Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2004-177
TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY12804-5902 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CE'D'"VIFICATE _OF_ OCCUPANCY Permit Number:. -P200401-77`- Date'Issued: Monday, July 19, 2004 - _z 'r This--is,.-to-certify that-work requested._to:be:done as shown by.Permit Number P20040177 has been completed. Tax Map Number: _ 523400-308-007-0001-007=000-0000 Location: 16 EVANNA Dr Owner: _ . CERRONE BUILDERS INC Applicant: CERRONE BUILDERS INC This structure may be occupied as a: By Order of Town Board Garage - 2 Cars Attached TOWN OF QUEENSBURY Single Family Dwelling V Director of Building&Code Enforcement 'r TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201 Community Development-Building&Codes (518) 761-8256 BUILDING PERMIT Permit Number: P20040177 Application Number: A20040177 Tax Map No: 523400-308-007-0001-007=000-0000 Permission is hereby granted to: C;F,RP,0NF,BTTTT,DF,RS TNC; For property located at: 16 EVANNA Dr in the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and_other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance. Tyne of Construction Value Owner Address:. CERRONE BUILDERS INC 66 SUNSET Trl Garage-2 Cars Attached Single Family Dwelling $180,000.00 QUEENSBURY, NY 12804-0000 Total Value $180,000.00 Contractor or Builder's Name /Address Electrical Inspection Agency Plans&Specifications 2004-177 LOT 11 HOUSE#16 EVANNA DRIVE, Pinetree Circle Subdivision 1606 SQ FT SINGLE FAMILY DWELLING $232.72 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,April 28, 2005 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before,the expiration date.) Dated at theme o of Qu sbtyry; ed day,April 28, 2004 SIGNED EY T_®( for the Town of Queensbury. Director of Building&Code Enforcement Check Residential Plan Review: One&Two Family Dwellings Y/N/N/A (2)Full sets of plans Over 1,500 sq.ft.—Stamped Design Loads On Plans:90 Wind Floor Loads 40 psf 70 Snow Load Sleeping Areas and Attics 30 psf Calculations: Window Schedule With Glass Size Door Schedule/Main Entrance 36"Door /Emergency Escape Or Bedrooms and Habitable Space Above/Below grade,5.7 sq.ft. Grade,5.0 sq.ft. 24"(h)x 20"(w)min. 44"Max.Height above floor Residential Check Paperwork Compliance and Inspectors Checklist: OK Dampproofing/Waterproofing Materials On Plans Foundation Drainage On Plans,if required 6"Yrop in 10'Exterior Grade taming Cross Section For Each Roof Line,Vertical Fire Stopping Every 10'Where Required Ic and Snow shield 24"Inside Exterior Wall/24"Inside Knee Walls latforms At Exterior Doors Atairway Headroom 6' 8'All Stairs 36"Width Stair Run and Rise - Winder Run and Rise , r Spiral Not Allowed From 2"d Story S oke Detectors Battery Backup and Proper Location B throom Fixtures Proper Clearance all Width,36"min. andraiIs More Than One Riser On Open Sides Railing and Guards>30"/Basement Stairs Included/Closed Risers More Than 4"in Ht. Safety Glazing Notes For Required Areas bl Garage Fire Separation Garage Floor Sloped e Access of over 30"—22"x 30"/Crawl Spaces 18"x 24"Access Carbon Monoxide Detector Lowest Sleeping Level Soil Test Results,if required Septic To Well Or Water Line Separation All Paperwork Signed Building Permit APPlkation- Town of Queensbury—Dept of Community Development,742 Bay Road,Queensbury,NY (518)761.8256 A permit must be obtained before beginning construction' Permit File No..d � t �'�� No inspection will be made.until applicant has received a Fee Paid $ 3��1� P •� valid building permit. All applicants' spaocs on this Rec,Fee Paid $e -�°aL 0 s� application mustbe completed and must appear-on the Reviewed BA. application form. Applicant: e Owner: ' APR 7 3 2004 Address: Address: a ta' Phone#(�Ci ) Phone#(_.._) -_,_._..BUILDING UEENSBURY � ©CODE p ouse Number property Location: Lot, umber: I Subdivision Name: T Map Number 7 -- New Building: residence /commercial 'Estimated Market Value of Construction:$ �> a Addition: residence I commercial If an Addition,what will use of new addition be? C Alteration: residents/ commercial O No change to exterior size: residence/com'1 0 Other work(describe ) Check Occupancylnformation i` Floor 2° Floor Other floor Total Below sq.it. sq.ft. sq.ft. Square Feet Sin a family dwelling � 10 o .Two family dwelling n Townhouse o Muldfimily dwelling #of units r a Office o Mercantile o Manufaatlltin . v 1 car detached Samge D 2 car detached gars e Cl 3 car detached age 0 1 car attached garage ,Vt` 2 car attached prago 'Zo a 3 car attached garage c Storage building- commercial o Storage building- residential i e Other What is the proposed height of the structure feet +Inches Will any second-hand or ungraded lumber be used?, If so,for what? Type of Heating System: electric/ oil CPS)/wood /forced hot air baseboard/other: Number of Fireulaces to be installed �� Number of o ves,to be installed List below the person(s)responsible for supervision of work as regards to building codes: -NP.una Ad s Phone Number Builder L Plumber l? Mason 3 _ Z17r Electrician ��.ZE Z:(2 � Declaration: please sign below after you have carefully read the statement: To the best of my lmowledge,the statements contained in this application,together with the plans and specifications submitted,are a true and complete statement of all proposed work to be done on the described premises and that an provisions of the Building Code,the Zoning Ordinance and all other laws pertaining to the proposed work shall be complied with,whether specified or noted;and that such work is authorized by the owner. Further,it is understood that Uwe shall submit,prior to a Certificate of Occupancy or Certificate of Compliance being issued,as requested by the Zoning Administrator or r of Building and Codes,an&fiullt karvev by a licensed surveyor;drawn to scale,showing actual location of all w co ctlo Signature: . owner,owner's agent,architect,contractor Project Name: j `� Ll/�/�//?/ BP# OQ77477 Address: /2L-- Building Pernnt Submission SFD Checklist 2-Family APR 1 3 2004 TOWN OF OUEe. All items below must be checked either yes,no or not applicable prior to submission of~bad Cad permit to the Town of Queensbury Building Departtnent. If any of the below items are lacking,the permit will not be accepted until such time as the application is deemed complete for submission. 1. Building Permit Application Completed ... .................................. d)WE]no ❑n/a 2. Energy Form or Checld&te Energy Code Compliance Forms Complete.. Pyes ❑no 0-1- (2 copies) 3. Energy Code Inspector's Report from C heckMate ProgtanZ.. ... ... ... ... .. [l yes E)no ❑n/a (2 copies) 4. Septic application completelyfilled out(if applicable).................. ... ... Ff yes ❑no ❑n/a 5. Solid Fuel Burning or Comas Appliance Form... ......... n/a ......... ... ...... ... ... yes Ono 6. Electrical Inspection Form... ... ... ... ... ..................... ...... ...... ... ... .. Pyes []no Qn/a 7. Two(2) co lete sets of structural drawings( mP ..... .................. ...... ... ... . yes Ono ❑n/a a)floor plan;b)foundation plan;c)cross sections:d)elevations; e)window and door schedule 8. Two(2)site plans showing location of the structure to be built.... ... ... ... Pyes Ono nn/a location of well or water lines,location of septic system or sewer line. 9. Setbacks from propertylines to new structure........................... ... .. 6s Ono ❑n/a 10. Setbacks to neighboring wells and septic systems,including onsite well.... Dyes ❑no dn/a and septic systems (if applicable) 11. DrivewayPermit... ......... ... ... ... ...... ... .............................. ... ... Oy s Ono Dn/a Date: 13 c i Staff Initial: L_\SueHemingway\Building.Pernut.FORMS\Generic aecklist.doc January 28,2003 Application for Permit-Septic Disposal System Town of Queensbury 742 Bay Road Queensbury,NY 12804 (518) 761-8256 1. OWNER INFORMATION: ........................................................................... ......................,..� Office Use Location of installation: 'i �o�-l 7 7 File Permit No. Tax Map No. I / /� Fee Paid Owner's Name- l_�'-zo u Address: �?� �' i TO .. , ...., ,..3..2004 Q�P! !F CDEE&Is R� -� 4 IG 1 sU 2. INSTALLER'S NAME : r c� � PHONE NO. �4 �9,'®�OD.� 3. RESIDENCE INFORMATION: (circle year of dwelling,indicate#bedroom(s) and multiply#of bedrooms with applicable gallons per bedroom to equal total daily flow) Year of House: No. of Bedrooms x Computation = Total Daily Flow 1980 or older x 150 gal/bdrm = 1980—1991 _ _ x 130 gandrm = 1991—present x 110 gal/bdrm Garbage Grinder Installed yes_ / no Spa or Hot Tub Installed yes_./ no Z 4.' PARCEL INFORMATION: (circle applicable information&indicate measurements) o a h So' Nature Ground Water Bedrock or Impervious Material c Water Sup-ply tat Van at what depth at what depth municipal olling feet feet we Steep slope clay if well;water supply +%slope other from any septic-system depth: absorption is ft. other Percolation Test: (To be completed by licensed professional engineer or architect) Rate: minute per inch 5. PROPOSED SYSTEM: For New Construction: All individual sewage disposal systems must be designed by a licensed professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size of the septic tank and leach field for each Garbage Grinder, Spa or Whirlpool Tub. Septic Tank: /XW-0-gallon(min. size 1,000 gal) Tile Field: each trench Total System Len Seepage Pit(s): number of size of each: fi, by ft. Size a f Stone to be used: # / depth or thickness feet Bed System Size: x Alternative System: length and/or size 6. HOLDING TANK SYSTEM: (if required) Number of tanks: / Size of each: gallons !TOTAL Capacity: gallons Note: Alarm System and associated electrical work must be inspected by a Town approved electrical inspection agency. 7. SIGNATURE &INFORMATION FOR RESPONSIBLE PERSON(please read) For your protection,please note that pursuant to Section 136-29 of the Code of the Town of Queensbury,any permit or approval granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations with respect to this application and agree to abide by these and all requirements of Town of Queensbury Sanitary Sewage Disposal Ordinance. � rr Signature of responsible person Da e ''I'aW'lI t)f tZt:-t+sl,tlstsi•�► St;tivc:l•4 and 8trtivstl:c: I)i.4j>a.4stt t.li:st>ire• /11}.4it)It,I'`'t'Ic�2l� MIrI,I.) 1 s I-Aw -.�.w •p�� � -,..fir POND 1...•.S WuL IN 114%,ri Z- \ . •Iu+�ur .�1►tc; .Itil u �� . Hew= G M 1�ry - '� •� Sc vi lc. ' \ � ,• L)^ltt1.1�111•t w �•'yQ.t�.Q � war . y ' --� •.•.� •��r �,►.'..rf�*r wry ••�- ROM) 7. SMN,p,,'I.UBB . r � w ENERGY CODE COMPLIANCE APPLICATION (-�� .� 7 TOWN OF QUEENSBURY, WARREN COUNTY R E C E N . 9000 HEATING DEGREE DAYS _ APU I " 2004 Compliance Methods:Part 5 -Acceptable Practice Method—1&2 Family Dwellings('on] Part 6*-Thermal Rating—Component trade Offs 1&2 Family Dwel gtVN 01 �1"_1` SBURY -.3N DING r©DE Multi=:Family Dwellings(3 Stories or less) - - -- --- Part 4*-Design by Component Performance,Commercial Buildings-Hi Rise Residential *Requires submission of worksheets CLICANT'S Z TY LG► TT PART 5 METHOD OF COMPLIANCE BY ACCEPTABLE PRACTICE: 1. Gross Floor Area square feet 2. Type of heat- Electric Oil r/ Gas Other 3. Is building mechanically cooled? yes No 4: Percentage of area of windows and doors Over I7% Under 17% 5. R-VALUES FOR INSULATION GIVEN BEL OW MUST CORRESPOND TO R VALUES AS SHOWN ON PLANS SUBMITTED: _ a: Roof R b. Exterior walls R_ C. Glazed areas R �. d. Exterior doors R e. Floors over unheated spaces R L Edge of slab on grade(heated building) R g. Basement/cellar yvalls(above grade) R /O h. Basement/cellar walls(below grade) R f Q i. Heating/cooling-ducts-piping in unheated space R 6. Service(domestic)hot water heating device Conforms to minimum efficiency per code /Yes No TEMPERATURE CONTROL MAXIMUM SETTING 140—WILL NOT BE EXEEDED p can ' ignature Date Phone Number INSPECTOR'S REMARKS: r Queensbury Building & Code Enforcement - Residential Final Inspection Office No. (518)761-8256 Arrive: any/ m Depart: am/pm Date Inspection request received: Inspector's Initials: `�y % ✓" NAME: �/��.�J�= PERMIT#: Ct LOCATION: DATE: TYPE OF STRUCTURE: Comments Y N N/A Chimney Ht./"B"Vent/Direct Vent Location Fresh Air Intake 3 inch Plumb Vent through roof minimum 6" Roof Complete/Exterior Finish Com lete Guard 30 in. or more @ stairs, decks,patios Guard at stairwell at 34 in. or more Guard at deck,porches 36 in. or more Exterior Finish Complete Interior/Exterior Railings 34 in.to 38 in. ,Platform at all exterior doors Interior Handrails stairs 2 or more risers Enclosed Stairs Sheetrock Underside minimum %" Gypsum Grade away from foundation 6 in.with 10 ft. Handrail Termination at Newell Post or Wall 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18"above grade Gas Furnace shut-off within 30 ft. or within line of site Oil Furnace shut-off at entrance to fiimace area Furnace/Hot Water Heater operating ow water shut-off boiler Relief Valves installed/Heat Trap/Water Temp 110 VV Interior privacy/trim/doors/main entrance 36 in. athroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors: Every level: / Every Bedroom: Outside every bedroom area: Inter Connected: / Battery backup: Carbon Monoxide Detector Bathroom Fans, if no window Plumbing fixtures Foundation insulation Floor truss, draft stopping finished basement 1,000 sf Emergency egress below grade Basement stairs closed rise>4 inches Garage Floor Pitched _ l ara e fireproofing/'/4 hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area Crawl S aces 18"x 24" access, I s . ft.-150 s . ft. vents Buildin No./Address visible from road Final Electrical Site Plan /Variance required Final Survey Plot Plan As Built Septic System/Sewer Dept. Inspection Sticker Flood Plain Certification, if required Okay to issue C/C or C/O Temporary/Permanent] L:\PamW\Building&Codes\Inspection Forms\Res. Final Insp. form 2.docLast printed 2/12/04 -7 ly POW, Op cQ 1p� U "I have seen or observed, or believe I saw evidence of, i ail obiectS as hol-s es, �iells, trees, fences, etc., shoml 1 aiso represent that I have pelt Ona0v' i6l dinA-InCes set forth on the diagrapi SIGNATURE DATE N OV Queensbuiy Building & Code Enforcement - Residential Final Inspection Office No. (518)761-8256 Arrive: am/pm Depart: Date Inspection request received: 9114104 J=pft Inspector's Initials: 1 1;4v— NAME: PERMIT#: OO -7 I LOCATION: lb bj)!\LL I I DATE: (p TYPE OF STRUCTURE: S(=1) YW— Comments Y N N/A Chimney Ht./"B"Vent/Direct Vent Location Fresh Air Intake 3 inch Plumb Vent through roof minimum 6" Roof Complete/Exterior Finish Com lete Guard 30 in.or more @.stairs, decks,patios Guard at stairwell at 34 in. or more Guard at deck,porches 36 in. or more Exterior Finish Complete Interior/Exterior Railings 34 in. to 38 in. Platform at all exterior doors L � L t Pe/Interior Handrails stairs 2 or more risers ��5�/k�L Enclosed Stairs Sheetrock Underside minimum %" V7— Gypsum Grade away from foundation 6 in. with 10 ft. 01 Handrail Termination at Newell Post or Wall 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18"above grade Gas Furnace shut-off within 30 ft. or within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Low water shut-off boiler I Relief Valves installed/Heat Trap/Water Temp 110 Interior privacy/trim/doors/main entrance 36 in. Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors:Every level: i Every Bedroom: Outside every bedroom area: Inter Connected: / Battery backup: Carbon Monoxide Detector Bathroom Fans, if no window Plumbing fixtures All Foundation insulation Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade Basement stairs closed rise>4 inches Garage Floor Pitched Garage fireproofing/3/4 hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area Crawl Spaces 18"x 24"ac ess; 1 s . ft.-150 s . ft.vents Building No./Addre v' tbl fro ad V I `t> I Final Electrical Z5 Site Plan /Varian r uir d Final Survey Plot Plan ` As Built Septic System/Sewer Dept. Inspection Sticker Flood Plain Certification,if required4 Okay to issue C/C or C/® Temporary/Permanent] L:\PamW\Building&Codes\Inspection Forms\Res. Final Insv. form 2.docLast printed 2/12/04 Queensbuly Building & Code Enforcement - Residential Final Inspection Office No. (518)761-8256 Arrive: am/pm Depart: am/pm Date Inspection request received: Inspector's Initials: /�J NAME: C &,I410/Lc: PERMIT#: LOCATION: Le (1 U.,v/VV t'� L DATE: 0 TYPE OF STRUCTURE: Comments Y N N/A Chimney Ht./"B"Vent/Direct Vent Location Fresh Air Intake 3 inch Plumb Vent through roof minimum 6" Roof Complete/Exterior Finish Complete Guard 30 in.or more @.stairs,decks,patios Guard at stairwell at 34 in. or more Guard at deck,porches 36 in. or more Exterior Finish Complete Interior/Exterior Railings 34 in.to 38 in. Platform at all exterior doors Interior Handrails stairs 2 or more risers Enclosed Stairs Sheetrock Underside minimum %" Gypsum Grade away from foundation 6 in. with 10 ft. Handrail Termination at Newell Post or Wall 6 inch clearance to sill plate Gas Valve shut-off exposed/regulator 18"above grade Gas Furnace shut-off within 30 ft. or within line of site Oil Furnace shut-off at entrance to furnace area _ Furnace/Hot Water Heater operating Low water shut-off boiler Relief Valves installed/Heat Trap/Water Temp 110 Interior privacy/trim/doors/main entrance 36 in. Bathroom/Kitchen watertight Safety glazing/Window in stairwells safety glazing Interior Smoke Detectors: Every level: / Every Bedroom: f Outside every bedroom area: Inter Connected: / Battery backup: Carbon Monoxide Detector Bathroom Fans, if no window Plumbing fixtures Foundation insulation Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade Basement stairs closed rise>4 inches Garage Floor Pitched i Garage fireproofing/'/4 hour fire door/door closer Duct work Sealed properly Gas Logs in Sealed or Glass Enclosure Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area Crawl Spaces 18"x 24" access, I s . ft.-150 s . ft.vents B ildin No./Address visible from road inal Electrical Site Plan /Variance re uired Final Serve Plot Plan �VL As Built Se tic System/Sewer Dept Ins ection Sticker Flood Plain Certification, if required Okay to issue C/C or C 10 Temporary/Permanent] L:\PamWlBuilding&Codes\Inspection Forms\Res. Final Insp. form 2.docLast printed 2/12/04 jk, 713 rl_ 169 Haviland Road, Queensbury, NY 12804 Phone-518-745-4400 Fax -518-792-8511 August 9, 2004 Job #46173 New York State Dept. of Health 77 Mohican Street Glens Falls,NY 12801 RE: Pinotree Circle Subdivision - Queensbury(T) 16 Evanna Drive (Lot# 11) Septic System Dear Sir/Ma'am: This letter is to inform you that I inspected the completed septic system for the house at 16 Evanna Drive(Lot 911) in the Juniper Hill Subdivision on July 13 ,2004. The septic system as installed was for a three bedroom house and consisted of a 1,000_gallon septic tank.and 165 lineal feet of absorption trench constructed with stone and perforated pipe. The system conforms to the requirements of the approved subdivision design drawings. Please call me if you have any questions or concerns. Sincerely, Thomas R. Center Jr., EI cc: ID Hatinjown oNueensbury Al Cerrone C g Septic Inspection Report Office No. (518) 761-8256 Date Inspection requiia d: 1% 0 -4.5 am Queensbury Building&Code Enforcement Arrive: amart: m/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: 0 hOJ PERMIT NO.: Lot �' I� LOCATION: (y INSPECT ON: 911nU RECHECK: Comments and/or diagram Soil Type: San /Loa Clay T e of Water- unicipal/ ell Water Waterline separation istance Well separation distance ft. Other wells: Absorption Field: Total length 0 ft. Length of each trench ft. Depth of trenches ft. Size of Stone .Seepage Pits: Number Size: x Stone Size: Piping sizp.. Type. Building to tank n Tank to DistributioX Box Distribution Box eld/Pit Opening Sealed:01 Partial Location/Separations Foundation to tank ft. Foundation to absorption ft. Separation of Pits Conforms as per Plot Plan Vf N Location of Syst m on.Property: Front Rear Left Side Right Side Middle Front fiddle Rear System Use Statu Approved Partial Approved and needs to be re-inspected,please call the Building&Codes Office Disapproved L:\SueHemingway\Building.Codes.Inspection.FORMS\Septic Inspection Report.doc January 28,2003 J� ti Z,74 t/ 1 h-Ave sf.en or beflewe I Seats evidence of, G?f .;k��iF Lrees, SeiiE,.t�i.Ci�Fic�.kC�., Sig that C have j F..•es ��i �'sirl� (mily the dsagl Z IGNI S j 2 -tea IS- 00 �a 3 COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC. Main Office 176 Doe Run Road-Manheim,PA 17545 MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL / Permit No........................................Cert. NO 7a5914 Cut-in Card No.....::.................. Owner.................L' 0W/��-4.) e0......................................................^�.. ....................................................................... Location.......................................... '............................................ .......... ............ ......::....... .S / �L f�? Install tion Consisting of..?............. 1..................................... .................1....... . .... ... ....... .. ....... ....A-..cc ... .................................................................................................................... Installed By.......... r�.......... ....................................................Lic.No................................................... The conditions following governed the issuance of this certificate,and any certificate previously issued is cancelled:- This certificate only covers the electrical equipment and installation conditions as of date. Upon the introduction of additional equipment or alterations,application shal a promptly made for inspection. Inspectors of this Company shall have the privilege of ma mg i spections at any time, and if its rules are violated,the Company shall have the right t r oke is c 'fic Date....,1.f !:�...... ....................... INSPECTOR................. ........................................................................... _ Member N.F.P.A.,I.A.E.I. k�21 Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: i Queensbury Building&Code Enforcement Arrive: am/p Depart:. am/pm / 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: P-P,04)C PERMIT #: C LOCATION: C y,4n�N;�- �� . INSPECT ON: (o & TYPE OF STRUCTURE: Y N/A P R-1,R-2,R-3,R4 Drain/Vents ast Iron, Copper Drain/Vent/ Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates ' 1 % inch min. Drain Size Washing Machine Drain 2 inch min. Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction Water Supply Piping o C11 ooiler Commercial er, CPVC,Pex One and Two-Family1 ��U Insulation/Residential Check/ Commercial Check V r I Proper Vent,Attic Vent �� T� Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape COMMENTS: L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Repott.doc November l7,2003 Rough Plumbing / Insulation Inspection Report � g p � Office No. (518) 761-8256 Date Inspection request received: r Queensbury Building&Code Enforcement Arrive: am/p epart: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: C rZD06 PERMIT #: D17*7 LOCATION: ��/':��,N�, �� - INSPECT ON: - C ,ob TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R4 Drain/Vents Cast Iron, Copper Drain/Vent/Comm. Plumbing Vent/Vents in Place Rough Plumbing/Nail Plates 1 % inch min.Drain Size Washing Machine Drain 2 inch min. Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction 7W ter Supply Piping Cooper Commercial f Cooper,CPVC,Pex One and Two-Family Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape COMMENTS: L:\SueHemingway\Building.Codes.inspection.FQRMS\Rough Plumbing Insulation Report.doc November 17,2003 Ark, 3�� . Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building& Code Enforcement Arrive: am/pmI Df part: a pm'. 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: d I`'� i NAME: ���'�� /PERMIT #: cPWD -177 LOCATION: INSPECT ON: (-' c 64 TYPE OF STRUCTURE: Y N N/A PVC: R-1,R-2,R-3,R4 Drain/Vents Cast Iron, Co er Drain/Vent/Comm. ,4�� z, N N Vent/ lace umbi /Nail Plates min. Drawn SzeMachine Drain 2 inch min. 'ad or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/change of direction f6 Water.Supply Piping ] V1 Cooper Commercial % r C , CPV C,Pex One and Two-Family �/ G Y\ Insula 'on Residential Check/ Commercia Check (� Pro ent,Attic Vent CG I G/A) Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape ,v5�v COMMENTS: � Si � �✓Z - Isar.i F� �� �1k`�-- CAU' LASueHemingway\l3uilding.Codes.Inspection.FORMS\Rough Plumbing Insulation Repoit.doc November 17,2003 Framing /Firestopping Inspection Report ~ Office No. (518) 761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/p epart: - am/pm ]� 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: f j 2PERMIT#: LOCATION: INSPECT ON: TYPE OF STRUCTURE: LU Y N A N/A COMMENTS taming Jack Studs/Headers Bracing/Bridging I Joist hangers LC (r" , g . Uw'7 Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 1/2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches P wall Fire separation 1, 2, 3 hour re wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %2 inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASueHemingway\Building.Codes.Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Rough Plumbing / Insulation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/p. part: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: PERMIT. LOCATION: INSPECT ON; TYPE OF STRUCTURE: N N/A PVC: R-1,R-2,R-3,R4 Drain/Vents Cast Iron, Copper Drain/Vent/Comm. Plun 3bing Vent/Vents in Place -Rough Plumbing/Nail Plates �fp/ LL �L 1 % inch min.Drain Size Washing Machine Drain,2 inch min. / S Head or Air Supply Test Drain and Vents 5 PSI or 10 feet above highest connection for 15 minutes Cleanout every 100 feet/chan a of direction Water Supply Piping Cooper Commercial Cooper,CPVC,Pex One and Two-Family Insulation/Residential Check/Commercial Check Proper Vent,Attic Vent Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape COMMENTS: L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003 Framing / Firestopping Inspection Report r Office No. (518) 761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/pm part: am/pm 742 Bay Road, Queensbury,NY 1.2804 Inspector's Initials: NAME: A PERMIT#: V C ! LOCATION: / INSPECT ON: _ ti -D TYPE OF STRUCTURE: F Framing Y N N/A COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %z(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center e and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3,4 hour n Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side %inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade LASueI-Iemingway\Building.Codes,Inspection.FORMS\Framing Firestopping Inspection Report.doc January 28,2003 Framing /Firestopping Inspection Report Office No. (518)761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/ De art: am/pm 742 Bay Road, Queensbury,NY 12804 Inspector's Initials: NAME: C �(��c)l PERMIT#: l LOCATION: t'AJs1- `26- - INSPECT ON: TYPE OF STRUCTURE: Framing 1V Y N N/A COMMENTS Jack Studs/Headers Bracing/Bridging Joist hangers Jack Posts/plain Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft. 8 in. Stairwells 36 in. or more Headroom 6 ft. 8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 %z(w) 16 gauge (8) 16D nails each side Draft stopping 1,000 sq. ft. floor trusses Anchor Bolts 6 ft. or less on center Ice and snow shield 24 inches from wall Fire separation 1, 2, 3 hour Fire wall 2, 3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side ''/z inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in. (H) 20 in. (W) 5.7 sf above/below grade 5.0 sf grade L:\,SueHemingway\Building.Codes.Inspection.FORMSTraming Firestopping Inspection Report.doc January 28,2003 A Foundation Inspection Report Office No. (518)761-8256 Date Inspection reques received: (o U Queensbury Building&Code Enforcement Arrive: am/ m epart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: �21�,� PERMIT#: 7 LOCATION: INSPECT ON: 1 ? v'f ° TYPE OF STRUCTURE: Comments _A Y 1V/ ootings � � Piers Monolithic Slab Reinforcement in Place 2-� L( The contractor is responsible for I providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 1.2 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASueHenungway\Building,Codes.InspectionTORMSToundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection request received: 3lXdb Queensbury Building&Code Enforcement Arrive: am/prr� epart.1Z pm 742 Bay Rd., Queensbury,NY 12804 Inspector's Initials: NAME: �Ce PERMIT#: U U r/ 7 LOCATION: `-Vez ,,JNSPECT ON: 5 13 TYPE OF STRUCTURE: Comments �'�`�ti►�--" Irk-ti Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place • Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing ,--=4�!�oly for wet areas under slab Bacicfi proval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASueHemingway\Buil ding.Codes.Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection request received: Queensbury Building&Code Enforcement Arrive: am/p` Depart: am/pm 742 Bay Rd., Queensbury,NY 12804 Inspector's lnitials: NAME: Jn ,+?�Cam. PERMIT#: 7 LOCATION: f V INSPECT ON: TYPE OF STRUCTURE: Comments Y N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place r Foundation Dampproofing Foundation/Waterproofing Type of Dampproofing/Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Bacicfill Approval 4 Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. LASueHemingway\Building.Codes.Inspection.FORMSToundation Inspection Report.doc January 28,2003 L)i t� 6 '/''�•rur�'� A J l� 0- �2804- ��,: � vWoraT, o� G �es LOT l4vGp 5 JPWAVvcM0 # 1543-0 -FoWN OF Q L� P 1 �I G TIC �OvE" T 1 (q C CI-f A i4G EE. A-kc= A-ccGp-AOLE7 T:- NOT P-ETaU 12��, P�2, C1�Dc. E 1 T H-EW-, A k,,-E`r x/v 4 Y O 12, 5 Te D©wEz�s, M A-� 13e USEr .o Dry c z- TI-1�`" NOT BOTH• �'LEsE F:j— T d C �z �2Et- AN i 64GT N(� I Yo cti C�-12 j E ID A ��., L Apo i r,,4Ty F, E. RECENED cy �, 3oK �a APR P 8 2004 TOWN OF r:UF-ENSBURY Permit umber -CEIV MECcheck Compliance Report - Checked By/Date APR 1 .' 2004 Proposed New York State Energy Conservation Construction Code TOWN OF OUEENI cI3URY MECcheck Software Version 3.3 Release lb BUILDING AP(r)CODE_ Data filename: C:\Program Files\Check\MECcheck\CERRONE BUILDERS, INC. LOT 1 l.cck TITLE:CERRONE BUILDERS, INC. COUNTY:Warren STATE:New York HDD:7635 CONSTRUCTION TYPE:Detached 1 or 2 Family HEATING TYPE:Non-Electric DATE:03/29/04 DATE OF PLANS:3/24/04 PROJECT INFORMATION: LOT 11 COMPLIANCE:Passes Maximum UA=392 Your Home=274 30.1%Better Than Code Gross Glazing Area or Cavity Cont. or Door Perimeter R-Value R-Value U-Factor UA Ceiling 1:Flat Ceiling or Scissor Truss 838 30.0 0.0 29 Wall 1:Wood Frame,l6"o.c. 2118 19.0 0.0 113 Window 1:Vinyl Frame,Double Pane with Low-E 141 0.350 49 Door 1:Glass 40 0.350 14 Door 2: Solid 58 0.100 6 Basement Wall 1: Solid Concrete or Masonry,7.6'ht/6.8'bg/7.6'insul 1007 110 0.0 63 Furnace 1:Forced Hot Air,90 AFUE Air Conditioner 1:Electric Central Air, 10 SEER. COMPLIANCE STATEMENT: The proposed building represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application. The proposed systems have been designed to meet the Proposed New York State Energy Conservation Construction Code requirements. 4kfflder/Designer c e Date (3-7-I-0¢ MECcheck Inspection Checklist Proposed New York State Energy Conservation Construction Code MECcheck Software Version 3.3 Release lb DATE:03/29/04 TITLE:CERRONE BUILDERS, INC. Bldg. Dept. Use Ceilings: [ ] 1. Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity insulation Comments: Above-Grade Walls: [ ] 1. Wall 1:Wood Frame, 16"o.c.,R-19.0 cavity insulation Comments: Basement Walls: - [ ] 1. Basement Wall 1: Solid Concrete or Masonry,7.6'ht/6.8'bg/7.6'insul, R 11.0 cavity insulation Comments: Windows: [ ] 1. Window 1:Vinyl Frame,Double Pane with Low-E,U-factor:0.350 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break?[ ]Yes[ ]No Comments: Doors: [ ] 1. Door 1:Glass,U-factor:0.350 #Panes Frame Type Thermal Break?[ ]Yes[ ]No Comments: [ ] 2. Door 2: Solid,U-factor:0.100 Comments: Heating and Cooling Equipment: [ ] 1. Furnace 1:Forced Hot Air,90 AFUE or higher Make and Model Number [ ] 2. Air Conditioner 1:Electric Central Air, 10 SEER or higher Make and Model Number Air Leakage: [ ] Joints,penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed. [ ] Recessed lights must be Type IC rated and installed with no penetrations,or Type IC or non-IC rated installed inside.an appropriate air-tight assembly with a 0.5"clearance from combustible materials and 3"clearance from insulation. Vapor Retarder: [ ] Required on the warm-in-winter side of all non-vented framed ceilings,walls,and floors. Materials Identification: [ ] Materials and equipment must be installed in accordance with the manufacturer's installation instructions. [ ] Materials and equipment must be identified so that compliance can be determined. [ ] Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided.. [ ] Insulation R values,glazing U-factors,and heating equipment efficiency must be clearly marked on the building plans or specifications. Duct Insulation: [ ] Supply ducts in unconditioned attics or outside the building must be insulated to R-11. [ ] Return ducts in unconditioned attics or outside the building must be insulated to R-6. [ ] Supply ducts in unconditioned spaces must be insulated to R-11. [ ] Return ducts in unconditioned spaces(except basements)must be insulated to R-2. Insulation is not required on return ducts in basements. Duct Construction: [ ] I All joints,seams,and connections must be securely fastened with welds,gaskets,mastics (adhesives),mastic-plus-embedded-fabric,or tapes. Duct tape is not permitted. Exception:Continuously welded and locking-type longitudinal joints and seams.on ducts operating at less than 2 in.w.g.(500 Pa). [ ] Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions. [ ] Cooling ducts with exterior insulation must be covered with a vapor retarder.. [ ] Air filters are required in the return airsystem. [ ] The HVAC system must provide a means for balancing air and water systems. Temperature Controls: [ ] Each dwelling unit has at lesat one thermostat capable of automatically adjusting the-space temperature set point of the largest zone. Electric Systems: [ ] Separate electric meters are required for each dwelling unit. Fireplaces: [ ] Fireplaces must be installed with tight fitting non-combustible fireplace doors. [ ] Fireplaces must be provided with a source of combustion air,as required by the Fireplace construction provisions of the Building Code of New.York State,the Residential Code of New York State or the New York City Building Code,as applicable. Service Water Heating: [ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or is part of a circulating system. [ ] Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: [ ] Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: [ ] All heated swimming pools must have an on/off heater switch and require a cover unless over 20% of the heating energy is from non-depletable sources. Pool pumps require a time clock. Heating and Cooling Piping Ins lution: [ ] HVAC piping conveying fluids above 105 or chilled fluids below 55 must be insulated to the levels in Fable 2. r Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes. Insulation Thickness in Inches by Pipe Sizes Heated Water Non-Circulating Runouts Circulating Mains and Runouts Temperature(F) U�to 1" Up to 1.25" 1.5"to 2.0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-160 0.5 0.5 1.0 1.5 100-130 0.5 0.5 0.5 1.0 Table 2: Minimum Insulation Thickness for HVAC Pipes. Fluid Temp. Insulation Thickness in Inches by Pipe Sizes Piping System Types Range, F 2"Runouts' 1"and Less 1.25"to 2" 2.5"to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1:0 1.5 Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 .1.0 and Brine Below 40 1.10 1.0 1.5 1.5 NOTES TO FIELD(Building Department Use Only)