Floor Stair #1 masonry block partial approval( Vertical bars 4-#7s in corners, vertical #4s at 48" oc and #4s @ 16" oc at shear wall 12/29/20 Foundation Partial Approval - Masonry Wall Bond Beam and Vertical Bar. Verticals reinforcing in place bond beam reinforcing not in place Terracon on site to witness placement and concrete grout testing. Footing Dowels or Keyway in place Passed 11/24/20 Footing Partial Approval T-17 to C-11 12/2/20 Footings Partial Approval - West Elevation from C-11 to stair tower 1 to North of elevator at G16. 12/9/20 - Footings Partial Approval fromT16 to T29 12/16/20 Foundation Partial Approval - Foundation Walls T5 - T19 - Footings T25 - B38 12/18/20 Foundation Partial Approval - Footings G16 - F24 Foundation Dampproofing Failed Foundation Waterproofing Failed Footing Drain Daylight or Sump Failed Footing Drain Stone - 12 inch width Failed Dec 31, 2020 Page (6) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Footing Drain Stone - 6 inches above footing Failed Footing Drain stone - 6 mil poly Failed Backfill Approval Passed 12/11/20 Foundation Partial Approval - Foundation Insulation installed from H3 to D9 - Backfill Partial Approval from H3 to D9 12/16/20 Foundation Partial Approval - Foundation Insulation D9 - T18 - Backfill D9 - T18 12/30/20 Foundation Partial Approval - West Foundation Wall F12.5 to F21 Foundation Insulation. Ok to backfill! Plumbing Under Slab Failed PVC / Cast / Copper Failed Foundation Insulation Interior / Exterior Passed 12/11/20 Foundation Partial Approval - Foundation Insulation installed from H3 to D9 - Backfill Partial Approval from H3 to D9 12/16/20 Foundation Partial Approval - Foundation Insulation D9 - T18 - Backfill D9 - T18 12/30/20 Foundation Partial Approval - West Foundation Wall F12.5 to F21 Foundation Insulation. Ok to backfill! Rough Grade 6 inch drop within 10 ft.Failed Dec 31, 2020 Page (7) INSPECTION WORKSHEET (FDTN-007397-2020) Checklist Item Status Poly Under Slab Failed Dec 31, 2020 Page (8) O'Brien, John