Site Plan MapsHutchins Engineering PLLC
OHOHOHOH OH OH OH OH OH OH
OHOHOHOHOH OH OH OH OH OH
OH
X X X
OH OH OH OH OH OH
OH OH OH OH OH OH
OH OH OH OH OH OH
OH OH OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH
OH OH
OH OH OH OH OH OHXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHOH
OH OH OH OH OH OH
OH OH OH OH OHWWFM
FM
FM
FM
FMFMFMFMFMFMFMFMFMFMFMFMFMFM
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
OHOHOHOHOHOHOHOH OH
OHOHOHOH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH OH
OH OH OH OH OH OH OH OH OH OHXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHOHOHOH
OH OH OH OH OH OH OH OH OH OH OH OH
FM FM FM
FM
FM
FM
FM
FM
FM
FM
FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMSFSF
SF SF SF SF SF SF SF
SFSFSF
SF
SF SFSFSFSFCall Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
OHOHOHOHOHOHOHOHOHOHOHOHOHOHOHOH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH OH OH OH OH OHXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXOHOHOHOHOHOHOHOH
FM FM FM FM FM FM
FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMSFSFSFSFSF
SF SF SF SF SF SF SF SF SF
SFSF SF SF
SF
SF
SF
SF SFSFSFSFSFSFSFSFSFSFCall Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
OHOHOHOHOH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
OH OH OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH
OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH
FM FM FM FM FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
F
MSFSFSFSFSF
SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
Drawing Not To Scale
1.Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary
application of lime, fertilizer, and
seed.
2.Begin at the top of the slope by
anchoring the RECPs in a
6"(15cm) deep X 6"(15cm) wide
trench with approximately 12"
(30cm) of RECPs extended beyond
the up-slope portion of the trench.
Anchor the RECPs with a row of
staples/stakes approximately 12"
(30cm) apart in the bottom of the
trench. Backfill and compact the
trench after stapling. Apply seed to
the compacted soil and fold the
remaining 12"(30cm) portion of
RECPs back over the seed and
compacted soil. Secure RECPs
over compacted soil with a row
of staples/stakes spaced
approximately 12"(30cm) apart
across the width of the RECPs.
3.Roll the RECPs (A) down or (B)
horizontally across the slope.
RECPs will unroll with appropriate
side against the soil surface. All
RECPs must be securely fastened
to soil surface by placing
staples/stakes in appropriate
locations as shown in the staple
pattern guide.
4.The edges of parallel RECPs must
be stapled with approximately 2" -
5" (5-12.5cm) overlap depending
on the RECPs type.
5.Consecutive RECPs spliced down
the slope must be end over end
(Shingle style) with an approximate
3"(7.5cm) overlap. Staple through
overlapped area, approximately
12"(30cm) apart across entire
RECPs width.
Drawn on: 3-16-11
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
2"-5"
(5-12.5cm)
3B
4
2
5
1
3A
12"(30cm)
6"
(15cm)
6"
(15cm)
*NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the RECP's.
3"(7.5cm)
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-772-2040
www.tensarnagreen.com
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC
Call Before You Dig
Wait The Required Time
Confirm Utility Response
Respect The Marks
Dig With Care
800-962-7962
www.digsafelynewyork.com
Dig
New York
Hutchins Engineering PLLC