Loading...
JB201133.0101.Field Density Testing.2021-02-08.Rpt.0101FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0101 02/08/21 02/09/21 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Lab Test Data (%) Compaction Project Requirements (%) Content Water No. Mat. Material Information Density Max. Lab (%) Content Water Optimum Ref. No. Proctor Laboratory Classification and Description (pcf)Test Method Min 95.01101.313.2JB201133.0001B Silty sand ASTM D1557 2 107.015.5JB201133.0019B Silty sand ASTM D1557 Field Test Data No.Test Location Elev.No. Test Lift /Mat.Depth Density Probe Wet Content Water (%) Content Water Density Dry (%) Percent Compaction (in)(pcf)(pcf)(pcf) Inside building: section between line 28-33-A-D 1 9' North of pier located at 28.C TFW -4'1 8 106.0 7.1 7.2 98.9 97.6 2 4' North & 3' East of pier located at 31.A TFW -4'1 8 112.0 9.9 9.7 102.1 100+ 3 At the center of section between line B-C-28-33 TFW -3'1 12 109.3 9.2 9.2 100.1 98.8 4 6' North & 5' East of pier located at 31.A TFW -2'1 10 112.7 11.0 10.8 101.7 100+ 5 At the center of section between line B-C-28-33 TFW -2'1 10 111.4 10.8 10.7 100.6 99.3 6 10' North & 4' West of pier located at 29.D TFW -1'1 10 110.2 8.0 7.8 102.2 100+ Outside envelope of foundation wall 7 3' South of pier located at 30.E TFW -3'1 8 113.1 11.2 11.0 101.9 100+ 8 3' South of pier located at 28.C TFW -2'1 10 110.0 8.6 8.5 101.4 100+ 9 2' South & 3' West of pier located at 31.A TFW -2'1 10 114.2 14.0 14.0 100.2 98.9 10 2' South & 8' West of pier located at 28.C TFW -1'1 10 111.3 9.3 9.1 102.0 100+ 11 3' South of pier located at 29.D TFW -1'1 10 111.9 9.9 9.7 102.0 100+ 12 12' North & 2' West of pier located at 33.A TFW -3'1 10 112.5 12.2 12.2 100.3 99.0 13 2' North of pier located at 39.N TFW -4'1 8 104.4 7.4 7.6 97.0 95.8 14 7' West of pier located at 33.A TFW -1'1 12 107.4 10.6 11.0 96.8 95.6 15 3' North & 7' West of pier located at 39.N TFW -1'1 12 110.8 10.7 10.7 100.1 98.8 16 2' North & 15' East of pier located at 39.N TFW -2'1 10 107.5 11.0 11.4 96.5 95.3 Comments: Datum:TFW: Top of Foundation Wall Std. Cnt. M:Std. Cnt. D:1798589 Test and/or retest results on this report meet project requirements as noted above. Last Cal. Date:Model:Make:S/N:24855 Troxler 3430 02/27/2020 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 1 of 2 FIELD DENSITY TEST REPORT Report Number: Service Date: Report Date: Task: JB201133.0101 02/08/21 02/09/21 30 Corporate Cir Ste 201 Albany, NY 12203-5169 518-266-0310 Client Rosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 Fowler Square SI and CMT Bay Road and Blind Rock Road Queensbury, NY 12804 Project Project Number: JB201133 Deviation on Friday 02/05/2021: Resolved. On Friday, material was observed to be unstable when compacted with was used for the structural fill of the foundation wall’s outside envelope (area around pier 39.N). On Monday 02/08/2021, material was removed down to 5 feet below top of foundation wall, and was replaced in controlled lifts and tested for compaction with results that met or exceeded the site requirements Area fixed: Outside envelope of the foundation wall from point 39.K to point 39.S. Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Services: Reported To: Contractor: Bobby w. BBL M. McHenry Materials Department Manager Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Reviewed By: Dente Group - A Terracon Co. Rep.: Christian Makasi ASTM D6938Test Methods: The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0007, 11-16-12, Rev.7 Page 2 of 2