Town of Queensbury Letter for Building PermitPROGR
Date: Monday 1-18-20
Project: Carey Road Medical Building
Project Team:
Kevin Knobloch (Project Manager), Sherie Fox (Project Administrator) Tony Bonacio,
Rabia
Shinaishin, R.A: .Hyman Hayes Associates (Architects)
[[1200,1275,1245,1368][10][,I,][Arial]]
[[600,1356,900,1470][12][,I,][Times New Roman]] [[900,1356,1200,1470][12][,I,][Times New Roman]] [[1200,1356,1500,1470][12][,I,][Times New Roman]] [[1500,1356,1800,1470][12][,I,][Times
New Roman]] [[1800,1356,2100,1470][12][,I,][Times New Roman]] [[2100,1356,2400,1470][12][,I,][Times New Roman]]
[[2400,1370,2446,1464][10][B,I,][Arial]]
[[600,1466,702,1569][11][B,I,][Times New Roman]]To [[702,1466,883,1569][11][B,I,][Times New Roman]]wn o [[866,1466,937,1569][11][B,I,][Times New Roman]]f [[937,1466,1633,1569][11][B,I,][Times
New Roman]]Queensbury Build [[1627,1466,1773,1569][11][B,I,][Times New Roman]]ing [[1770,1466,2223,1569][11][B,I,][Times New Roman]]Department [[2221,1466,2243,1569][11][B,I,][Times
New Roman]] [[2243,1466,2289,1569][11][B,I,][Times New Roman]]
[[2550,1572,2594,1666][10][,I,][Times New Roman]]
[[2550,1667,2594,1761][10][,I,][Times New Roman]]
[[2550,1763,2594,1857][10][,I,][Times New Roman]]
[[600,1859,752,1953][10][B,I,][Arial]]Dea [[752,1859,808,1953][10][B,I,][Arial]]r [[808,1859,1030,1953][10][B,I,][Arial]]John, [[1030,1859,1053,1953][10][B,I,][Arial]] [[1053,1859,1354,1953][10][B,
I,][Arial]]O’Brien [[1354,1859,1378,1953][10][B,I,][Arial]], [[1378,1859,1424,1953][10][B,I,][Arial]]
[[600,1955,900,2049][10][B,I,][Arial]] [[900,1955,2317,2049][10][B,I,][Arial]]Please see the below information th [[2317,1955,2414,2049][10][B,I,][Arial]]at [[2414,1955,2563,2049][10][B,I,][Arial]]
you [[2562,1955,2585,2049][10][B,I,][Arial]] [[2585,1955,3267,2049][10][B,I,][Arial]]have requested. [[3267,1955,4443,2049][10][B,I,][Arial]]Please reach out to me if you
[[600,2051,817,2145][10][B,I,][Arial]]need [[817,2051,1166,2145][10][B,I,][Arial]]anything [[1164,2051,1187,2145][10][B,I,][Arial]] [[1187,2051,1535,2145][10][B,I,][Arial]]else as
I [[1535,2051,2229,2145][10][B,I,][Arial]]am eager to start [[2229,2051,3379,2145][10][B,I,][Arial]]getting the foundation ready.
[[3379,2053,3424,2146][10][,I,][Arial]]
[[600,2147,645,2240][10][,I,][Arial]]
1)
Provide in letter form the name of the company to perform special inspections for
Dente Group, A Terracon Company, 30 Corporate Circle, Suite
concrete testing,
201 Albany, New York 12203 Phone 518-266-0310
2)
concrete reinforcement placement, soil compaction and structural framing inspections.
Dente Group, (contact info is above)
3)
Provide in letter form the name of the company to perform the blower door test.
Larocque Business Management Services LLC
66 Bishops Gate Ste A. Guilderland, NY 12084
4)
Provide in letter form the name of the company to perform the HVAC Air Balancing.
Adirondack Plumbing and Mechanical
P.O. Box 562, Glens Falls, NY 12801
Phil Tucker, 518-793-3883
5)
Submit all structural calculations for the foundation and structure. Also submit roof drain
. Please see attachment
calculations. Roof drain calculation to follow. (hope this will not
hold up getting the permit)
6)
These may be submitted on thumb drive or emailed in pdf form.
5) Submit two stamped copies of the 2018 IECC COMCHECK for building envelope, lighting
Will be dropped off in the outside bin with the fit up drawings
and electric and mechanicals.
and the balance of the money’s we owe ($1050)
6) On sheet S300 show on foundation cross-sections that the bottom of footings are 48” below
Please see attachment
finish grade. .
7) Provide in letter form the engineer responsible for submission of the preliminary
commissioning report for the mechanicals and service water-heating system.
Adirondack Plumbing and Mechanical
7)
Submit all worker’s compensation insurance information for all contractors on project.
As per our phone conversion I have Submitted ours, Galusha see attachment,
Ragone Foundations see attached Balance to be provided upon buyout with the
sub-contractors.
8)
Review Fire Marshal’s Initial Plan Review that is attached. Done
[[598,5431,822,5525][10][,I,][Times New Roman]]Please [[822,5431,843,5525][10][,I,][Times New Roman]] [[843,5431,1110,5525][10][,I,][Times New Roman]]contact [[1109,5431,1649,5525][10][,I,][Times
New Roman]]Kevin Knobloch [[1648,5431,1691,5525][10][,I,][Times New Roman]], [[1691,5431,1907,5525][10][,I,][Times New Roman]]kevink [[1904,5431,2208,5525][10][,I,][Times New Roman]]@bonaci
[[2207,5431,2409,5525][10][,I,][Times New Roman]]o.com [[2409,5431,2429,5525][10][,I,][Times New Roman]] [[2429,5431,2471,5525][10][,I,][Times New Roman]]o [[2471,5431,2503,5525][10][,I,][Times
New Roman]]r [[2503,5431,2524,5525][10][,I,][Times New Roman]] [[2524,5431,2670,5525][10][,I,][Times New Roman]]518. [[2670,5431,2712,5525][10][,I,][Times New Roman]]4 [[2712,5431,2858,5525][10][,I
,][Times New Roman]]15.9 [[2858,5431,3004,5525][10][,I,][Times New Roman]]166 [[2990,5431,3386,5525][10][,I,][Times New Roman]]for correcti [[3385,5431,3742,5525][10][,I,][Times New
Roman]]ons or omi [[3741,5431,3944,5525][10][,I,][Times New Roman]]ssions [[3944,5431,3966,5525][10][,I,][Times New Roman]]. [[3966,5431,4010,5525][10][,I,][Times New Roman]]
BONACIO CONSTRUCTION INC. PH: 518.584.9007
18 Division Street FAX: 518.584.0496
Saratoga Springs, NY 12866