Signed Inspection Report (01-28-2021) (5).pdfINSPECTION WORKSHEET (RESFINAL-007870-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0507-2020 Case Module:Permit
Inspection Date:Thu Jan 28, 2021 Inspection Status:Failed
Inspector:Dyer, Charles Inspection Type:Residential Final Inspection
Job Address:Parcel Number:323 LUZERNE RD
Queensbury, NY, 12804
308.12-2-58
Contact Type Company Name Name
Concrete Contractor Ottens Concrete
Granted Permission Bell, Jamie
Granted Permission Bell, Marie
Framing Contractor Top Notch Builders
Roofing Contractor Apex Solar Power
Architect G. Peter Jensen Architect
Contractor Precision Contruction Plus
Siding Contractor LaRose, Mike
Primary Owner Bell, Marie
Applicant Bell, Jamie
Checklist Item Status
General Comments Failed
1/28/21 spoke with contractor, project is put on hold until spring, nothing has occurred since permit being issued.
Project will consist of garage addition and roof over porch. Contractor is Precision construction-Steve Bonhote
and Peter Sluck.
CO in Bedrooms w/Gas Failed
Jan 28, 2021 Page (1)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
4 inch Building Number Address visible from road Failed
Chimney Height / B Vent / Direct Vent Location Failed
Chimney Rain Cap Installed Failed
Fresh Air Intake Failed
Fresh air supply 3' from grade Failed
3" Plumbing Vent through roof minimum 18 inch Failed
Outside Spigots have Air Gap Failed
Roof Complete / Exterior Finish Complete Failed
Platform at all exterior doors Failed
Handrail 4 or more risers Failed
Guards at stairs,decks,patios 30" + above grade Failed
Guard at stairwell at 34" or more Failed
Jan 28, 2021 Page (2)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Window guards req:<2' above floor/6' above grade - quick release installed Failed
Guard at deck, porches 36" or more Failed
Handrail Termination at Newell Post or Wall Failed
Interior/Exterior Railings 34 to 38 Failed
Wood deck: 2'+ from grade dia bracing required - H/C ramp compliant Failed
4+ Deck Joist Ledger Connections-24" From Ends Failed
Deck Ledger-Bolted per Code Failed
Grade away from foundation: 6" down, 10' out Failed
6" clearance to sill plate Failed
Gas Shut-off Exposed & Regulator (18) Above Grade Failed
HVAC Vent Terminal 10' from Lot Line & Openings Failed
Jan 28, 2021 Page (3)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Dryer Duct Max Length 35', Labeled Over 35'Failed
Interior privacy/trim/doors/main entrance 36 Failed
Bathroom / Kitchen Watertight Failed
Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet Failed
Safety glazing: w/in 5' of tub/shower - stairwell win/adj to drs Failed
Smoke Detectors:Failed
CO in Bedrooms w/Gas Failed
Smoke Detectors 3' from Kitchens & Baths R314 Failed
Every level, Every bedroom Failed
Outside every bedroom area Failed
Battery backup: _____Failed
Inter Connected Failed
Jan 28, 2021 Page (4)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Carbon Monoxide Detectors:Failed
CO Detectors within 10' of all sleeping areas Failed
Attic Access 22 x 30 minimum Failed
Attic Access Insulation = Attic R- Value Failed
Attic Access Gasketed Failed
Foam in basement/attics covered w/thermal barrier Failed
Crawl Space Access 18 x 24 Failed
Bathroom Fans, if no window Failed
Plumbing fixtures Failed
Backflow Preventors where required Failed
Foundation insulation to floor Failed
Jan 28, 2021 Page (5)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Energy Sticker on Elec. Panel:R-Val. & Heating Sys Failed
All Hot Water Systems: 3/4" or larger piping R-3 Failed
Duct work sealed properly Failed
Intake Openings Failed
Range Hood 400+ cfm-Fresh Air REQUIRED Failed
Blower Door Test Certification Failed
HRV or ERV Installed per Bedroom Requirements Failed
Floor truss, draft stop- fin base 1,000 sq. ft.Failed
Emergency egress below grade Failed
Furnace shut-off w/in 30 ft. or w/in line of site Failed
Oil Furnace Shut-Off at Entrance to Furnace Area Failed
Propane Tank: Proper Setback from Prop Line/Struct Failed
Jan 28, 2021 Page (6)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Furnace/Hot Water Heater operating Failed
Low water shut-off boiler Failed
Relief Valve ,Heat Trap/Water Temp 110 deg or less Failed
Encl. Stairs Sheetrock Underside minimum ½ Gypsum Failed
1/2" Gypsum or House Wall and Gable Failed
5/8" Type X with Living Space Above Failed
20 Minute Fire Door/Self-Closing Hardware Failed
Seals on Garage Doors, esp. Wood Failed
Basement stairs closed rise greater than 4 inches Failed
Basement Egress: 5s.f. window w/sill or Bilco door Failed
Basement ceiling covered 2x8 fl joist or less Failed
Jan 28, 2021 Page (7)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Jack posts in basement lagged at top and bottom Failed
Fireblocking at fl joist 80 s.f. or less Failed
Garage Floor Pitched Failed
1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl. Truss Failed
Gas Log In Sealed or Glass Enclosure Failed
Fin Elect; Energy Saving Light Bulbs 50 Percent Failed
CSST/other piping in conduit if buried,if required Failed
Final Survey Plot Plan Failed
Arc Fault Breaker Habitable Spaces Failed
Flex Gas Pipe Bonding Failed
As Built Septic System Failed
Sewer Dept. Inspection Sticker Failed
Jan 28, 2021 Page (8)
INSPECTION WORKSHEET (RESFINAL-007870-2021)
Checklist Item Status
Site Plan / Variance required Failed
Flood Plain Certification, if required Failed
Fuel Tanks above flood plain elevation Failed
Buried Fuel Tanks anchored in flood zone Failed
Truss ID Signage Installed at Electrical Meter Failed
OK to Issue Temporary C/O Failed
OK to Issue C/O Failed
Jan 28, 2021 Page (9)
Dyer, Charles