2004-072 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518) 761-8201 Community Development- Building &Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Penn it Number. P20040072 Date Issued: Friday, October 22, 2004 This is to certify that work requested to be done as shown by Permit Number P20040072 has been completed. Tax Map Number: 523400-302-007-0001-021-000-0000 Location: 696 GLEN St Owner. GLENS FALLS NATIONAL BANK & TRUST CO Applicant: GLENS FALLS NATIONAL BANK & TRUST CO This structure maybe occupied as a: By Order of Town Board Commercial.Addition TOWN OF QUEENSBURY Commercial Alteration r:2)J, w Director of Building&Code gifforcel&nt Tom, TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20040072 Application Number: . A20040072 Tax Map No: 523400-302-007-0001-021-000-0000 Permission is hereby granted to: CTLENS FAT,T,S NATTONAL BANK & TRITST CO For property located at: 696 GLEN St in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Type of Construction Value Owner Address: GLENS FALLS NATIONAL BANK Commercial Addition $700,000.00 250 GLEN St Commercial Alteration GLENS FALLS, NY 12801 Total Value $700,000.00 Contractor or Builder's Name/Address Electrical Inspection Agency ADIRONDACK CONSTRUCTION 73 MOHTCAN STREET GLENS FALLS_ NY Plans&Specifications 2004-072 GLENS FALLS NATIONAL BANK TRUST CO. 1200 SQ FT ADDITION AND 1010 SQ FT ALTERATION $289.26 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday, March 25, 2005 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the To of Q ensb W 4r " a March 25, 2004 a SIGNED BY for the Town of Queensbury. Director of Building&Code Enforcement Town of Queensbury 742 Bay Road, tueensbury, NY 12804 BuBding & Code Enforcement Building Permit#7vA7 o 7— Phone:(518)761-8256 Dater Fax: (518)745-4437 Email: codcs@qum&s&".net Dear f 1� 7 Your budding permit application has been reviewed and found to be deficient in the following are= _G f 1 ED EM E C " �\ — R- These details need to be added to or noted on both sets ofpmans. Please feem -ee to contact this office with any questions regarding this ratter. CO FF10E 4lSueHemingmy\Buildimg-PumiLFORMSWefxient buj ns Tan 3003.doc i No. Topic Code Page Required Actual Section No. or Allowed 30. Mechanical Code Ventilgtion Rates MC-Table 403.3 24 Propane Below Grade MC-502.8.10.1 31 Dryer Exhaust MG-504 33 Kitchen Exhaust MC-506 34 Kitchen Hoods MC-507 37 Kitchen Make-Up Air MC-508 39 Chimney Termination MC-Table 511.2 41 Air Plenums MC-602 47 Fire&.Smoke Dampers MC-607.5.1 52 Combustion Air MC-701 55 Confined Spacesr-Def. MC-202 5 31. Fuel Gas Code Appliance Location FGC-303 18 Combustion Air FGC-304 19 Clearance to Combust. FGC-Table 308.2 25 Pipe Material FGC-403 46 Shut Off Valves FGC-409 53 Chimney Termination FGC-Fig. 503.5.4 63 Gas Vent Termination FGC-Fig. 503.6.6 65 Exit Terminal Location FGC-503.8 68 Clothes Dryer Exhaust FGC-613 96 Unvented Room Heaters FGC-620 99 3 . Energy Code Prescriptive Method ECCC-Table 602.1(1) 50 High Truss Credit ECCC-602.1.2 51 Pipe Insulation—Heating. ECCC-Table 503.3.3.1 44 Duct Insulation—Heating ECCC-Table 503.3.3.3 45 Pipe Insulation—Hot Water ECCC-Table 504.2 47- HWH Heat Trap ECCC-504.7 ' 47 COMcheck Computer Software Complia aired No�a/ JAM OD Page 6 of 10 No. Topic Code Page Required Actual Section No. or Allowed Fire Protection Equipment Central Station Monitoring FC-901.9 52 Sprinkler Systems FC-903 55 Other Exhngushing Syst. FC-904 59 Kitchen Hood Extinguisher FC-609.8 41 Standpipe Systems FC-905 62 Fire Extingushers FC-906 64 Fire Alarm Systems &SD FC-907.2 66 Fire Alarm Boxes+Zavef FC-907.4.1 `l0'i•9 72;73 Smoke Detection FC-907.2.10 68 Hi-Rise Fire Safety FC-907.2.12 69 Visible Alarms FC-Table 907.10.1.2 73 Smoke Control FC-909 75 Smoke Vents FC-910 82 Fire Pumps FC-913 . 85 "'�Sel" FC-9o3.2"/u. 29. Plumbing Code Fixture Count (r' PC-Table 403.1 21 NkMS � + /�I 3troct S,_1A Water Supply Service Pipe Size PC-603 33 Fixture Pipe Size PC-603.1 33 Pipe Material - PC-Table 605.4 36 Labor Law Art. 10-A UFPBC-904.6 12,340 Pipe Insulation See Energy Code Backflow Prevention PC-Table 608.1 41 Sprinkler System PC-608.16.4 44 Lawn Irrigation PC-608.16.5 44 Pipe Freezing PC-305.6 14 Sanitary Drainage Drain Pipe Size PC-Table 709.1 54 Drain Pipe Material PC-702 47 Labor Law Art. 10-A UFPBC-904.6 12,340 Vent Size PC-Table 910.4 63 Pipe Hangers PC-Table 308.5 17 Air Admitt PC-917 67 Note JAM Page 5 of 10 "-7 t No Topic Code Page Required Actual Section No. or Allowed 2 . Structural "Snowp�oading—Ground BC Fig 1608.2 296 �� �'� Snow Loading—Roof(calc.). ASCE-7-98 Drifting Snow BC-1608.7 295 Ponding BC-1608.3.5 295 Floor Loading BC Table 1607.1 291 Balcony Loading BC-Table 1607.1 291 Wind Loading (calc.) BC-1609 297 Roof Walls Windows Seismic Loading (calc.) BC-1614 315 Foundation Depth BC-1805.2 398 Interior Finishes BC-Table 803.4 161 s 23. Swimming Pools BC-3109 6 24. Sun Rooms BC Appendix 1 693 25. Electrical Exit Lights or Signs BC-1003.2.10 203 Emergency Lights BC-1003.2.11.2 204 Emergency Power BC-2702 611 General Lighting-Exits-Stairs -BC-1003.2.11 204 26. HC ACCESS Exempt Buildings BC-1104.4 238 Parking BC Table 1106.1 239 Route BC-1104.1 . 238 Entrance BC-1105.1 239 #of Sleeping Rooms BC-Table-1"107.6.1.1 241 Dwelling Units BC-1107.6.2 241 ���►vr�� el/'1 Toi t Facilities BC-1109.2 2 ervice Counters BC-1109.12.3 2 o efuge BC-1003.2.13.5 207 Signage Supplemental HC Req'mts Appendix E 681 27. SPECIAL INSPECTIONS BC-1704 379 Notes: -Q JmrVC5 61ttr JAM Page 4 of 10 at Binding :Permit Applicion CEI VED Town of Queensbury—Dept of Community Development,742 Bay Road,Queensb 761-8256 A pernut must be obtained beforabeginnmg construction. Permit File No.. TOWN OF QUEENS I URY No uispection will do made until apphcant has rcoeivcd"a Feo'Paid AND CO E valid building permit. All:appliearits' spaces on this' Rec:Fee Paid application:nustbe�completed andmustappear on-the Bed ewed By: applioatios form. AQ1r2-l�E.1Y ��IG CL��:i�f: Owner 6VJ� �1�Ltri �l Applicant: . " Address- Address r;� GI"J Phone#( )' - a Phone.# P=o o Location:" LotNumbert.. / House:Number. f l` P �y .�. Subdivision Name: WA6 TaxM4p'Number: +3n*2g 7 _.I -.1 o New.Building: residence /commercial 'Estiinated Market"Value of Construction: Addition :asn3enec/ commercial If=Addition,what wi11 use.of new addition be7 �. Alteration ��eaee-/ commercial � tc" �_. O No change to exterlor'slze::-r as.idonce.,,, com :1 .� o Otl'02work(doscribo ) ' C 00. ecupancy. tiformation 1'.Floor 2° ;Floor Other.floor Total' "Below sq.ft: at. Square Feet ; yam` A► ' o , Single:faattly dwellin"'; � o �:Two�famil dwellin- _ a Towrihouae O o NtultlfarAU dwelling: #of units o Morcaatilo :,� Mariufactntiri - �. 0 1 Car Q'�1CC�lP.t� $C . 6`J --- 0 2 Car detached garage'- a 3 car.detached a 1 COMAttached:garage e 2 car Mttaehed garage o 3 car attaclxed garage: LA o . Storage btulding;- commereial l e o =Storage building _residential o Other What is' proposed height of the structure; feet i inches of Will any see ond=hand or ungraded lumber be used?' If so,for what? �a e of Heatin` S stemr electric:/=oil / - : s wood ,, forced hot air,/ asebo S. Y- ga, ar other: Numbcr'of Fit,enhcces.to be'installed, .� Number of Wooer:to ba installed List below the::person(s)'responsible'for sixpervision"of work as"regards-to'building codes: Name: Address Phone Number L Builder , v Plumber. : — ' Mason - El'ectncian_ Declaration: please sign below after youhave carefully read the statement: To the:best ofmy kaowladga the statements contained in this appl�04ti on,together with the plans.and specifications submitted,are a tiuo and complete statement of all proposed work to bo:dono cn the described-promises andthat all provisions of the Building Code,the Zomng 9rdmance.and all"other lays pertainuig to'the proposedvork shall.`:be complied with,whether aped led*noted,and.that suclrwork is authorized by the owner; Portlier,it is understood that: we shall submit;prso;,to.a Certificate of Occupancy or Cerhficafe of Compliance being issued,as requested-by the Zoning Admiiiistrator,`or Director of l3uildin odes,an ;by a licensed surveyor;'drawn:to scale,,showing actual location of all'new cons n , Signature. owner,owner's agent,architect,contractor Commercial Final Inspection Report i Office No.: (518) 761-8256 Date Inspection re est r eiv d Queensbury Building&Code Enforcement Arrive: I., r Depart: E am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's it NAME:( ---��� ����,. '; <5��c )��-1 �.� PERMIT LOCATION: '—� `"` DATE: � t COMMENTS: Y N NA Chimney/"B"Vent/Direct Vent Location Plumbing Vent Through Roof 6"/Roof Complete Exterior Finish Grade Complete 6"in 10' or Equivalent Interior/Exterior Guardrails 42 in. Platform/Decks Interior/Exterior Ballisters 4 in. Spacing Platform/Decks Stair Handrail 34 in.—38 in./Step Risers 7"/Treads 11" Vestibules For Exit doors>3000 s . ft. All Doors 36 in.w/Lever Handles/Panic Hardware, if required Exits At Grade Or Platform 36(w)x 44" 1)/Canopy or Equiv. Gas Valve Shut-off Exposed&Regulator 18" Above Grade Floor Bathroom Watertight/Other Floors Oka Relief Valve,Heat Trap/Water Temp.110 Degrees Maximum Boiler/Furnace Enclosure 1 hr. or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stoclaoom/Storage/Receiving/Shipping Room(2 hr.), 1 '/2 doors > 10%> 1000 s . ft. 3/4 Hour Corridor Doors &Closers Firewalls I Fire Separation,2 Hour, 3 Hour Complete/Fire Dampers/Fire Doors Ceiling Fire Stopping, 3,000 s . ft.Wood Frame C Attic Access 30"x 20"x 30"(h),Crawl Space Access 18"x 24" Smoke Vents Or Fan,if required Elevator Operation and Signage h Sealed Handicapped Bathroom Grab Ba 'Sinke Toilets Handicapped Bath/Parking Lot Si na e Public Toilet Room Handicapped Accessible Handicapped Service Counters, 34 in., Checkout 36" Handicapped Ramp/Handrails Continuous/12 in.Beyond Active Listening System and Signage Assembly Space Final Electrical Site Plan/Variance required Final Survey,New Structure/Flood Plain certification,if req. As-built Septic System Layout Required or On File Building Number or Tenant Address on Building or Driveway Water Fountain or Cooler Building Access All Sides by.20' /Driveable Surface 20' wide Okay To Issue Temp. or Permanent C/O Okay To Issue C/C Last printed 6/3/2003 9:27 AMLL:\PamW\Building&Codes\Commercial Final Inspection Report.doc Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Inspection re est eceiv Queensbury Building& Code Enforcement Arrive: m/p ,pa a pm 742 Bay Road, Queensbury, NY 12804 Inspector's Init*als- NAME: io i - PERMIT#: �y LOCATION: INSPECT ON: � TYPE OF STRUCTURE: l , Framing Y N N/A COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %z (w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side % inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request ce ved- Queensbury Building& Code Enforcement Arrive: m e rt: a 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: i NAME: PERMIT LOCATION:.-- INSPECT ON: TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain/Vents Cast Iron, Copper Drain/Vent/Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates 1 % inch min. Drain Size Washing Machine Drain 2 inch min. Bead or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction Water Supply Piping Cooper Commercial Coo er, CPVC,Pex One and Two-Family nsulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape COMMENTS LASueHemingway\Building.Codes.Inspection.FORM S\Rough Plumbing Insulation Report.doc November 17,2003 \ Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Inspection req4a<r c edy: Queensbury Building& Code-Enforcement Arrive: espl� rt; '- aIn/pm 742 Bay Road, Queensbury, NY 12804 Inspector's Imtia NAME: �� PERMIT#: , —o LOCATION: �� L} �,�� (� �, � INSPECT ON: -- TYPE OF STRUCTURE: Framing Y N N/A COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate I %2 (w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wallL ` U Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\Suel-lemingway\Building.Codes.I»spection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Rough Plumhin / Insulation I g g Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building& Code Enforcement Arrive: /Y, am/pm Depart: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: PERMIT #: (D — 0 7o� LOCATION: INSPECT ON: TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2, R-3,R4 Drain/Vents Cast Iron, Copper Drain/Vent/ Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates 1 % inch min.. Drain Size Washing Machine Drain 2 inch min. Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction Water Supply Piping Cooper Commercial 0o er, CPVC,Pex One and Two-Family Afisulation/Residential Check/ Commercial Chec ). Proper Vent, Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air S!!pply for Furnace Duct work sealed properly/No duct tape COMMENTS: // Ire e's� S✓�r�"= V�//Jf/65 �" G/'�k'�,t C�o i✓:�l�l`' LASueHemingwey\Building.Codes.Inspection.FORM S\Rough Plumbing Insulation Report.doc November 17,2003 Framing / Firestopping Inspection Report 0 /0 Office No. (518) 761-8256 Date Inspection request received: Queensbury Building& Code Enforcement Arrive: 9e�i,_ am/pm Depart: ani/pm 742 Bay Road, Queensbury, NY 12804 Inspector's Initials: 9,) NAME: ' CP_txnJ, PERMIT LOCATION: INSPECT ON: - — TYPE OF STRUCTURE: Y raming N N/A COMMENTS Ake Jack Studs/H ders Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12" O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %2 (w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour / Firestopping p Penetration sealed 16 inch insulation in cavity min. Cep `G� Garage Fire Separation �`, ef House side %2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade I_ASueFlemingway\Building.Codes.Inspection.FORM S\Framing Firestopping Inspection Report.doc January 28,2003 t � Framing / Firestopping Inspection Report Office No. (518) 761-8256 Date Inspection re est c 'v Queensbury Building& Code Enforcement Arrive: in/ epart: am/pm 742 Bay Road, Queensbury, NY 12804 Inspector's Im a r NAME: CaF ►'�i I��A� G3��1� PERMIT#: c)t, LOCATION: L INSPECT ON: TYPE OF STRUCTURE: R DO-/ — Y N N/A Framing COMMENTS Jack Studs/Headers �—�=� � F��,-t ARCH/ E.k-c Bracing/Bridging �pQ o , Joist hangers �11--C-, -b` 9-0CV0?--N QAMoi�L Jack Posts/Main Beams Exterior sheeting nailed properly 12" O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %2 (w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3, 4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side '/2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Frraming Firestopping Inspection Report.doc January 28,2003 RECEIVE® AUG G 9 2004 CRANDELL TOWN OF QUEENSBURY BUILDING AND CODE ASSOCIATES ARCHITECTS and FACILCIY PLANNERS,P.C. August 6,2004 Building&Code Enforcement Town of Queensbury 742 Bay Road Queensbury,NY 12804 Attn: John O'Brien RE: Glens Falls National Bank Branch Renovations 696 Upper Glen Street Queensbury,New York Gentlemen: The'structural framing of the.additions for the above project has been constructed per the Contract Documents,with the exception of substitution of welded connections for indicated bolted intersections. These substitutions were made to facilitate job conditions and were reviewed by Clark Engineering,PC;the project structural engineer. Please contact me at 793 5144 if you have any further questions. Sincerely, Curtis D.Dybas Cc: Kris Johnson,Adirondack Const. ■ P.O.BOX 229,5 GROVE AVENUE GLENS FALLS,NEW YORK 12801 PHONE 518.793.5144 FAX 518-793.0214 info@cmndellpc.com Rough Plumbing / Insulation Inspection Report Office No. (518)761-8256 Date Insp ction request received: 9/1 4 Queensbury Building&Code Enforcement Arrive: ' am/ m Depart: am/pm 742 Bay Road, Queensbuzy,NY 12804 Inspector's Initials: NAME: \ A �l l t�. '� `1�1Q�L�L PERMIT LOCATION: (a (y _ Orn. INSPECT ON: MIN c - 1111 00 3►x. TYPE OF STRUCTURE: Alfp��LE' Y N N/A PVC: R-1,R-2,R-3,R-4 Drain/Vents Cast Iron,Copper Drain/Vent/Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copper Commercial Copper, CPVC,Pex One &Two Family �J sulation/Residential Check/Commercial Check Proper Vent,Attic Vent rJ 1✓�;�°r �r � Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly COMMENTS: L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection r que r ei ed: Queensbury Building&.Code Enforcement Arrive: ani/ Depart: an 742 Bay.Rd., Queensbury,lvl' 12804 Inspector's Ini 'als• NAME: ERMIT#: y L� LOCATION: _ INSPECT ON: TYPE. OF STRUCTURE: Comments ____ -------- __ 4' N N/A Footings �^ Piers "Mono Slab R ' forcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement ` of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper — . dation Insulatio . me '— Exterior Rough Grade 6 inch drop within 10 ft. L:\SucHemingway\Building.Codes.Inspcetion.FORMS\foundation Inspection Report.doc January 28,2003 `Q*'�J'T i�U Framing / Firestopping Inspection port Office No. (518) 761-8256 Date Inspection quest ceiv Queensbury Building & Code Enforcement Arrive: am/p part: _ a 742 Bay Road, Queensbury, NY 12804 hispector's Ini ial l� NAME: PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: I Y N N/A Framing COMMENTS � �. � Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %2 (w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall y � Fire separation 1, 2, 3 hour - V ire wall 2, 3, 4 hour Firestopping Penetration sealed 7, 16 inch insulation in cavity min. Garage Fire Separation House side %2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\SueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date InspectionrERMIT iv d: Queensbury Building&.Code Enforcement Arrive: Depart: _ - a 742 Bay Rd., Queensbury,NY 12804 Inspector's Initi NAME: Cc�-� \ � : _ v LOCATION: _ter' ��� � - _ II�TSPECT ON: 7 TYPE OF- STRUCTURE:' Comments Footings Piers Monolithic Slab f rcement in Place �i The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site._ Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing i Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper F undation Insulation Interior/Exterior eV . R Rough Grade 6 In drop within 10 ft. L:\SueHcmingway\Ruilding.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection re est c 'v d: Queensbury Building&Code Enforcement Arrive: pm Depart: an. 742 Bay Rd., Queensbury,NY 12804 Inspector's Initi NAME: G��r RMIT#: Ll / LOCATION - INSPECT ON: TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab Gvt C/ ast/Copper r undation Insulatio Irate ' /Exterior R- o \U Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes,InspectionTORMSToundation Inspection Report.doc January 28,2003 l Foundation Inspection Report Office No. (518) 761-8256 Date Inspecti n r t eive . Queensbury Building&Code Enforcement Arrive: ; '� Depart: "_ a fi 742 Bay Rd., Queensbury,NY 12804 Inspector's In ' NAME: l v ( RMIT LOCATION: rv` _ INSPECT ON: TYPE OF STRUCTU I Comments Y N NIA Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 h urs following the placement of th oncrete. aterials for this purpose on site. oundation/Wallp our Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Insle e c i ed: Queensbury Building&Code Enforcement Arrive: Depart:742 Bay Rd., Queensbury,NY 12804 InspectoNAME: _ CR, RMIT#:LOCATION: PECT ON: -- TYPE OF STRUCT . Comments Y N N/A Footings Piers Monolithic Slab ;Reyinlfcement in Place contractor is responsible for ving protection from freezing forP8 hours following the placement of he concrete. aterials for this purpose on site. F undation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Bacicfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report 9 o�. Office No. (518) 761-8256 Date Inspection request eceived: tva & /0 o 4 Queensbury Building&Code Enforcement Arrive: am/ Depart: pm 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: NAME: �L �_ PERMIT LOCATION: <o ter INSPECT ON: TYPE OF STRUCTURE: ; 1, t '�7 Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump. Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASueHemingway\Building.Codes.Inspection.FORMSToundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection re uest r cei e _ Queensbury Building&Code Enforcement Arrive:" m/pm Depart: a a m' 742 Bay Rd., Queensbury,NY 12804 Inspector's Initi ls: NAME: To: LOCATION: SPECT ON: — TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab enforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHeniingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 A-2i Rough Plumbing / Insulation Inspection Report 0 Office No. (518) 761-8256 Date Inspection re est rece- e . Queensbury Building&Code Enforcement Arrive: rt: a m 742 Bay Road, Queensbury,NY 12804 Inspector's Init r NAME: 1` PERMIT LOCATION: INSPECT ON: — �Cf TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R-4 Drain/Vents Cast Iron, Copper Drain/Vent/Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates Head or Air Supply Test Drain and Vents 5 PSI or 10 ft. above highest Connection for 15 minutes Water Supply Piping Copqzr Commercial `� Rn per, CPVC,Pex One &Two Family 4` ��- sulation/Residential Check/Commercial Check Proper Vent, Attic Vent \ Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct Work Sealed Properly COMMENTS: L:\SueHemingwaylBuilding.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection rerec. / Queensbury Building&Code Enforcement Arrive: aepart: y a m 742 Bay Rd., Queensbury,NY 12804 Inspector's Initial NAME: Un 7�n P LOCATION: INSPECT ON: . — --0 TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Ma als for this purpose on site. F dation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump. Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 3 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection requ t r ei Queensbury Building&Code Enforcement Arrive:C �" a Depart: 742 Bay Rd., Queensbury,NY 12804 Inspector's Initia NAME: P RMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement o e concrete. aterials for this purpose on site. oundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sulnp Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Bacicfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\SueHemingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/pm Depart: -am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: �� I c�, �,�r�� PERMIT#: LOCATION: L INSPECT ON: TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inc es above footing nil poly for wet areas under slab B'ackf"ill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. USueHemingway\Building.Codes.Inspection.FORMSToundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection!SPECT ues rec iv Queensbury Building&Code Enforcement Arrive: /pI Depart: am/ 742 Bay Rd., Queensbury,NY 12804 Inspector's Initi NAME: L" '� �mG� 5—�'�11 #: �"� LOCATION: — ON: TYPE OF STRUCTURE: Comments Y N N/A ootings . Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 roil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASuellemingway\Building.Codes.Inspection.FORMSToundation Inspection Report.doe January 28,2003 Rough Plumbing / Insulation Inspection Report wnh Office No. (518) 761-8256 Date Inspection request received: Queensbury Building& Code Enforcement Arrive: P,%(� am/pm Depart: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: -— (;;A -- 7 NAME: Q, a PERMIT #: LOCATION: INSPECT ON: S— (p-C)C� TYPE OF STRUCTURE: Y N N/A PVC: R-1, R-2,R-3,R4 Drain/Vents Cast Iron, Copper Drain/Vent/Comm. Plugg6g Vent/Vents in Place jb5ugh Plumbing/Nail Plates ' 1 % inch min. Drain Size Washing Machine Drain 2 inch min. Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction Water Supply Piping Cooper Commercial Cooper, CPVC,Pex One and Two-Family Insulation/Residential Check/ Commercial Check Proper Vent, Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape COMMENTS: ,lam L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection request received: `F Queensbury Building&Code Enforcement Arrive: ' am/pm Depart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: C��N�`i' PERMIT#: Z' / LOCATION: &9& INSPECT ON: J l G TYPE OF STRUCTURE: / 0(1�f old ro c Comments Y N N/A ootin s Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump. Footing Drain Stone: 1.2 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASuelIemingway\Building.Codes.InspectionTORMSToundation Inspection Report.doc January 28,2003 L Commercial Final Inspection Report Office No.: (518) 761-8256 Date Inspection re est r ce' e . Queensbury Building&Code Enforcement Arrive: a pm Depart: a111"p, 742 Bay Road, Queensbury,NY 12804 Inspector's Initial NAME. G,V PERMIT#: LOCATION: �' DATE: — COMMENTS: Y N NA Chimney/"B"Vent/Direct Vent Location Plumbing Vent Through Roof 6"/Roof Complete Exterior Finish Grade Complete 6"in 10' or Equivalent Interior/Exterior Guardrails 42 in.Platform/Decks Interior/Exterior Ballisters 4 in. Spacing Platform/Decks Stair Handrail 34 in.—3 8 in./Step Risers 7"/Treads 11" Vestibules For Exit doors>3000 s . ft. All Doors 36 in.w/Lever Handles/Panic Hardware, if required Exits At Grade Or Platform 36 (w)x 44"(1)/Canopy or Equiv. . Gas Valve Shut-off Exposed&Regulator 18" Above Grade Floor Bathroom Watertight/Other Floors Oka Relief Valve,Heat Trap/Water Temp. 110 Degrees Maximum Boiler/Furnace Enclosure 1 hr. or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stoclaoom/Storage/Receiving/Shipping Room(2 hr.), 1 '/z doors > 10%> 1000 s . ft. 3/a Hour Corridor Doors &Closers Firewalls/Fire Separation,2 Hour, 3 Hour Complete/Fire Dampers/Fire Doors Ceiling Fire Stopping, 3,000 s . ft.Wood Frame Attic Access 30"x 20"x 30"(h),Crawl Space Access 18"x 24" Smoke Vents Or Fan, if required Elevator Operation and Si a e/Shaft Sealed Handicapped Bathroom Grab Bars/Sinks/Toilets Handicapped Bath/Parking Lot Si na e Public Toilet Room Handicapped Accessible Handicapped Service Counters, 34 in., Checkout 36" Handicapped Ram /Handrails Continuous/12 in.Beyond Active Listening System and Signage Assembly Space Final Electrical Site Plan/Variance re uired Final Survey,New Structure/Flood Plain certification,if re . As-built Septic System Layout Required or On File BuildingNumber or Tenant Address on Buildingor Drivewa Water Fountain or Cooler Building Access All Sides by 20' /Driveable Surface 20' wide Okay To Issue Temp. or Permanent C/O Okay To Issue C/C Last printed 6/3/2003 9:27 AML:\PamW\Building&Codes\Commercial Final Inspection Report.doc Foundation I ection Report Office No. (518)761-8256 Date Inspection req est ec ved• I o Queensbury Building&Code Enforcement Arrive: a p /De rt: m 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials NAME: C ��� 1� � PE IT#: � ' LOCATION: INSPECT ON: . TYPE OF STRUCTURE: Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 1.2 inch width 6 inches above footing ,poly for wet areas under slab ac:_,all ,pprovaI 01 Plumbing Under Slab PVC/Cast/Copper 'Ij Foundation Insulatio Interior xterior 1 R- ;� = Rough Grade 6 inch op within 10 ft. L:\SueHemingway\Bui]ding.Codes.Inspection.FORMS\Foundadon Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518)761-8256 Date Inspection Aa 1: 1 S OS Queensbury Building&Code Enforcement Arrive: Depart:742 Bay Rd., Queensbuiy,NY 12804 Inspector's InitiNAME: �" ��� LOCATION: & S INSPECT ON: G TYPE OF STRUCTURE: 'Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Danipproofing Foundation/Waterproofing Type of Dampproofmg/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 1.2 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval umbing der Sla PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:1SueHemingway\Building.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Town of Queensbury Fire Marshal's Office 742 Bay Road Queensbury, NY 12804 Phone (518) 761-8205 Fax(518) 745-4437 Fire Marshal's Inspection Report Request SCHEDULE Received: Permit# y`i�07 INSPECTION ON: l Name: 0� ,2 AM /PM /.ANYTIME Location: �y°" APPROVED / N/A, YES NO ZCOMMENTS EXIT ACCESS EXIT ENCLOSURE EXIT DISCHARGE MAIN AISLE WIDTH �6 Gu SECONDARY AISLE WIDTH EXIT SIGN-NORMAL EXIT SIGN-BATTERY I A"lCi R L EMERGENCY LIGHTING FIRE EXTINGUISHER HUNG FIRE EXTINGUISHER INSPECTION FIRE EXTINGUISHER HYDRO FIRE ALARM SYSTEM FIRE ALARM -FAN SHUTDOWN FIRE SPRINKLER SYSTEM FIRE SUPPRESSION-KITCHEN FIRE SUPPRESSION-GAS ISLAND HOOD INSTALLATION INTERIOR FINISHES STORAGE COMPRESSED GAS CLEARANCE TO SPRINKLERS CLEARANCE TO ELECTRICAL ELECTRIC WIRING ENCLOSED COMBUSTIBLE WASTE VEHICLE IMPACT PROTECTION FIRE LANE F.D.SIGNAGE-UTILITY ROOMS NO SMOKING SIGNS MAXIMUM OCCUPANCY SIGN EMERGENCY EVAC PLAN OK THIS DATE K R O NOT OK INSPECTED BY COMDEVICHRISJ/WORD/LETTERS2001/FIREMARS HALINSPECTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY Commercial Final Inspection Report Office No.: (518)761-8256 Date Inspection request r Queensbury Building&Code Enforcement Arrive: Z zo a Depart: am/ 742 Bay Road, Queensbury,NY 12804 Inspector's Initials. _ NAME: PE #: LOCATION: �(p �-���f� � ( 1=\ DA q - \lo - Zeoy\ COMMENTS: Y N NA Chimney/"B"Vent/Direct Vent Location o c-c- Plumbing Vent Through Roof 6"/Roof Complete Exterior Finish Grade Complete 6"in 10' or Equivalent 't Interior/Exterior Guardrails 42 in. Platform/Decks Interior/Exterior Ballisters 4 in. Spacing Platform/Decks Stair Handrail 34 in.-38 in./Step Risers 7"/Treads 11" Vestibules For Exit doors>3000 s . ft. All Doors 36 in.w/Lever Handles/Panic Hardware,if required Exits At Grade Or Platform 36 (w)x 44"(1)/Canopy or Equiv. Gas Valve Shut-off Exposed&Regulator 18" Above Grade Floor Bathroom Watertight/Other Floors Oka Relief Valve,Heat Trap/Water Temp. 110 Degrees Maximum Boiler/Furnace Enclosure 1 hr.. or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stockroom/Storage/Receiving/Shipping Room(2 hr.), 1 '/Z doors > 10%> 1000 s . ft. 3/a Hour Corridor Doors&Closers Firewalls/Fire Separation, 2 Hour, 3 Hour Complete/Fire Dampers/Fire Doors 'Ceiling Fire Stopping, 3,000 s . ft.Wood Frame Attic Access 30"x 20"x 30"(h), Crawl Space Access 18"x 24" Smoke Vents Or Fan, if required Elevator Operation and Si a e/Shaft Sealed Handica ed Ba oom Grab Bars/Sinks/Toilets Handicapped Bath Parkin Lot i na e Public Toilet Room Handicapped—Accessible Handicapped Service Counters, 34 in., Checkout 36" Handicapped Ram /Handrails Continuous/12 in.Beyond Active Listening System and Signage Assembly Space Final Electrical Site Plan/Variance required Final Survey,New Structure/Flood Plain certification,if reg. As-built Septic System Layout Required or On File Building Number or Tenant Address on Building or Driveway Water Fountain or CoolerM\ � Building Access All Sides by 20' /DrivkAble Surface 20' wide `Oita To Issue Te . r Permanent C/O ssu Last printed 6/3/2003 9:27 AML:\PamW\Building&Codes\Commercial Final Inspection Report.doc • Pioneer Elevator Inspection Services CHECKLIST FOR INSPECTION OF HYDRAULIC ELEVATORS GENERAL NOTES: (a)See ASME A17.2-2001 for detailed inspection information on each item number. ®®� (b) OK = meets requirements; NG = insert number to identify comment on back of ' Checklist; NA = not applicable. ,:.Address. G �P N 5 ra i --- ❑ Routine inspection -a nd to Q�EE os �t'CsL 0P,0 E Acceptance inspection 2 C(Eiv S�. ❑ Periodic inspection_and to ❑ ��' o F-ENs-emu P-u N q ( a�0 ASME A .1-2000 ,ID No: �o o 4oq e/V7 Code Edition: Andrew rew am ey Jr. Inspected by: int gJ Passenger Rated load: 02l 0 o Signatur Date: -1-�T -� ❑ Freight class Speed: 10U QEI NoC-2985 Certifyin organization. S STAX+:�i)+Ct 360 P5t \RU N IUINCt f-{op pSy ►=u11 LORD OK NG NA % PASS `00 p`� % 1=u11 j-,,A.D OK NG NA y 1 ELEVATOR-INSIDE OF CAR _ _ _ _ _ 2.35--Supply-line-and shutott valve-- -- �J- ,❑ -❑ 1.1---Door reopening device [)K ❑ ❑ 2.36 Hydraulic cylinders 9 ❑ ❑ 1.2 Stop switches 15?l ❑ ❑ 2.37 Pressure switch ❑ ❑ .® 1.3 Operating control devices 4 ❑ ❑ 2.39 Roped water hydraulic elevators ❑ ❑ jZJ 1.4 Sills and car floor N ❑ ❑ 1.5 Car lighting and receptacles 91 ❑ ❑ 3 ELEVATOR-TOP OF CAR 3.1 Top-of-car stop switch X ❑ ❑ 1.6 Car emergency signal IN ❑ ❑ 3.2 Car top light and outlet ® Cl ❑ 1.7 Car door or gate �1 ❑ ❑ 3.3 Top-of-car operating device 9 ❑ ❑ 1.8 Door closing force 1 ❑ ❑ � 3.4 Top-of-car clearance and refuge space ❑ ❑ '1.9 Power closing of doors or gates ❑ ❑ 1.10 Power opening of doors or gates JR El El3.5 Normal terminal stopping device ❑ ❑ 3.6 Final and emergency terminal stopping 14 ❑ ❑ 1.11 Car vision panels and glass car doors ❑ ElX , . devices 1.12 Car enclosure 9 ❑ ❑ 1.13 Emergency exit � ❑ 3.7 Car leveling and anticreep devices � ❑ El ❑ 3.8 Top emergency exit X ❑ ❑ 1.14 Ventilation ❑ 1.15 Signs and operating device symbols X) El 3.9 Floor and emergency identification ❑ ❑ numbering 1.16 Rated load, platform area, and data plate 9 ❑ ❑ 3.10 Hoistway construction liq ❑ ❑ 1.17 Standby power operation ❑ ❑ PS 3.11 Hoistway smoke control ® ❑ ❑ 1.18 Restricted opening of car or hoistway ❑ ❑ 9 3.12 Pipes,wiring,and ducts ❑ ❑ doors 3.13 Windows, projections,recesses,and ❑ ❑ 1.19 Car ride PC ❑ ❑ setbacks 2 ELEVATOR--MACHINE ROOM 3.14 Hoistway clearances ❑ Cl 2.1 Access to machine space ❑ ❑• 3.15 Multiple hoistways ❑ ❑ 2.2 Headroom 9 ❑ ❑ 3.16 Traveling cables and junction boxes ❑ ❑ 2.3 Lighting and receptacles 54 ❑ ❑ 3.17 Door and gate equipment__ ..___ -_ _,� ❑-- ❑ 2.4 • Machine space_ 3-18 Car frame and stiles ❑ ❑ 2.5 Housekeeping ❑ ❑ 3.19 Guide rails,fastenings,and equipment ® ❑ ❑ 2.6 Ventilation ❑ ❑ 3.20 Governor rope ❑ El (� 2.7 Fire extinguisher ,® ❑ ❑ 3.21 Governor,releasing carrier Cl ❑ 2.8.; _Pipes,wiring,and ducts ,� ❑ ❑ 3.22 Wire rope fastening and hitch plate ❑ ❑ 2.9 Guarding of exposed auxiliary equipment 0 ❑ ❑ 3.23 Suspension rope ❑ ❑ 19 2.10 Numbering of elevators, machines,and ❑ ❑ 3.30 Speed test In. ❑ ❑ disconnect switches 3.31 Slack rope device-roped-hydraulic ❑ ❑ 2.11 Disconnecting means and control ❑ ❑ elevators installed under A17.1b-1989 2.12 Controller wiring,fuses,grounding, etc. ❑ ❑ and later editions 2.13 Governor,overspeed switch,and seal ❑ ❑ to 3.32 Traveling sheave-roped-hydraulic ❑ ❑ 2.14 Code data plate 05 ❑ ❑ elevators installed under A17.1b-1989 2.30 Hydraulic power unit in ❑ ❑ and later editions 2.31 RAlief valves El El 3.33 Counterweight ❑ ❑ 2.32 Control valve 29 ❑ ❑ 4 ELEVATOR-OUTSIDE HOISTWAY 2.33• Tanks 91 ❑ ❑ 4.1 Car platform guard ) ❑ ❑ 2.34 Flexible hydraulic hose and fitting ❑ ❑ 19 4.2 Hoistway doors ❑ ❑ assemblies This Checklist,A05007,may be obtained from the ASME Order Dept.,22 Law Drive,Box 2300,Fairfield,NJ 07007-2300 IIUIu1111U�I���IIAII� (12/01) "' A05007 CHECKLIST FOR INSPECTION OF HYDRAULIC ELEVATORS (Back) OK NG NA OK NG NA 4.3 Vision panels ❑ ❑ 5.6 Governor rope tension device ❑ ❑ 4.4 Hoistway door locking device je, ❑ ❑ 5.7 Car frame and platform )9L ❑ ❑ 4.5 Access to hoistway J, ❑ ❑ 5.8 Car safeties and guiding members- ❑ ❑ 4.6 Power closing of hoistway doors ❑ ❑ �@3 including roped-hydraulic elevators installed under A17.1b-1989.and later... 4.7 Sequence operation ❑ ❑ editions 4,8 Hoistway enclosure �!s .❑ 4.9 Elevator parking device ;@" ❑ ❑ 5.11 Plunger and cylinder Cl ❑ 4.10 Emergency doors in blind hoistways ❑ ❑ 5.12 Car buffer ❑ ❑ 4.12 Standby power selection switch ❑ ❑ 5.13 Guiding members ❑ ❑ . 5 ELEVATOR-PIT 5.14 Supply piping ❑ ❑ ' 5.1 Pit access, lighting,stop switch, and ❑ ❑ 6 ELEVATOR-FIREFIGHTERS'SERVICE condition 6.1 ❑ A17.1b-1973 through A17.1b-1980 ❑ ❑ ❑ 5.2 Bottom clearance, runby, and minimum ❑ ❑ 6.2 ❑ A17.1-1981 through A17.1b-1983 ❑ ❑ ❑ refuge space 6.3 ❑ A17.1-1984 through A17.1a-1988 and ❑ ❑ ❑ 5.4 Normal terminal stopping devices ❑ ❑ A17.3 5.6 Traveling cables Kj ❑ ❑ 6.4 ❑ A17.7b-1989 through A17.161-2000 ❑ ❑ Comments: --- - - - 65: eve OP_ E C'Cf`oTANCE �A.,spP-ciroru t4A),b y L L Lo,4 IW-1 1-1 - . Commercial Final Inspection Report Office No.: (518)761-8256 Date Inspection req t r eiv Queensbury Building&Code Enforcement Arrive: p ; Depart: -0 am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's In r NAME: 6p,tjTERMI 2-00-1 LOCATION: DATE — ► 57 0 COMMENTS: Y N NA Chimney/"B"Vent/Direct Vent Location Plumbing Vent Through Roof 6"/Roof Complete Exterior Finish Grade Complete 6"in 10' or Equivalent Interior/Exterior Guardrails 42 in.Platform/Decks �� b Lo n Interior/Exterior Banisters 4 in. Spacing Platform/Decks A Q c� Stair Handrail 34 in.—38 in./Step Risers 7"/Treads 1111L�� ��� Vestibules For Exit doors>3000 s . ft. All Doors 36 in.w/Lever Handles/Panic Hardware,if re Exits At Grade Or Platform 36 (w)x 44"(1)/Canopy or Equiv. Gas Valve Shut-off Exposed&Re_u Above Grade Floor Bathroom Watertight/ tiler Floors Oka ��� Relief Valve,Heat Trap/Water emp. 110 Degrees Maximum ` Boiler/Furnace Enclosure 1 hr.. or Fire Extinguishing System Fresh Air Supply for Occupancy/Ventilation Combustion Low Water Shut Off For Boilers Gas Furnace Shut Off Within 30 ft. or Within Line Of Site Oil Furnace Shut Off at Entrance to Furnace Area Stoclaoom/Storage/Receiving/Shipping Room(2 hr.), 1 '/z doors > 10%> 1000 s .ft. 3/a Hour Corridor Doors&Closers Firewalls/Fire Separation, 2 Hour, 3 Hour Complete/Fire Dampers/Fire Doors V U Ea M,LA A Ceiling Fire Stopping, 3,000 s . ft. Wood Frame Attic Access 30"x 20"x 30"(h), Crawl Space Access 18"x 24" Smoke Vents f-r-egxir E�x%di�,-a eration a S haft SealesW Hd Bathroom Grab Bars/Sinks/Toilets ,Handicapped Bath Parking Lo SigDage Public et 1Zoom Handica ed ccesslble Handicapped Service Counters, 34 in., Checkout 36" Handicapped Ramp/Handrails Continuous/12 in.Beyond Active Listening System and Signage Assembly Space Final Electrical Site Plan/Variance required Final Survey,New Structure/Flood Plain certification,if req. As-built Septic System Layout Required or On File Building Number or Tenant Address on Building or Driveway Water Fountain or Cooler Building Acce�s-Al_Side by 20' /Driveable Surface 20' wide Okay To Issu6 Tem Permanent C/O Okay To Issue Last printed 6/3/2003 9:27 AML:\PamW\Building&Codes\Commercial Final Inspection Report.doc goo cair. Pier, vork. Cko p� Alo� F106 ,�u• GrIX /2uo PL. Lever 10 Avex. o� CRANDELL ASSOCIATES AACHITFC7S and FACII.IIY PLAWTIFAS.P.0 /�) y, ► J'� P.O.BOX 229,5 GROVE AVENUE GLENS FALLS,NEW YORK L2801 PHONE 51&793.5144 FAX 518-793-0214 1v �D Town of Queensbury Fire Marshal's Office 742 Bay Road Queensbury, NY 12804 Phone (518) 761-8205 Fax(518) 745-4437 Fire Marshal's Inspection Report Request SCHEDULE Received: Permit# D L� INSPECTION ON: Name: "�-ti-` ( I AM) M PM ANYTIME Location: V APPROVED N/A YES NO COMMENTS EXIT ACCESS EXIT ENCLOSURE EXIT DISCHARGE � MAIN AISLE WIDTH. t L ci SECONDARY AISLE WIDTH L S A14 h W-1 EXIT SIGN—NORMAL EXIT SIGN-BATTERY . EMERGENCY LIGHTING FIRE EXTINGUISHER HUNG FIRE EXTINGUISHER INSPECTION FIRE EXTINGUISHER HYDRO FIRE ALARM SYSTEM FIRE ALARM -FAN SHUTDOWN . FIRE SPRINKLER SYSTEM FIRE SUPPRESSION-KITCHEN FIRE SUPPRESSION-GAS ISLAND HOOD INSTALLATION INTERIOR FINISHES' :. STORAGE COMPRESSED GAS CLEARANCE TO SPRINKLERS CLEARANCE TO ELECTRICAL ELECTRIC WIRING ENCLOSED COMBUSTIBLE WASTE VEHICLE IMPACT PROTECTION FIRE LANE F.D.SIGNAGE—UTILITY ROOMS NO SMOKING SIGNS MAXIMUM OCCUPANCY SIGN EMERGENCY EVAC PLAN OK THIS DATE FOR CO (tOT DOK INSPECTED BY COMDEVICHRISJMORDILETTERS20011FIREMARSHALINSPECTIONREPORT11022001 WHITE—BUILDING DEPARTMENT COPY YELLOW—OCCUPANT COPY 1 ow Town of Queensbury Fire Marshal's Office 742 Bay Road 4' lO AJ 5"�&0 0 Queensbury, NY 12804 , r T , Phone (518) 761-8205 Fax(518) 745-4437 Iv Fire Marshal's Inspection Report Request SCHEDULE Q J Received: Permit# ��� _��� INSPECTION ON: Name: mo— ) + PM ANYTIME Location: APPROVED N/A YES NO COMMENTS EXIT ACCESS EXIT ENCLOSURE X Pvtt eA �f7 EXIT DISCHARGE MAIN AISLE WIDTH SECONDARY AISLE WIDTH EXIT SIGN-NORMAL xw D EXIT SIGN-BATTERY EMERGENCY LIGHTING FIRE EXTINGUISHER HUNG FIRE EXTINGUISHER ` INSPECTION FIRE EXTINGUISHER HYDRO v FIRE ALARM SYSTEM ,nfl � t p FIRE ALARM -FAN SHUTDOWN ` �h 4,t /V e &4-o vc FIRE SPRINKLER SYSTEM FIRE SUPPRESSION-KITCHEN FIRE SUPPRESSION-GAS ISLAND HOOD INSTALLATION I INTERIOR FINISHES STORAGE X 04 - � - lA �1�t- � �r lt'V COMPRESSED GAS 4aAAil" � � CLEARANCE TO SPRINKLERS CLEARANCE TO ELECTRICAL xCv, 4 1�0 I -�(o Q ELECTRIC WIRING ENCLOSED l COMBUSTIBLE WASTE VEHICLE IMPACT PROTECTION FIRE LANE F.D.SIGNAGE-UTILITY ROOMS ' NO SMOKING SIGNS MAXIMUM OCCUPANCY SIGN EMERGENCY EVAC PLAN O T IS DATE OK CO NOT OK JcS INSPECTED BY COMDEVICHRISJIWORDILETTERS20011FIREMARS HALINSPECTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY e.� Town of Queensbury Fire Marshal's Office f Q 742 Bay Road / Queensbury, NY 12804 Phone (518) 761-8205 Fax(518)745-4437 Fire Marshal's Inspection Report Request y 1`1_ 0 SCHEDULE _!I Received: 0- IS-O `\ Pennit# I INSPECTION ON: IName: �� C �1__T- - U � M PM ANYTIM h 1 1� r�1 _�- j Location: APPROVED N/A. YES NO COMMENTS EXIT ACCESS EXIT ENCLOSURE EXIT DISCHARGE MAIN AISLE WIDTH SECONDARY AISLE WIDTH EXIT SIGN-NORMAL A`� EXIT SIGN-BATTERY x 1 V EMERGENCY LIGHTING o `� FIRE EXTINGUISHER HUNG u FIRE EXTINGUISHER INSPECTION FIRE EXTINGUISHER HYDRO 5 FIRE ALARM SYSTEM FIRE ALARM -FAN SHUTDOWN (y h FIRE SPRINKLER SYSTEM W FIRE SUPPRESSION-KITCHEN FIRE SUPPRESSION-GAS !�t� ISLAND Ix HOOD INSTALLATION INTERIOR FINISHES x 1 STORAGE COMPRESSED GAS CLEARANCE TO SPRINKLERS CLEARANCE TO ELECTRICAL ELECTRIC WIRING ENCLOSED COMBUSTIBLE WASTE Q� VEHICLE IMPACT PROTECTION U 1 FIRE LANE X11 F.D.SIGNAGE-UTILITY ROOMS 1'� j 1 NO SMOKING SIGNS 0)1 MAXIMUM OCCUPANC Y SIGN EMERGENCY EVAC PLAN r , ap K o O IS DA - K FOR CO NOT OK IN COMDEVICHRISJNVORDILETTERS20011FIREMARSHALIN CTIONREPORT11022001 WHITE-BUILDING DEPARTMENT COPY YELLOW-OCCUPANT COPY NAC) -- r AFT COPY (3/21103) ® t � CHECKLIST NYS BUILDING'CODE(BC) Building: G\_e%Qb NYS FIRE CODE (FC) t� NYS PLUMBING CODE (PC) Location: NYS MECHANICAL CODE (MC) NYS FUEL GAS CODE (FGC) Date: -z— — Z�5 —CIA— NYS ENERGY CODE (ECC) Reviewer: Publication Date: May 2002 COMMERCIAL & MULTIPLE DWELLING OCCUPANCIES No. Topic Code Page Required Actual Section No. or Allowed 1 Jurisdiction BC-101.2 1 2 Flood Plain BC-1603.1.6 285 3 Separated or Non-Separated BC-302.3 18 Occupancies* 4 Occupancy BC-302 17 13 5 Type of Construction BC-Table 601 81 'Z 3 6 No. of Sleeping Units/Level BC-202 14& No. of Units—Total 31 No. of Occupants BC-Table 1003.2.2.2 201 7 Covered Malls BC-402 33 Hi-Rise (75'Rule) BC-403 36 Atriums BC-404 37 8 :.Basement Definition BC-502.1 71 (See page 8 of this check list) Legend: - NR= Not Required NS= Not Shown NA= Not Applicable Note: * Non-separated occupancies impose the most restrictive requirements JAM Page 1 of 10 M1 No. Topic Code Page Required Actual Section No. or Allowed 9. Heights & Building Areas Maximum Tabular Area BC-Table 503 72 Maximum Tabular Height BC-Table 503 72 Maximum Stories BC-Table 503 72 Mezzanines BC-505 73 10. Sprinkler System (water,) BC-903 168 Basement Sprinkler BC-903.2.10.1 170 Water Source Sprinkler BC-903.3.5 172 Water Source Site FC-508.1 31 11. Frontage&Sprinkler Credits Area Modifications (ca/c.) BC-506 74 Height Modifications BC-504 . 73 12. Height&Area Summary: . Ht/Area Ht/Area Tabular Area BC-Table 503 72 Frontage Credit BC-506 74 Sprinkler Credit BC-506.3 75 Total Allowable Area Max Aggregate Area BC-503.3 73 (Allowable Area/Fir. x No. of Stories up to 3 maximum) 13. Fire Apparatus Road FC-503.1 29 (150'rule) R Fe S®E,S� 31 14. Exterior Walls Distance Separation* BC-Table 602 .82 Exterior Wall Openings BC-Table 704.8 87 Parapets BC-704.11 88 Exterior Wall Coverings' BC-Table 1405.2 257 Exterior Wall Finishes BC-Table 1406.2 261 Combustible * Distance separations are doubled if fire fighting water is not available (FC-508.1.3). NOTES; JAM Page 2 of 10 No. Topic Code Page Required Actual Section No. or Allowed 15. Fire Rated Construction Incidental Use Areas BC-Table 302.1.1 17 Accessory Occupancy BC-302.2 18 Mixed Occupancy BC-Table 302.3.3 19 Control Areas BC-414.2 52 Fire Walls BC-705 89 Fire Barrier BC-706 91 Shaft Enclosure BC-707 92 Fire Partition (Tenant Sep.) BC-708 95 Smoke Barriers BC-709 96 Opening Protectives BC Table 714.2 101 Fire Blocking BC-716 107 Draft Stopping BC-716.3 108 16. Space 4& Min. Rm. Dimensions '��° � BC-1207.1 251 Min. Ceiling Height BC-1207.2 251, 17. Ventilation (Nat. or Mech.) BC-1202.1 249 18. Light(Nat. orlMech.) BC-1204.1 250 19. Exits fc(em0tel�ejW `BL 1o0q.�.z•1 A10 Occupancy Load BC Table 1003.2.2.2 201 One Exit Permitted BC Tablel005.2.2 224 Stair Enclosure BC-1005.3.2 224 Emergency Egress BC-1009.1 235 Distance of Travel BC-Table 1.004.2.4 . 220 Aisle Width BC-1004.3-1.1 221 Corridor Width BC-1004.3.2.2 221 Capacity of Exits (calc.)_ BC-Table 1003.2.3 202 Corridor Wall Fire Rating BC-Tablel004.3.2.1 222 Corridor Dead End BC-1004.3.2.3 222 Door Width BC-1003.3.1.1 208 Door Swing BC-1003.3.1.2 208 Panic Hardware BC-1003.3.1.9 213 20. Stairs Riser BC-1003.3.3.3 213 Tread BC-1003.3.3.3 213 Width BC-1003.3.3.1 213 Headroom BC-1003.3.3.2 213 Vertical Rise BC-1003.3.3.E 215 Handrails BC-1003.3.3.11 215 (vws bC /w3;3,2 /'- 1 1 zd Mcu ifiise 12'wsK LL�d' s �C /aG3.3,3� zrs JAM Page 3 of 10 No Topic Code Page Required Actual Section No. or Allowed 21. Structural f� Snovp�oading—Ground BC Fig 1608.2 296 CA Snow Loading—Roof(calc.) ASCE-7-98 Drifting Snow BC-1608.7 295 Ponding BC-1608.3.5 295 Floor Loading BC Table 1607.1 291 Balcony Loading BC-Table 1607.1 291 Wind Loading (calc.) BC-1609 297 Roof Walls Windows Seismic Loading (calc.) BC-1614 . 315 Foundation Depth BC-1805.2 398 22. Interior Finishes BC-Table 803.4 161 �iae 23. Swimming Pools BC-3109 629 24. Sun Rooms BC Appendix 1 693 R 25. . Electrical Exit Lights or Signs BC-1003.2.10 203 Emergency Lights BC-1003.2.11.2 204 Emergency Power BC-2702 611 General Lighting-Exits-Stairs BC-1003.2.11 204 26. HC ACCESS Exempt Buildings BC-1104.4 238 Parking BC-Table 1106.1 239 Route BCA 104.1 . 238 Entrance BC-1105.1 239 #of Sleeping Rooms BC-Table-1'107.6.1.1 241 #of Dwelling Units BC-1107.6.2 241 Pro Toilet Facilities BC-1109.2 244 Service Counters BC-1109.12.3 246 Areas of Refuge BC-1003.2.13.5 207 Signage Supplemental HC Req'mts Appendix E 681 ([Notes: 7. SPECIAL INSPECTIONS BC-1704 379 JAM Page 4 of 10 No. Topic Code Page Required Actual Section No. or Allowed 28. Fire Protection Equipment Central Station Monitoring FC-901.9 52 Sprinkler Systems FC-903 55 Other Extingushing Syst. FC-904 59 Kitchen Hood Extinguisher FC-609.8 41 Standpipe Systems FC-905 62 Fire Extingushers FC-906 64 Fire Alarm Systems & SD FC-907.2 66 Fire Alarm Boxes+Z Wef FC-907.4.1 907.9 72;73 Smoke Detection FC-907.2.10 68 Hi-Rise Fire Safety FC-907.2.12 69 Visible Alarms FC-Table 907.10.1.2 73 Smoke Control FC-909 75 Smoke Vents FC-910 82 Fire Pumps FC-913 . 85 29. Plumbing Code Fixture Count PC-Table 403.1 21 S-k Water Supply Service Pipe Size PC-603 33 Fixture Pipe Size PC-603.1 33 Pipe Material PC-Table 605.4 36 Labor Law Art. 10-A UFPBC-904.6 12,340 Pipe Insulation See Energy Code Backflow Prevention PC-Table 608.1 41 Sprinkler System PC-608.16.4 44 Lawn Irrigation PC-608.16.5 44 Pipe Freezing PC-305.6 14 Sanitary Drainage Drain Pipe Size PC-Table 709.1 54 Drain Pipe Material PC-702 47 Labor Law Art. 10--A UFPBC-904.6 12,340 Vent.Size PC-Table 910.4 63 Pipe Hangers PC-Table 308.5 17 Air Admittance Valves PC-917 67 Notes: / /c°�c✓l c✓_ �d� .V '/•�I�ar�.c/� (/tol'rh JAM Page 5 of 10 No. Topic Code Page Required Actual Section No. or Allowed 30. Mechanical Code Ventilation Rates MC-Table 403.3 24 Propane Below Grade MC-502.8.10.1 31 Dryer Exhaust MC-504 33 Kitchen Exhaust MC-506 34 Kitchen Hoods MC-507 37 Kitchen Make-Up Air MC-508 39 Chimney Termination MC-Table 511.2 41 Air Plenums MC-602 47 Fire& Smoke Dampers MC-607.5.1 52 Combustion Air MC-701 55 Confined Spaces—Def. MC-202 5 31. Fuel Gas Code Appliance Location FGC-303 18 Combustion Air FGC-304 19 Clearance to Combust. FGC-Table 308.2 25 Pipe Material FGC-403 46 Shut Off Valves FGC-409 53 Chimney Termination FGC-Fig. 503.5.4 63 Gas Vent Termination FGC-Fig. 503.6.6 65 Exit Terminal Location FGC-503.8 68 Clothes Dryer Exhaust FGC-613 96 Unvented Room Heaters FGC-620 99 ._ :D) 32: Energy Code Prescriptive Method ECCC-Table 602.1(1) 50 High Truss Credit ECCC-602.1.2 51 Pipe Insulation—Heating ECCC-Table 503.3.3.1 44 Duct Insulation—Heating ECCC-Table 503.3.3.3 45 Pipe Insulation—Hot Water ECCC-Table 504.2 47 HWH Heat Trap ECCC-504.7 . 47 COMcheck Computer Software Compliance Report Required Notes: J2,7,lJ l T-.r-z- + SNOW Sif►ie �hg'7 JAM 'JD j' Page 6 of 10 5 T lark Engineering &_Surveying, ,-,;518 '7.66 5663; Mar• 15-04 '.,5 05PM Pa e 1 Y - - ff' FMS FaDl To: Curt Dybas From--. Jeffrey A. Bak,P.E. Of: Crandell Associates ire: Structural Calculations Fax: (515)793-0214 Project: Glens Falls National Bank Date: 15 March 2004 Pages: 15 Pages including cover sheet • Comments Curt, Attached are structural calculations for the portions of the structure we discussed. (Iflhe-Bu l"diriz ector has any questions or needs anyfliing else just ask,-or he can always-calI-me directl Jeffy - . FILE COnV File: G:1YrojectsN2860401\Documents128404'01-07_Doc I I 20 Shaker Road - P.O. Box 730, New Lebanon:N.Y. 12125 J . ;Sent by: UlarK Engineering & Surveying, ; 51.:8 766 5663; Mar=15=04 5t06PM Fage' 2: Snow Load.Calculations Project Name: Glens Falls National Bank Project Number: 2860401 1608.1 -General Design Loads are per ASCE 7-02 1608.2-Ground Snow Load, Pg (psf) `r:85 psf Taken from Figure 1608.2 Ground Snow Loads for NYS 1608.3 -Flat Roof Snow Load, Pf(psfl (Use for roofs having a slope<= 1 in/ft) 11303.1 Exposure factor, Ce Terrain Category-Taken from 1609.4 (Use either Category 8 or C) B=Suburban Areas, C=Open Terrain Ce: 1.0 Exposure Factor-Taken from Table 1608.3.1 Snow Exposure Factor (Assumes structure is partially exposed) 1603.2 Thermal Factor,-Ct Ct: :'ltf ;';` `Thermal Factor-Taken from Table 1609.3.2 (Assumes a heated "standard"insulated and heated strucuture) 1603.3 Snow Load Importance Factor Is: f`t .>y_ Snow Load Importance Factor-Taken from Table 1604.5 (Assumes building category= I ) 1603.4 Rain-On-Snow Surcharge Load (Does not apply when Pf>(Is x Pg) 1603.5 Ponding Instability (Applies to flat roofs with pitch < 1/4"/ft) in= 59.5 , psf JPf=0.7"Pg*Ce*Ct*Is 1608.4-Sloped Roof Snow Load, Ps(psf) (Use for roofs having.a slope> 1 in/ft) (Determine in accordance with Section 7.4 of ASCE 7-02) Roof slope lI 3$ on 12= 71.6 degrees Slope Factor-Taken from figure 7-2 in ACSE 7-02 (Assumes roof structure is not slippery) Ps= 0.0 , psf Ips =Pf*Cs Ps is applied to the horizontal projection of the sloped structure Ps perp = 0 , psf along sloped span of rafter Clark Engineering &Surveying, P.C. 3/15/2004 2860401-01,xls m T IT c r w rr 3 4 6 8 12 3 4 6 8 12 3 4 6 8 12 cQ on on on on on on on on on on on on on on on r 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 m m I r 1.0 PC 50 ! 100\ 37.50 15° Cr 0.8 ,; \ � r 0.6 , All All \ All Yr' \ I Other Surf ces \ Other Surfaces \ Other Surfaces Cs 0.4 Unobstructbd Unobstructed \ Unobstructed \ Cr Slippery Surfaces \ . Slippery Surfaces Slippery Surfaces \ rn ,with R.�30" (�.p")for \ rn Unventilated Roofs \ w 0.2 or R>30'(3.1"') for' \ \ Ventilated Roofs �; \ °F-h-ftbtu \ \ ..K-m2/W 0 �l 0 300 60° 900 0 300 600 900 0 300 601) 900 Roof Slope Roof Slope Roof Slope 7-2a:Warm roofs with C1<1.0 7-2b: Cold roofs with C1=1.1 7-2c: Cold roofs with C1=1.2 rn FIGURE 7-2 GRAPHS FOR DETERMINING ROOF SLOPE FACTOR C,FOR WARM AND COLD ROOFS(SEE TABLE 7-3 FOR C1 DEFINITIONS) D /_ n _...__._...._.__ _° mW....._......_.._............. o � m N z419 4, t6lfi' I<Jwwl,-� go am� Z x "VO --t-7 Irn U- U 67 C51, ........ ... -7Ve-Y-PLL-V�� 9449 PQ I Q LQ '6b-r-A9Ajnq 6utj9eut6u=v_)qj8TI) :Fa ivac Zent By: Clark Engineering & Surveying, ; 518 766 5663; Mar-15-04 5:07PM;..:, Page 5.. _ Project Name: Glens Falls National Bank Date: 15.March, 2004 Project Number: 2860401 Calculated by JAB Material Proncrtics U.N.O. Beam.Description: :1 — ir— sT�-t c ,htiP4;7 F ,-r -Vj.rr--.+4w framing Lumber:No.]/No.2 SPF LVIs:F=2,000 ksi,Pb=2,900 psi Special Conditions: W and M Shapes A992,Fb=50ksi All Other Steel Shapes A36:Fb=36 ksi Span: /i�5; ft Tributary Length: ft E Loads: Live/ Snow 60 PSF, Wli,e= Plf, = i9,4fi Klf Dead PSF, Wdead= < Plf, = Klf Const PSF, Wc,ii51= Plf, = Klf Sketch: Use: U)tOK?5 Rends: kips A max D, 9 in, L/ i R Ieit R right r r - I u i i Y i u i n u n .Sent By, Clark Engineering & Surveying, ; 518 766 5663; Mar-15.-04 5:07P.M, Page.6--. Title: Glens Falls National Bank Job#2860401 Dsgnr: JAB Date: 1:40PM, 15 MAR 04 Description:Building Addition and Facade Replacement Scope: Structural Design Rev: 'E0100 User.KW-0602990.Ver 5.6.1 25-Oct-2002 Page 1 (c)1983-2002 ENERCALC Engineering Software Steed Beam Design 9 9 g:lprojec1s12860401Wructure12 8604 01-01.enr. Description B1 -entry canopy Gentaral Information Calculations are designed to AISC 9th Edition ASD and 1997 UBC Requirements Steel Section : W10X15 Fy 50.00ksi Pinned-Pinned Load Duration Factor 1.00 Center Span 15.00 ft Bm Wt.Added to Loads Elastic Modulus 29,000.Oksi Left Cant. 0.00 ft LL&ST Act Together Right Cant 0.00 ft Lu:Unbraced Length 0.00 ft Distributed Loads #1 '#2 #3 #4 #5 #6 97 DL 0.113 k/ft LL 0.450 k/ft ST k/ft Start Location ft End Location ft .ummary Beam OK Static Load Case Governs Stress Using:W1 OX15 section,Span=15.00ft, Fy=50.Oksi End Fixity= Pinned-Pinned,Lu=O.00ft,LDF=1.000 Actual Allowable Moment 16.256 k-ft 37.933 k-ft Max.Deflection -0.329 in fb:Bending Stress 14.142 ksi 33.000 ksi Length/DL Defl 2.467.3 :1 ih 1 Fb 0.429 1 Lengthl(DL+LL Defl) 546.3 :1 Shear 4.335 k 45.954 k fv:Shear StresE 1-887 ksi 20.000 ksi ...hr!Fv - 0.094 : 1 i Force&Stress Summary «-'These columns are Dead t Live Load placed as noted-» DL LL LL+ST LL LL+ST Maximum Only (�Center (�Center Cants Q Cants Max.M+ 16.26 k-ft 3.60 16.26 k-ft Max.M- k-ft Max:M @ Left k-ft Max.M @ Right k-ft Shear @ Left 4.33 k 0.96 4.33 k Shear @ Right . 4.33 k 0.96 4.33 k Center Defl. -0.329 in . -0.073 -0.329 -0.329 0.000 0.000 in Left Cant Defl 0.000 in 0.000 0.000 0.000 0.000 0.000 in Right Cant Defl 0.000 in 0.000 0.000 0.000 0.000 0.000 in ...Query Defl,@ 0.000 ft 0.000 0.000 0.000 0.000 0.000 in Reaction @ Left 4.33 0.96 4.33 4.33 k Reaction @ Rt 4.33 0.96 4.33 4.33 k Fa calc'd per Eq.E2-1,K'Ur<Cc I Beam Passes Table B5.1,Fb per Eq.F1-1.Fb=0.66 Fy Section Properties W10X15 6 Depth 9.990 in Weight 14.98#Ift r-xx 3.953 in Width 4.000in I-xx 68.90 1n4 r-yy 0.810 in Web Thick 0.230 in I-yy 2.89 in4 Rt 0.990 in Flange Thickness 0.270 in S-xx 13.794 in3 Area 4.41 in2 S-yy 1.445 in3 Sent By, dark Engineering- & -Sur.veying, ; 518 766 5663; Mar-15-04 : 5:O8PM; Hage 7 Project Name: Glens Falls National Bank Date: 15 March, 2004 Proj,,ct Ntimber: 2860401 Calculated by JAB Material Properties U.N.Q. Beam Description: �ji4 i�t /{p, i/FC- ✓� 7� Framing Lumber:No.1/No.2 SPF r,cJrb( LV Ls:E=2,000 ksi,Fb=2,900 psi Special Conditions: W and M Shapes A992,Fb=50 ksi All Other Stccl Shapes A36:Fb=36 ksi Span: �, �� ft Tributary Length: 0%�. ft"' Loads: Live/Snow_j PSF, Wli„e= eZ) Plf, = Klf Deady PSF, Wdead Plf, = Klf Const PSF, Wconst= Plf, = Klf Sketch: Use: Rends �� kips A max O,w in, U R teft R right= i I i Io n ...mi iir./ �' s5ent by: uiarlc tngineer.ing 4 Surveying, ; 518 766, 5663; Mar-15-04 S:UbtIM; Title: Glens Falls National Bank Job#2860401 Dsgnr: JAB Date: 1:40PM, 15 MAR 04 Description:Building Addition and Facade Replacement Scope: Structural Design Rev: °�0100 User:KW-0602990.Ver 5.6.1;25-Oct-2002 Steed Beam Design Page 11 tcy19a3-2002 ENER ea s9n CALC Engineering Software n g:lproiectsl2B60401Lslructure%2860401-01.ecw tns Description 132 -roof beam adjacent to hoistway General Information Calculations are designed to AISC 9th Edition ASD and 1997 UBC Requirements Steel Section : W1OX15 Fy 50.00ksi Pinned-Pinned Load Duration Factor 1.00 Center Span 5.50 ft Bm Wt.Added to Loads Elastic Modulus 29,000.0 ksi Left Cant. 0.00 ft LL&ST Act Together Right Cant 0.00 ft Lu:Unbraced Length 0.00 ft Distributed Loads #1 #2 #3 #4 #5 #ti #7 DL 0.065 k/ft LL 0.260 k/ft ST k/ft Start Location ft End Location ft summary -- Beam K Static Load Case Governs Stress Using:W10X15 section,Span=5.50ft, Fy=50.Oksi End Fixity= Pinned-Pinned, Lu,=0.00ft,LDF=1.000 Actual Allowable Moment 1.286 k-ft 37-933 k-ft Max.'Deflectidn -0.004 in fb:Bending Stress 1.118-ksi 33.000 ksi fb/Fb 0.034:1 Length/DL Defl 80,086.8 : 1 Lengthl(DL+LL Defl) 18,840.2 : 1 Shear 0.935 k 45.954 k fv:Shear Stress 0.407 ksi 20.000 ksi fv 1 Fv 0.020 :1 Force&Stress Summary «_These columns are Dead+Live Load placed as noted -» DL LL LL+ST• LL LL#ST Maximum Only Center Ca)Center Cants Cants Max. M+ 1.29 k-ft 0.30 1.29 k-ft Max.M- k-ft Max.M @ Left k-ft Max.M @ Right k-ft Shear @ Left 0.93 k 0.22 0.93 k Shear @ Right 0.93 k 0.22 0.93 k Center Defl. -0.004 in -0.001 -0.004 -0.004 0.000 0.000 in Left Cant Defl 0.000 in 0.000 0.000 0.000 0.000 0.000 in Right Cant Defl 0-000 in 0.000 0.000 0.000 0.000 0.000 in .--Query Defl @ 0.000 ft 0.000 0.000 0.000 0.000 0.000 in Reaction @ Left 0.93 0.22 0.93 0.93 k Reaction @ Rt 0.93 0.22 0.93 0.93 k Fa caldd per Eq.E2-1,K`Ur<Cc I Beam Passes Table 85.1,Fb per Eq.F1-1,Fb=0.66 Fy Section Properties W90X75 Depth 9.990 in Weight 14.98#/ft r-xx 3.953 in Width 4.000in I-xx 68.90 in4 r-yy 0.810 in Web Thick 0.230 in I-yy 2.89 in4 Rt 0.990 in Flange Thickness 0.270 in S-xx 13.794 In3 Area 4.41 in2 S-yy 1.445 in3 :Sent By.: Clark Engineering & Surveying, ; 518 766 5663; Mar715-04 .-5 09PM; Page,,9/1.8 Project Name:'Glens Falls National Bank Date: 15 March, 2004 Project Number: 2860401 Calculated by JAB Material Properties U.N.O- �-rd fti �rwkY 1 Beam Description:—-���GJ � ®� �T Framing Lumber:No.1RJo.2 SPf= LVLs:E=2,000 ksi,Fb=2,900 psi Special Conditions: w and M Shapes A992,Fb=50 ksi Span: %D" ft '_ -l=Ui All Other Steel Shapes A36:Fb=36 ksi Tributary Length: ft Loads: Live/ Snow__e��PSF, Wli„e= _0 Plf. = Klf Dead_ PSF, Wdead= -ze!9 PI = Klf Const PSF, Wconst= PIE = Klf Sketch: Use: R-end.: 9)L1'Z kips mar DG in, L/-�iS Uht a94 '�' le5l ��-rr�c R left j b R right= kr .4 114- F u llr � r 3 II I �i Y II I �I II j 1 II 1 II Sent by: LUarK engineering rk Surveying, ; aid Intl bUb3; Mar-15-04 5,:09PM;.: - Page -10/18 p . Title: Glens Falls National Bank Job#2860401 Dsgnr: JAB Date: 1:40PM, 15 MAR 04 Description:Building Addition and Facade Replacement Scope: Structural Design LLRe ,60100o299o,Ver5.6.1,25Oc1-2002Steel Beam Design Page 1 .1-2002 ENERCALC Engineering Software - g:lprojects12 8 6 0 4 011,stnidure12860401-Ot.ecw: Description B3-hoistway rafters General Information Calculations are designed to AISC 9th Edition.ASD and 1997 11BC Requirements Steel Section : CUSA Fy 33.00ksi Pinned-Pinned Load Duration Factor 1.00 Center Span 6.00 it Bm Wt.Added to Loads Elastic Modulus 29,000.0 ksi Left Cant. 0.00 it LL&ST Act Together Right Cant 0.00 ft Lu:Unbraced Length 0.00 ft Distributed Loads #1 #2 #3 #4 #5 #6M #7- DL 0.020 k/ft LL 0.080 k/ft ST k/ft Start Location ft End Location, ft mono __Summary ry Beam OK Static Load Case Governs Stress Jsing:C4X5.4 section,Span=6.00ft, Fy=33.0ksi End Fixity= Pinned-Pinned,Lu=0.00ft,LDF=1.000 Actual Allowable Moment 0.474 k-ft 3.176 k-ft Max.Deflection -0.028 in fb:Bending Stress 2.957 ksi 19.800 ksi Length/DL Deft 10,853.5: 1 fb/Fb 0.149 :1 Length/(DL+LL Dell) 2,615.6: 1 Shear 0.316 k 9.715 k fv:Shear Sires; 0.430 ksi 13.200 ksi ' fv I Fv 0.033 :1 - Force&Stress Summary «-These columns are Dead+Live Load placed as noted�» DL LL LL+ST LL LL+ST Maximum Only Cod Center Center Q Cants Cants Max.M+ 0.47 k-ft 0.11 0.47 k-ft Max.M- k-ft Max.M @ Left k-ft Max.M @ Right k-ft Shear @ Left 0.32 k 0.08 0.32 k Shear @ Right 0.32 k 0.08 0.32 k Center Defl, -0.028 in -0.007 -0.028 -0.028 0.000 0.000 in Left Cant Defl 0.000in 0.000 0.000 0.000 0.000 0.000 in Right Cant Defl 0.000 in 0.000 0.000 0.000 0.000 0.000 in ...Query Defl @ 0.000 ft 0.000 0.000 0.000 0.000 0.000 in Reaction @ Left 0.32 0.08 0.32 0.32 k Reaction @ Rt 0.32 0.08 0.32 0.32 k Fa calc'd per Eq.E2-1,K`Ur<Cc I Beam Passes Table 85.1,Fb per Eq.F1-1,Fb=0.66 Fy Section Properties C4X5.4 Depth 4.000 in Weight 5.40#/ft r-xx 1.556 in Width 1.584in I-xx 3.85in4 r-yy 0.448 in Web Thick 0.184 in I-yy 0.32 in4 Flange Thickness 0.296 in S-xx 1.925 in3 Area 1.59 in2 S-yy 0.283 in3 Sent By; Clark Engineering &. Surveying, ; 51.8 766.5663_ ... ;:Mar-15-04 5:10PM Page 11%18 - $5.00 i SM ss WWWE"SSMA.COM STEEL STUD MANUFACTURERS ASSOCIATION ICBO ER-4943P PRODUCT TECHNICAL INFORMATION dent by: ulartc tngine,ering tk surveying, , 51t3 !66 5663, Mar 1b.-U4 5 1UN.M; rage 12/,18 Ralenrs (Screws and Welds) e Screw Table Notes S 1. Screw spacing and edge distance shall not be less than 3 x d. (d = Nominal screw diameter) 2. The allowable loads are based on the steel properties of the members being connected, per AISI section E4. 3. When connecting materials of different steel thicknesses or tensile strength (Fu),the lowest applicable values shOL:ld be used. 4. The,nominal strength of the screw must be at least 3.75 times the allowable loads. 5. Values include a 3.0 factor of safety. 6. Applied loads may be multiplied by 0.75 for seismic or wind loading, per AISI A 5.1.3. 7. Penetration of screws through joined materials should not be less than 3 exposed threads. Screws should be installed and tightened in accordance with screw manufacturer's recommendations. Allowable-Loads for Screw Connections (lbslscrew) :':::<�::,'.: t,•.� No;]2::�Y`�.:� _ ..No.70,:,"�.�;, 3•r y No.8:;r.�,,: ���::; No.6r;::,;r. Steel Thickness Steel Properties164(in), Mils Desi n in F ksi Fu ksl Shear, .Pullout Shear Pullout Shear . Pullout Shear Pullout 18 0.0188 33 45 66 39 60 33 27 0.0283 33 45 121 59 111 50 30 0,0312 33' 45 151 76 141 65 129 55 33 0.0346 33 45 177 84 164 72 151 61 43 0.0451 33. 45 280 124 263 109 244 94 224, 79 54 0.0566 33 45 394 156 370 137 344 118 68 0.0713 33 45 557 196 523 173 Weld Table Notes 1. Weld capacities based on AISI section E2 2. When connecting materials of different steel thicknesses or tensile strength (F„), the lowest applicable values should be used. 3. Values include a 2.5 factor of safety. 4. Based on the minimum allowance load for fillet or flare groove welds, longitudinal or transverse loads. 5. Allm-vable,loads based on E60xx electrodes. 6_ For material less than or equal to .1242"thick, drawings show nominal weld size. For such material, the effective throat of the weld shall not be less than the thickness of the thinnest connected part. Allowable Loads for Fillet Welds and Flare Groove Welds Steel Thickness Steel Properties Nominal Allowable NIi1s Desi n in F ksi Fu ksi Weld Size Load= 43 0.0451 33 45 1/16 609 54 0.0566 33 45 3/32 764 68 0.0713 33 45 118 963 97 0.1017 33 45 118 1373 118 0.12a2 33 45 1/8 1677 54 0.0566 50 65 3/32 1104 68 0.0713 50 65 V8 1390 97 0.1017 50 65 118 1983 118 0.1242 50 65 118 2422 NOR :Sent By-: ,Clark Engineering & Surveying, . ; 518.766 -5663; Mar-15-04 '. 5:11PM; Page 13/18 Zipc(*Lookup'Oiitput! Pa e 1 of l SGS hquake HazardsIi , The input zip-code is 12804. ZIP CODE 12804 LOCATION 43.3255 Lat. -73.6796 Long_ DISTANCE TO NEAREST GRID POINT 3.2808 kms NEAREST GRID POINT 43.3 Lat. -73.7 Long. Probabilistic ground motion values, in %g, at the Nearest Grid point are: 10%PE in 50 yr 5%PE in 50 yr 2%PE in 50 yr PGA 5.176282. 8.774051 16.376780 0.2 sec SA 12.019770 18.701521 33 .675381 0.3 sec $A 9.772255 15.439970 26.348040 1.0 sec SA 3 .709113 5.905818 1 9.986787 The input zip-code is . Zip code is zero and we go to the end and stop. PR0JH;"I'INFO:Home Page SEISMIC HAZARD:Hazard by Lip Code c Sent By: Clark Engineering & Surveying; 518 766 5663; Mar`15-04 5:11PM; Page, 14/18; Se*!,-cmic Design Parameters Project Name: Glens Falls National Bank Project Number: 2860401 1615.1.2 -Adjusted Maximum Spectral Response Acceleration Site Classification: D Using Tables 1615.1.2(1)and 1615.1.2(2) Ss = ,:a8 S1 = aoeig Fa(l) i< shs k 0.25 Fv(1) `HI"34lM 0.00 Fa(2) �F 0.50 Fv(2) �, 24 0.10 Fa = 1.53 Fa= 2.40 Sms= Fa(Ss)= 0.5155 Sm1 = Fv(S1)= 0.2398 1615.1.3 -Design Spectral Response Acceleration ,ads= 213 Sms= 0.3437 Sd1 = 2/3 Sm1 = 0.1599 1616.2-Seismic Use Group (from Table 1604.5) Category 1616.2-Seismic Design Category Based on Short Period Acceleration Design Category is: C Based on 1 Second Period Acceleration Design Category is: C Design Category is: C Clark Engineering&Surveying, P.C. 3/1512004 2860401-02.xis ;Sent By: Clark Engineering & Surveying, ; 518 766 5663; Mar-15-04 5:12PM; Page 15/18 Project Name: Glens Falls National Bank Date: 15 March, 2004 Project Number: 2860401 Calculated by JAB Material Properties- UN--Beam Description: gaming Lumber:No.1/No.2 SPF LV Ls:E=2,000 ksi,A=2,900 psi Spec:al Conditions: W and M Shapes A992,Fb=50 ksi All Other Steel Shapes A36:Fb=36 ksi Span: ft Tributary Length: ft Loads: Live/Snow PSF, Wli„e= Plf, = KIf Dead PSF, Wdead= Plf, = Klf Const PSF, We onst= Plf, = Klf Sketch: Use: Rcnds: kips A Max in, U R left R right= I / t ` - 1 II I ,Sent By: C1ari< Engineering a Surveying, ; bits. ttjt7 bbb;:l; Mar-15 04 ; 5:12f'M, jjage i,tj/1 u Combined Axial and Lateral Load Tables 25 •sf Lateral_ • ad Walt Spacing 6 6005162-(m 00S737-(mils) is)_ '60 .(Mils _ •7';s` Height /'in\ ,:F .S'� •• SU'�sj :,_ ��:�•` ksl. - -'� �/�ksi:`�'�'L7'��a .�.��,y.Y��(� � ��y '��_, 9 l '1 •a1^+... r4:• .f i�i;• +�+.. SFn'�vT:�- _�.. ):.`Ti.°t! .?S'7.!..{.�.*i:;�..! i!GCa�:�%s:'..HG :f-C:.�.7�nf.+^G4�:7C�aa yes ..i �t,�- ft) O.c. 33 43 54 68 97 33 43 54 '•,68 97' '33 43 54 68 97 8 12 1.88 2.62 3.90 5.14 7.62 2.55 3.52 5.72 7.56 11.50 2.99 4.44 7.56 10.02 15.60 16 1.88 2.62 190 5.14 7.62 2.55 3.52 5.72 7.56 11.50 2.99 4.44 7.56 10.02 15.60 24 1.57 2.59 3.90 5.14 7.62 2.27 3.52 5.72 7.56 11.50 2.74 4.44 7.56 10.02 15.60 9 12 1.88 2.62 3.90 5.14 7.62 2.55 3.52 5.72 7.56 11.50 2.97 4-40 7:46 9.89 15.38 16 1.71 2.62 3.90 5.14 7.62 2.42 3.52 5.72 7.56 11.50 2.90 4.40 7.46 9.89 15.38 24 1.321 2.34 3.90 5.14 7.62 1.96 3.30 5.72 7.56 11.50 2.38 4.18 7.46 9.89 15.38 10 12 1.75 2.62 3.90 5.14 7.62 2.47 3.52 5.72 7.56 11.50 2.93 4.35 7.33 9.72 15.11 16 1.51 2.53 3.90 5.14 7.62 2.18 3.52 5.72 7.56 11.50 2.61 4.35 7.33 9.72 15.11 24 1.046 2.071 3.90 5.14 7.62 1.616 2.96 5.72 7.56 11.50 1.997 3.72 7.33 9.72 15.11 12 12 1,416 2.41 3.90 5.14 7.62 2.007 3.3 5.60 7-52 11.50 2.40 4.08 6.99 9.27 14.40 16 1.076 2.081 3.907 5.14 7.62 1.60 6 .90 5..0 7.52 11.50 1.976 3.60 6.99 9.27 14.40 24 0.433 1.441 3.426 5.01 6 7.62 0.85 3 2.14 6 4.86 a 7.441 11-50 1.146 2.706 6.257 9.27 14.40 14 12 1.0111 2.006 3.89 6 5.141 7.62 1.476 2.71 6 5.24 T 7.13 11-28 1.816 3.337 6.55 8.68 13.45 16 0.583 1.563 3.496 5.05 a 7.62 0.983 2.205 4.706 7.117 11-28 1.28 3 2.736 5.946 8.687 13.45 24 0.752 2.743 4.2L67.62 =0.93 1.273 3.70 3 6.086 10.88 6 0.292 1.641 4-78 6 7.701, 13.457 16 12 0.59 2 1.543 . 3.410 4.9 2.07 3 '4.29 6 6.486 10.42 1.213 2.556 5-368 7.97712.32 16 1.01 2 2.92 4.4 1.493 3.67 3 5.83 6 10.20 6 0.60 2 1.87 3 4.64 6 7.28 6 12.32' 2.012' 3.40.45 2 2.552 4.66 3 -8.76 6 0.65 2' 3.36 3 5.973 10.93 6 25 )sf Lateral Load wan Spacing B00S137-(mils) - 800S162=(mils) 800S200-(mils). .Height In. _ `_�. fCSI:.� _ 1.. '; -u,s ...-- - y„Y- C )- Fug t �:„r4. s;.. A 391cs1�s ` _y .50 hsi y w' 50 : �.:.x;-_ 'r::...�._. `�:i-� .s,3t.�a �...a.. •ram, -. ..,-. .Y� ft O.C. 33 . 43 n 54 68 �•�97 33 43 54 ,•F 68 97 33 ' 43 54 68 97 8 12 1.79 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3.07 4.58 7.85 10.38 16.07 16 1.79 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3.07 . 4.58 7.85 10.38 16.07 24 1.71 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3.07 4.58 7.85 10.38 16.07 9 12 1.79 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3.07 4.58 7.85 10.38 16.07 16 1.79 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3-07 4.58 7.85 10.38 16-07 24 1.53 2.50 3.62 4.80 7.27 2.27 3.44 5.51 7.32 11.33 2.88 4.58 7.85 10.38 16.07 10 12 1.79 2.50 3.62 4.80 7.27 2.49 3.44 5.51 7.32 11.33 3.07 4.58 7.85 10.38 16.07 16 1.68 2.50 3.62 4.80 7.27 2.44 3.44 5.51 7.32 11.33 3.07 4.58 7.85 10.38 16.07 24 1.33.. 2.38 3.62 4.80 7.27 2.02 3.40 5.51 7.32 11.33 2.59 4.58 7.85 10.38 16.07 12 12 1-61 2.50 3.62 4.80 7.27 2.36 3.44 5.51 7.32 11.33 2.98 4.58 7.85 10.38 16.07 16 1.36 2.40 3.62 4.80 7.27 2.05 3.42 5.51 7.32 11.33 2.62 4.58 7.85 10.38 16.07 24 0.87 6 1.95 3.62 4.86 7.27 1.451 2.86 5.51 7.32 11.33 1.92 4.01 7.85 10.38 16.07 14 12 1.32 2.36 3.62 4.80 7.27 2.00 3.37 5.51 7.32 11.33 2.53 4.51 7.70 10.25 16.07 16 0.996 2.05 3.62 4.80 7.27 1.587 2.98 5.51 7.32 11.33 2.057 4.09 7.70 10.25 16.07 24 0.345 1.45' 3.281 4.80 7.27 0.796 2.231 5.16 T 7.32 11.33 1.15 6 3.197 7.27 10.25 16.07 16 12 1.00 6 2.057 3.62 4.80 7.27 1.596 2.977 5.51 7.32 11.33 2.021 3-97 7.41 9.87 15.52 16 0.585 -1.65 c 3.436 4.80 7.27 1.075 2.471 5.347 7.32 11.33 1.44 6 3.397 7.24 9.87 15.52 24 9 3 0.8 2.78 a 4.47 6 7.27' 1.53 3 4.43 6 ,6.93 6 11.33 0.353 2.29 6 . 6-06 6 9.537 15.52 1 psf Lateral • . • Haight Spa ) S162(mil .362S137(mil c i. 2S162-(mils) .U S200-(mils h -�.� ..-..+-3 Zia: -. .1.;�.-. Y, .�`_ tx�l^•.- S;u. i'S2S '.f Y�!- 3 � ) ref:.. + '.�...:.. ...INM C . 33 .43 .54 ~' 68 ' 33 43 54 68 33- 43' -54 68 33 .43 54 • 68 E. 12 1.496 2.51 T 4.09 5.14 1.166 2.047 3.42 4.42 1.591 2.64 4.27 5.44 2.00 T 3.30 5.34 6.76 16 1.146 2.156 3.96 7 5.14 0.855 1.726 3.366 4.427 1.246 2.306 4.221 5.44 1.611 2.89 T 5.34 6.76 24 0.493 1.503 3.316 4.876 0.263 1.133 2.826 4.106 0.593 1.646 3.576 5.256 0.893 2.116 4.626 6.76T c, 12 1.136 2.099 3.71 6 4-80' 0.863 1.706 3.21 6 4.197 1.236 2.241 3.997 5.12 1.605 2.801 5.02 6.32 16 0.733 1.683 3.31 6 4'73 6 0.50 3 1.323 2.876 4.066 0.833 1.83' 3.596 5.126 1.153 2.31 6 4.5913 6.327 24 0.947 2.58 3 4.023 0.642 2.253 3.41 3 0.11 2 1.081 2.843 4.406 0.332 1.43 3 3.711 5.706 1 J 12 0.783 1.683 3.11 6 4.40'- 0.56 3 1.35 3 2.746 3.836 0.883 1.82' 3.405 4.75 6 1.20' 2.29' 4.32 6 5.85 T 16 0.352 1.233 2.67 3 3.98' 0.17 2 0.93 3 2.363 3.44' 0.44 2 1.373 2.953 4.368 0.703 1.751 3.79 6 5.57 6 24 0.42 2 1.89' 3.21 3 0.192 1.68 2 2.723 0.55 T 2.14 2 3.563 0.79 2 2.85 3 4.67' 12 12 0.182 0.912 2.033 3.072 0.692 1.842 2.703 0.262 1.042 2.273 3.403 0.472 1.343 2.92' 4.346 16 0.43 2 1.57 2 2.61 2 0.23 2 1.43 2 2.27 2 0.54 2 1.792 2.923 0,75 2 2.362 3.803 24 0.77 2 1.82 2 0.71 ' 1.512 0.942 2.082 1.38 2 2.85 2 14 12 0.322 1.222 2.052 0.16' 1.132 1.792 0.422 1.402 2.302 0.582 1.842 2.983 16 0.7V 1.612 0.73' 1.372 0.932 1.932 1.30'- 2.462 24 0.84' 0.62' 0.12' 1.02' 0.37, 1.542 13 12 0.65' 1.322 0.61 ' 1.13' 0.77' 1.502 1.072 2.01= 16 0.24' 0.90' 0.23' 0.72E 0.34' 1.06' 0.57' 1.51, 24 0.18' 0.29' 0.65' 1 Deflection exceeds U120 6 Deflection exceeds U600 2 Deflection exceeds U240 7 Deflection exceeds 1-1720 3 Deflection exceeds U360 - if nol noted.deflection is less than L 720 See Combined Axial and Lateral Load Table Notes on page 20. ��\��, 25 Sent By: ClarK Engineering. & Surveying; ,; 518 766 5663; Mar-15-04 5:13PM.;. Page 17/18 Project Name: Glens Falls National Bank Date: 15 March, 2004 Project Number: 2860401 Calculated by JAB Material Properties U.N.O. Beant Desciription: Framing Lumber:No.I/No.2 SPF LV Ls:E=2,000 ksi,Fb=2,900 psi Special Conditions: W and M Shapes A992,Fb=50 ksi All Other Steel Shapes A36:Fb=36 ksi Span: _ ft Tribtitary Length: ft Loath: Live/ Snow PSF, Wli,,= Plf, = Klf Dead PSF, Wdead= Plf, = Klf Const PSF, Wconst= Pif, = Klf Sketch: Use: Rends- kips A max in, L/ R IeR R right= NI I _ I JCII L. Oy.. L+1C11 n GIIy1:IIVUI--U1y a Oul-vuyilly, alo /ob ObbJ; Mar'-1`J-U4 5:141'M; NagE'"_7-ti'/ltf Powder Actuated Fastening Systems DX Fastener Technical Data 3.2.3 3.2.3.1 Technical Data Allowable Loads in Normal Weight Concrete Shank Min. 2000 psi 3000 psi 4000 psi 6"psi Cescription Fastener Type Diameter Embedment (13.8 MPa (20.7 MPa) (27.6 MPa) (41.4 MPa) in.(mm) in.(mm) Tension Shear Tension Shear Tension Shear Tension Shear lb kN Ib Ib kN Ib N Ib(kN) Ib k Ib(kN) Ib(kN) 5/8 _ - - - - - 45 60 16 0.20 0.2 3/4 70 95 90 11 D 110 125 75 95 19 0.31 0.42 0.40 0.48 0.49 0.56 0.33 0.42 Dom( Head Nail X-DNI 0.145 1 90 140 120 160 155 185 130 1% (3.7) 25) 0.40) 0.62 0.53 0.Z1) 0.69 0.82 (0.58 0.87 11/2 165 230 190 280 215 335 38 0.73 0.02 0.85 1.25) 0.96 1.49 314 55 90 70 105 90 125 0,145 19 0.24) 0.40 0.31 0.47 0.40 0.56 Dome Head Nail X-ZF (3.7) 1 80 135 105 155 130 180 0.138 25 0.36 0.60 0.4 0.69 0.58 0.80) (3.5) 1 V4 125 200 150 220 180 260 32) 0.56) 0.89 0.67 0.98 0.80 1.16 3/4 45 105 19 0.20 0.47 - - - - - Flat Head Nail X-CF 0.138 1 75 130 (3.5) 25 0.33) 0.58 - - - - - - 1 V4 120 180 32) 0.53) 0.85 - 3/4 _ _ _ _ -90 '95 75 95 Heavy Duty X-ALH 0.1 T7 19 0.40 0.42 0.33 0.42 DomF.Head Nail (4.5) 1114 _ _ _ _ 300 270 215 265 32 . 1.33 1.20 0.96 1.18 Domu Head Nail DS 0.177 17/16 150 250 205 285 275 330 - (4.5) (3 0.67 1.11 0.91 1.2 1.22 1.47 Domc Head Nail X-ZF22PST 0•138 314 55 90 70 105 90 125 - - 3.5 19 0.24 0.40 0.31 0.4 0.40 0.56 1/4"-20Threaded Stud W6 0.145 11/8 90 160 115 225 145 265 - - (3. 29) 0.40 0.71 0.51 1.00 _65 1.18 ' 3/8"-16 Threaded Stud W10',W10P10K 0.205 11/4 220 390 280 445 345 500 - - (5.2) (32 0.98 1.73 1.25 1.98 (1.53) 2.22 Flathead Track Nail X-CF20THP 0.138 5/B 45 75 - - - - - - (3,5) (16 0.20 0.33 5tainLss Steel Nail X CR 0.145 1 - - 95 200 100 200 105 200 3.7 25 0.42 0.89 0.44 0.89 0.47} 0.89 55 100 Forming Nail SL62 0.145 1 0.24 0.44 - SL44 (3.7) (25) 30 55 0.13 0.24 314 _ _ 70 85 0.138 19 (0.31) 0.38 - - - - Rat Head X-ZF-MX (3.5) 11/4 _ _ 125 150 Nail Magazine 0.145 32 0.56) 0.67 (3.7) 17/n _ _ 140 175 31 0.62 0.7$ 5/B 25 55 45 60 50 60 - - Flat Head Nail X-DW 0.118 (16) (0.11) (0.24) (0.20) (0.27) (0.22) (0.27) (3.0) 3/4 50 70 1 '90 70 90 70 (19) (0.22) (0.31) (0.40) (0.31) (0.40) (0.31) Notes: 1. Values are for fastener only. Attached materials must be investigated separately. 2. Allowable values are calculated using a factor of safety of 8. 3, Multiple fasteners are recommended for any attachment. 03/.15/2004 13:18 518-899-7226 . VMJR COMPANIES. " PAGE 02/02 ` 03/15/2004 11:30 51B3732002 FLOORING UNLIMITED PAGE 02 Product Specifications Page 1 of 1 & C 0 M M E R C Q A• L Monday, March 15, 2004 F COPY Confetti STYLE (261.5) Yarn 100% !Nylon: J&J Encore? SD Ultima? (Minimum of 21%recycled content) Bulked Continuous Filament Dye Method Colorloc? Pius-Solution Dye Technology Surface Texture Dense Patterned Loop Patterning Technique TechnoWeave? li Pattern Repeat N/A Gauge 1110 (3.94 rows/cm) Tufted Stitches Per Inch 8 Yarn Weight 26 oz.lsy(882 grams/m2) Finished Pile Thickness .110 inch (2.79 mm) (ASTM D-418) Density 8,509 Weight Density 221,234 Secondary Backing ActionBec? LTP? Special Treatment(s) ProTex? Fluorochemical Width 12 ft(3-66 m) FlarnmaUlllty Class-1— Smoke Less than 450 flaming Static Generation Less than-3.0 kv (AATCC-134) ADA Compliance Compliant for Accessible Routes Warranties Lifetime Stain Removal Lifetime Colorfastness to Light Lifetime Colorfastness to Atmospheric Contaminants Lifetime Wear Lifetime Static Lifetime Against Delaminaticn Lifetime Against Tuft Bind Failure(edge ravel, yarn pulls, zippering) specifications are based on averages from manufacturing processes and may vary within normal Indusay toferancaa. Such variances do not affect performance. 818 J8J Drive 706.278.4454 P.O.Box 9287 Fax 70ff 275 t433 Dalton.GA 34722-1287 www.jilcommercial.com -- _ -- _ n f1 cI'lnna i 4 y ^S Gold Bond Brand Gypsum Wallboard ti ;.Gold M.- r ® r ► i Gypsum board is the name for a Fire and sound ratings for Examine and inspect materials end joint will align with family of board products building systems utilizing to which gypsum board is to edges of opening unless Gold go consisting of a gypsum wallboard are be applied.Remedy all control joints will be Wallk noncombustible core, dependent on the core type defects prior to installation of installed at these points.End to Hr� primarily of gypsum,with a and thickness of the drywall.Any defects in the joints shall be staggered,and other paper surfacing on the face, wallboard,its application in finished installation due to joints on opposite sides of a back and long edges.* conjunction with the misaligned framing or other partition shall not occur on assen The popularity of gypsum component parts,and the cause will be the the same stud. transl wallboard results from a manner in which it is responsibility of the work Gypsum wallboard shall be asser number of factors. First,it applied. performed under that section held in firm contact with the wallk takes virtually any Tests for fire resistance and of the specification and such framing member while core. defects shall be remedied great decoration—from paint or sound transmission, fasteners are being driven. under that section of the regul textures to vinyl and paper performed by independent specification. Fastening shall proceed from • ". _ �. Gem laminates.It also lends itself laboratories,'have resulted in P center portion of the to creative shaping of specific ratings for walls/ Gypsum wallboard shall be wallboard toward the edges iesis interior surfaces,allowing partitions;floor/ceiling applied first to ceiling at right and ends.Fasteners shall be used the maximum in design assemblies;shaftwalls, angles to framing members, set with the heads slightly " to st flexibility.Gypsum stairwells and area then to walls.Boards of below the surface of the - ; desil wallboard is an economical separation walls;and maximum practical length wallboard in a dimple pros alternative to other products. columns."For maximum fire shall be used so that an formed by the hammer or The gyl Because it is lightweight, it is resistance and sound control, absolute minimum number power screwdriver.Care wall easy to handle for speedy double layer construction is of end joints occur.Board shall be taken to avoid =i natll installation.With its natural generally recommended edges shall be brought into breaking the face paper of _ GYF properties,it is durable yet since the additional mass contact with each other but the wallboard.Improperly easy to repair.In addition, further retards heat and noise shall not be forced into driven nails or screws shall gypsum wallboard's fire penetration. place. be removed. resistance and sound control Gypsum wallboard can be Wallboard joints at openings Seepage 60,Environmental capabilities further installed to both metal and shall be located so that no Conditions and Limitations. demonstrate its desirability wood framing using nails, -,"Accon in building systems. screws or adhesives in star Ever conscious of the combination with nails or CURVED SURFACES wal environmental challenges screws. In many instances, ��,a we face in today's world, the application will dictate To apply wallboard over a curved surface,place a stop at one end of. lea' National Gypsum produces which fastening method is the board and then gently and gradually push on the other end, res its wallboard with 100 appropriate. forcing the centeragaihst the framing until the curve is complete. bo; percent recycled paper on Control joints may be necessary Shorter radii than shown in the table may be obtained by moisten- res both the face and back. to prevent cracking in the Ing the face and back papers of the board with water,stacking on a bo Gold Bond gypsum wallboard gypsum wallboard facingg of flat surface,and allowing the water to soak into the core for at least is available with a variety of drywall systems,es eciall one hour.When the board is dry it will regain its original hardn•_�s" ay Y Y Y P Y lot edge_configurations. For easy in areas where structural Gypsum wallboard may be applied to curved surfaces in accordance m( joint finishing,the tapered elements such as slabs, with the following: ace edge is preferred to provide columns or exterior walls a monolithic surface.Where can bear directly on non- WALLBOARD BENDING RADII re( joints will be exposed, load-bearingpartitions.To Fir I? Thickness Bending Lengthwise Bending Widthwise :; Cc square or beveled edges relieve the stresses which :, M should be considered. occur as a result of 1/4" 6.4 mm 5'-0" 1524 mm 15'-0" 4572 mm de National Gypsum also movement induced by 3/8" 9.4 mm 7 2286 mm 25'-0" 7620 mm manufactures wallboard changes in moisture, 1/2"�12.7 m�) *10'-0" 3048 mm with proprietary edge temperature or both,control configurations made to joints are required in both Bending two layers of 1/4"(6.4 mm)board successively will permit a bending r accommodate a variety of partitions and ceilings. radius shown for 1/4"(6.4 mm)board. wall systems and finishing GYPSUM BOARD Note:To achieve tighter bending radii,use Gold Bond 1/4"High techniques. INSULATING PROPERTIES Flex Wallboard.See page 72 for additional information and 1/4" *GA-201 High Flex minimum bending radii chart. For purposes of calculating ;- "U"values,the"C"factor for SURFACE BURNING.CHARACTERISTICS 1"gypsum board is 1.2; (Fire Hazard Classification)Tested in accordance with ASTM E 84 Resistance"R"for 3/8"board is.32;for 1/2"board.45;for �Gypsum�� Gypsum Durasan 5/8"board.56 and for 1" Wallboard Sheathing All Standard Patterns board.83. Flame Spreadlniiez—`15— 20 25 or less Smoke Developed 0 0 50 or less THE FOLLOWING PARAGRAPHS ARE FOR INSERTION INTO SECTIONS OF GENERIC SPECIFICATIONS OR GENERIC/PROPRIETARY SPECIFICATIONS COVERING GYPSUM WALLBOARD PRODUCTS.THE NATIONAL GYPSUM PRODUCT NAME FOLLOWS THE GENERIC DESCRIPTION IN PARENTHESES. !` PART 2 PRODUCTS 2.01 MATERIALS A.Regular Gypsum Board:A gypsum core board that is fire resistant and surfaced with paper on fronVback and long edges and complies with ASTM C 36/C 1396. 1.Thickness:1/4",3/8",1/2"(Gold Bond Brand Gypsum Wallboard) 3.Length:6'through 16'. z'. 2.Width:41. 4.Edges:Square,Tapered,or Beveled Tapered(Sta-Smooth Edge). _ PART 3 EXECUTION 3.01 INSTALLATION p A.General:In accordance with the manufacturer's recommendations,National Gypsum Company"Gypsum Construction Guide." ®,11 62 NATIONAL GYPSUM WALLBOARD PRODUCTS m Envelope Compliance Report 2000 IECC COMcheck-EZ Software Version 2.3 Release 1 Data filename:Untitled Section 1: Project Information Project Name: Glens Falls National Bank Branch Renovations 696 Glens Street Queensbury,NY 12804 Designer/Contractor: Crandell Associates 5 Grove Avenue Glens Falls,NY 12801 Document Author: Curtis D.Dybas Notes: Project is a 685 S.F. addition and interior alterations to an existing bank facility. The existing lighting will remain except new fixtures will be provided in the addition and alteration areas. The existing heating and air conditioning systems will remain. Section 2: General Information Building Location: Glens Falls,New York Climate Zone: 15 Heating Degree Days(base 65 degrees F): 7377 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Activi, Type(s) Floor Area Bank/Financial Institution 685 Project Description(check one): New Construction X Addition )<Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Air Leakage,Component Certification,and Vapor Retarder Requirements Inspection Approved Initial Date- (Y/1) All joints and penetrations are caulked,gasketed, weather-stripped,or otherwise sealed Windows,doors,and skylights certified as meeting leakage requirements Component R values&U-factors labeled as certified Vapor retarder installed Y Climate-Specific Requirements Gross Cavity Cont. Proposed Budget Component Name/Description Area R-Value R Value U-Factor U-Factor Roof 1:Metal Roof with Thermal Blocks 50 0.0 10.0 0.093 0.052 Roof 2:Non-Wood Joist/Rafter/Truss 100 19.0 0.0 0.058 0.052 Roof 3:Non-Wood Joist/Rafter/Truss 30 38.0 0.0 0.036 0.052 Exterior Wall 1:CMU>8"with Empty Cells,Furring:None 635 --- 10.0 0.078 0.075 Exterior Wall 2:Metal Frame, 16"o.c. 2988 19.0 0.0 0.114 0.075 Basement Wall 1: Solid Concrete or Masonry<=8" Furring:None,Wall Ht 4.0,Depth B.G.4.0 504 --- 10.0 0.088 0.100 Window 1: Metal Frame with Thermal Break,Double Pane with Low-E Tinted,shgc 0.35 288 --- --- 0.340 0.526 Floor 1:Non-Wood Joist/Truss 63 19.0 0.0 0.052 0.043 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. Envelope PASSES: Design 29%better than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2000 IECC requirements in COMcheck-EZ Version 2.3 Release 1. .Principal Envelope Designer-Name Signature Date • T 'a 21 Lighting Compliance Certificate 2000 IECC COMcheck-EZ Software Version 2.3 Release 1 Data filename:Untitled Section 1: Project Information Project Name: Glens Falls National Bank Branch Renovations 696 Glens Street Queensbury,NY 12804 Designer/Contractor: Crandell Associates 5 Grove Avenue Glens Falls,NY 12801 Document Author: Curtis D.Dybas Notes: Project is a 685 S.F. addition and interior alterations to an existing bank facility. The existing lighting will remain except new fixtures will be provided in the addition and alteration areas. The existing heating and air conditioning systems will remain. Section 2: General Information Building Location: Glens Falls,New York Climate Zone: 15 Heating Degree Days(base 65 degrees F): 7377 Cooling Degree Days(base 65 degrees F): 380 Building Use Method of Compliance: Activity Type Method Activity Type(s) Floor Area Bank/Financial Institution 685 Project Description(check one): New Construction _Addition _Alteration _Unconditioned Shell(File Affidavit) Section 3: Requirements Checklist Inspection Approved Initial Date (Y/N) Controls,Switching,and Wiring Independent controls for each space(switch/occupancy sensor) Exceptions: Security lighting,building lobby/retail store/mall Master switch at entry to hotel/motel guest room Two switches,dimmer,or occupancy sensor in each space providing a uniform illumination pattern Exceptions: Only one luminaire in space; An occupant-sensing device controls the area; The area is a corridor,storage,restroom,or lobby Photocell/astronomical time switch on exterior lights Exceptions: Large covered areas requiring lighting during daylight hours =ti - s Tandem wired one-lamp and three-lamp ballasted luminaires Exceptions:, Electronic high-frequency ballasted luminaires not on same switch Interior Lighting Total actual watts must be less than or equal to total allowed watts Allowed Watts Actual Watts Complies(Y/N) 1370 960 YES Exterior Lighting Type(s)of exterior lighting sources: _Fluorescent _Metal Halide _High-Pr. Sodium Exceptions: Specialized signal,directional,and marker lighting;lighting highlighting exterior features of historic buildings; advertising signage;safety or security lighting;low-voltage landscape lighting. Section 4: Compliance Statement The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2000 IECC requirements in COMcheck-EZ Version 2.3 Release 1. Principal Lighting Designer-Name Signature Date Lighting Application Worksheet 2000IECC . COMcheck-EZ Software Version 2.3 Release 1 Section 1: Allowed Lighting Power Calculation A B C D Total Floor Allowed Allowed Area Watts Watts Area Category (Ra watts/ft2 B x C Bank/FinancialInstitution 685 2 1370 Total Allowed Watts= -1370 Section 2: Actual Lighting Power Calculation A B C D E F Fixture .Fixture Description/ Lamps/ #of Fixture ID Lamp Description/Wattage Per Lamp/Ballast Fixture Fixtures Watt. x E 1 48"T8 32W/Electronic 3 10 96 960 Total Actual Watts= 960 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Actual Watts is greater than or equal to zero,the building complies. Total Allowed Watts= 1370 Total Actual Watts= 960 Project Compliance= 410 Lighting PASSES: Design 30%better than code Site Plan Inspection Report Form Name: Glens Falls National Bank ; Location: 696 Upper Glen Street, Queensbury, NY 12804 Site Plan No.: 51-2003 Area Variance No.: 91-2003 Building Permit No. (if any): 2004-072 Date: October 15, 2004 Dear Glens Falls National Bank: During a site plan inspection of your project, the following deficiencies were discovered: 1) Site developed as approved. Good to issue CO. 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) 13) 14) It is my expectation that these items will be addressed by NA. Should you have any questions or comments please contact this office. Sincerely youTr "� Bruce Frank Code Compliance Officer