JB201133.0060.Concrete Compressive Strength Test.2021-01-05.Rpt.0060Rev1Report Number:
Service Date:
Report Date:
Task:
Client
Queensbury, NY 12804
Bay Road and Blind Rock Road
Fowler Square SI and CMTRosetti Acquisitions LLC
Attn: Christopher Falvey
427 New Karner Rd
Albany, NY 12205
518-266-0310
Albany, NY 12203-5169
30 Corporate Cir Ste 201
JB201133.0060
01/05/21
02/02/21 Revision 1 - 28-day results
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Project
Project Number: JB201133
Specified Strength:28 days
Mix ID:
Supplier:
Batch Time:
Truck No.:
35000
Pallette Stone
Material Information
0630
4907
Plant:
Ticket No.:844377
Field Test Data
Test
Air Content (%):
Result Specification
5 1/2 4 - 6
5.2 4.5 - 7.5
58 40 - 95
3,500
Slump (in):
psi @
Concrete Temp. (F):
Ambient Temp. (F):
Plastic Unit Wt. (pcf):
Yield (Cu. Yds.):
Sample Information
Sample Date:
Sampled By:
Weather Conditions:
Sample Time:01/05/21 0730
Bryan Smith
Overcast and Cool
11 11
Sample taken when pouring the Pier
located at point (17.66,T.2)
Sample Location:
Placement Method:Chute
Water Added Before (gal):
Water Added After (gal):
Accumulative Yards:Batch Size (cy):
Piers at points (15.5,T.5), (16.2,T.5),
(16.66,T.5), (17.66,T.2), (18.1,T.2),
(18.5,T.2), (16.75,E), (17.2,E),
(17.5,E), (18.5,E), and (19,E)
Placement Location:
Laboratory Test Data
Set Avg Diam.Area Weight DateDate Test
Age at
Load
Maximum
Strength
Compressive
Fracture
No.ID
Specimen
Received Tested (days)Type(in)(sq in)(lbs)(psi)
Tested
By(lbs)
1 A 4.00 12.57 01/06/21 8.40 01/12/21 7 45,540 2 3,620 ADB
1 B 4.00 12.57 01/06/21 8.45 02/02/21 28 58,640 2 4,670 ADB
1 C 4.00 12.57 01/06/21 8.45 02/02/21 28 55,650 2 4,430 ADB
1 D 4.00 12.57 01/06/21 8.40 02/02/21 28 56,020 6 4,460 ADB
Average (28 days) 4,520
1 E 01/06/21 8.45 Hold
1 F 01/06/21 8.50 Hold
Initial Cure:Final Cure:Onsite Cooler Moist Room
Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Samples Made By: Dente Group - A Terracon Co.
Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services:
Reported To:
Contractor:
Report Distribution:
(1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas
(1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax
(1) BBL Construction Services, Ryan Etue (1) Galusha & Sons LLC, Drew Stevens
(1) Galusha & Sons LLC, James Campagnone
Jared Hall
Staff Geologist
Bobby w/ BBL & Galusha Reps
Reviewed By:
ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods:
Dente Group - A Terracon Co. Rep.: Bryan Smith
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Page 1 of 1CR0001, 11-16-12, Rev.6