Loading...
ElevationsT/SUBFLOOR - 1ST FLOOR100' - 0"T/SUBFLOOR - 2ND FLOOR110' - 0 1/4"T/SUBFLOOR - 3RD FLOOR118' - 9 1/2"NEW ADDITIONRESIDENCEEXISTING NEW ENTRY NEW BREEZEWAY EXISTING RESIDENCETIMBER COLUMNS AND BEAMS AT NEW ENTRYNEW STONE AND BRICK CHIMNEYEXISTING CHIMNEYNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMNEW SHINGLE ROOF AND RAFTERSNEW STONE TO MATCH EXISTINGEXISTING STUCCO / NEW FIBER CEMENT PANELING TBD, NEW 1x6 COMPOSITE TRIMNEW CHIMNEY POT BY SUPERIOR CLAY PRODUCTSNEW CHIMNEY POTS BY SUPERIOR CLAY PRODUCTS0' 2' 4' 8'468 BROADWAYSARATOGA SPRINGSNY12866P 518.580.8818F 518.580.8824BALZERTUCK.COMGrasmeder ResidenceBTA PROJECT NO: 202901/15/2020 3222 ROUTE 9L, LAKE GEORGE, NY 12845South Elevation thru Mudroom T/SUBFLOOR - 1ST FLOOR100' - 0"T/SUBFLOOR - 2ND FLOOR110' - 0 1/4"T/SUBFLOOR - 3RD FLOOR118' - 9 1/2"T/ GARAGE SLAB105' - 1 1/4"EXISTING RESIDENCENEW ADDITIONNEW BREEZEWAYEXISTING GARAGENEW CHIMNEY POT BY SUPERIOR CLAY PRODUCTSEXISTING CHIMNEYNEW SHINGLE ROOFNEW STONE TO MATCH EXISTINGNEW CONCRETE STEPS WITH STONE TREADS AND IRON RAILINGREMOVE EXISTING ROOF AT ENTIRE GARAGE AND REPLACE WITH NEW TRUSSED ROOFNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMNEW STONE TO MATCH EXISTINGNEW STONE AND BRICK CHIMNEYEXISTING STUCCO / NEW FIBER CEMENT PANELING TBD, NEW 1x6 COMPOSITE TRIMNEW CHIMNEY POT BY SUPERIOR CLAY PRODUCTSNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMNEW CONCRETE STEPS WITH STONE TREADSDASHED RED LINE INDICATES 28' HEIGHT FROM GRADE0' 2' 4' 8'468 BROADWAYSARATOGA SPRINGSNY12866P 518.580.8818F 518.580.8824BALZERTUCK.COMGrasmeder ResidenceBTA PROJECT NO: 202901/15/2020 3222 ROUTE 9L, LAKE GEORGE, NY 12845West Elevation T/SUBFLOOR - 1ST FLOOR100' - 0"T/SUBFLOOR - 2ND FLOOR110' - 0 1/4"T/SUBFLOOR - 3RD FLOOR118' - 9 1/2"T/ GARAGE SLAB105' - 1 1/4"EXISTING GARAGEEXISTING RESIDENCENEW ADDITIONNEW STONE TO MATCH EXISTINGNEW DORMEREXISTING CHIMNEYNEW CONCRETE STEPS WITH STONE TREADS AND IRON RAILINGNEW CHIMNEY POT BY SUPERIOR CLAY PRODUCTSNEW STONE AND BRICK CHIMNEYNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMEXISTING STUCCO / NEW FIBER CEMENT PANELING TBD, NEW 1x6 COMPOSITE TRIMNEW CHIMNEY POTS BY SUPERIOR CLAY PRODUCTSREMOVE EXISTING ROOF AT ENTIRE GARAGE AND REPLACE WITH NEW TRUSSED ROOFNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMDASHED RED LINE INDICATES 28' HEIGHT FROM GRADE0' 2' 4' 8'468 BROADWAYSARATOGA SPRINGSNY12866P 518.580.8818F 518.580.8824BALZERTUCK.COMGrasmeder ResidenceBTA PROJECT NO: 202901/15/2020 3222 ROUTE 9L, LAKE GEORGE, NY 12845North Elevation T/SUBFLOOR - 1ST FLOOR100' - 0"T/SUBFLOOR - 2ND FLOOR110' - 0 1/4"T/SUBFLOOR - 3RD FLOOR118' - 9 1/2"T/ GARAGE SLAB105' - 1 1/4"EXISTING GARAGENEW BREEZEWAYEXISTING RESIDENCEEXISTING CHIMNEYNEW DORMEREXISTING STUCCO / NEW FIBER CEMENT PANELING TBD, NEW 1x6 COMPOSITE TRIMNEW CHIMNEY POTS BY SUPERIOR CLAY PRODUCTSREMOVE EXISTING ROOF AT ENTIRE GARAGE AND REPLACE WITH NEW TRUSSED ROOFNEW FIBER CEMENT PANELING WITH 1x6 COMPOSITE TRIMNEW SHINGLE ROOF AND RAFTERSDASHED RED LINE INDICATES 28' HEIGHT FROM GRADE0' 2' 4' 8'468 BROADWAYSARATOGA SPRINGSNY12866P 518.580.8818F 518.580.8824BALZERTUCK.COMGrasmeder ResidenceBTA PROJECT NO: 202901/15/2020 3222 ROUTE 9L, LAKE GEORGE, NY 12845East Elevation 468 BROADWAYSARATOGA SPRINGSNY12866P 518.580.8818F 518.580.8824BALZERTUCK.COMGrasmeder ResidenceBTA PROJECT NO: 202901/15/2020 3222 ROUTE 9L, LAKE GEORGE, NY 12845Lake Perspective