Schiavone MODIFICATION 2010 �Now*
1 4W cbtL
SUB 4-03_Tra-Tom Mod_102009
RESOLUTION TO APPROVE MODIFICATION TO SUBDIVISION 4-2003 TRA-TOM DEVELOPMENT
1. A subdivision application has been made to the Queensbury Planning Board for the following:
2. A public hearing is not required for a modification;and
3. This application is supported with all documentation,public comment and application material in the file of record;and
4. MOTION TO APPROVE MODIFICATION TO SUBDIVISION NO.4-2003 TRA-TOM DEVELOPMENT, Introduced by
Gretchen Steffan who moved for its adoption,seconded by Thomas Ford:
According to the resolution prepared by Staff. Paragraph Four A complies. Paragraph, we considered and
reaffirmed the Negative Declaration on SEQRA. The applicant has not asked for waivers. So Paragraph Four D
does not apply.
a) Pursuant to relevant sections of the Town of Queensbury Zoning Code[Chapter A-183],the Planning Board
has determined that this proposal complies with the requirements as stated in the Zoning Code;and
b) The application is a modification,the requirements of the State Environmental Quality Review Act have been
considered, and the proposed modification[s]do not result in any new or significantly different environmental impacts,
and,therefore,no further SEQRA review is necessary;and
c) Final approved plans, in compliance with the Subdivision, must be submitted to the Community
Development Department before any further review by the Zoning Administrator or Building and Codes personnel.
The applicant must meet with Staff after approval and prior to issuance of Building Permit and/or the beginning of any
site work. Subsequent issuance of further permits, including building permits is dependent on compliance with this
and all other conditions of this resolution;and
d) NOT APPLICABLE. Waiver requests
e) The limits of clearing will constitute a no-cut buffer zone, orange construction fencing shall be installed
around these areas and field verified by Community Development staff
f) Engineering sign-off required prior to signature of Planning Board Chairman.
g) As-built plans to certify that the subdivision is developed according to the approved plans to be provided
prior to issuance of the certificate of occupancy;and
h) If applicable, Item h to be combined with a letter of credit;and
i) The applicant shall submit a copy of a NOI [Notice of Intent]SWPPP[Stormwater Pollution Prevention Plan]
&NOT[Notice of Termination]-see staff
j) The applicant shall submit a copy of a NYS SPDES permit[State Pollution Discharge Elimination System]
k) All previous conditions of approval apply.
1) This is approved with two conditions.
1. That the applicant will change Lupine Way to Richmond Hill Drive on the revised plat.
2. And will clarify why Lots 18 and 19 are without a 25 no cut buffer zone to our Community
Development Department.
Duly adopted this 20t' day of October, 2009, by the following vote:
AYES: Mr.Traver, Mr.Krebs, Mr.Sipp,Mr. Seguljic, Mr. Ford, Mrs.Steffan,Mr. Hunsinger
NOES: NONE
atNa
Cc: Nace Engineering 00
13
co
" Home of Natural Beauty .., A Good Place to o�
IZ
IIIII
MAP REFERENCE:
MAP OF A SURVEY MADE FOR A
ANNE L. BETTERS W
DATED FEBRUARY 29. 1980
BY JOHN B. VAN DUSEN
LAND SURVEYORS
1GONdTIC
ILI
I_
Z3 . -
G
AUK U w
Z V)
omL) z
- M0
E A .,, s
Zro
Ex-� AA
NO CUT
ZONE
CB028 RIM-898.02 -
/ Noe°on's • � n�
/ \ ,u;;::•:.ti 8 :::i�9 c:.. N `41100°E
.... .....
\ 0e.7 47,so N07°15 oo•E -a ! sY�
h I r N05 49 00°g
gR
�N W� °.-°��, � o� ,� h $ � N06°28'30'E �°+ �✓ � 5 ���� ��
`a°c a $ o a.e o j° '• / 39 43r.38' s �r8 Q+� 40 44 N06°18'30'E ° QQ1! �'
C.B.RIM-88.54 20 .81'. N06 dr'00°E- - � Qt3R6R
A9 w . 80.83' N06°2B'QQ°F
49j. �O \ \ \ ! 41 42 286.77'
.p 1"T�/ lJ 00 °E
'd \ \� 3�, La84.84' / `.' '�••+a 87 . . . . . . . • . . . . .. . . . . . 2� '30
y®SO. 88•32' • • . . . • • • 25 • • • . . . • . • . . . • • . . . w . • . . . . 4' w • NOB°�+ .
Ww7 RIM-87.84 1� \ 8°, r ° �+ 6 00 Q
S 3 MMM�111 9N?
1Nv-79.s4 WETLANDS. FLAGGED BY O.E.O. 2rs.e4'
/ �g NOS°t�° 27 221,398 eq.ft. o '^`-"•- 1 Q
La61.87 E w .�1
°°902• 6'00' 60.00'L•.` s s 1 w ,9@ `0 29 28 • w . 6.08 acres • C3 W
Lj
?S.9 0r�y�, aA a� 3 .ta ?� zs . . . . ^ ° p ta.
/ 6 ep9. +4 s .. . . Z Z
W' 22 . . . 9 8 • 7 2 . . . . , . (/ w M Ld a+ `gym " ( `� �a " 11' -/1 . 10 f '°a Q
eu•= `r�" � •,� �`�' e a 1$ 'R'i$� pro o� s �.� � z1
� 1 f rnl F-- W
/ LOT 13 N O w �.o .oi �
k) r j - -,.
/ *C 20,732 sq.ft. ®'F 1 �"a t� i5 k 20. . " _ ..i
q OD
t.. 0.48 acres r. i \ ' -40 7 , r.N. LOT 2l� • 'g, 100 SCTdACK \ a >" N QI Gr
LOT 28 S;• t.... -_ J o '" ` 30 423 8q,ft. I i, 19 . 12 FROM WETLANDS \ �,) /*� Q _,.1
sQ•ft. >r OQ...;... f �i a ' m ^ I �.1I W 0 BQ w
NO3 3 0 �°W a 20+071 cr :::rtig 0. . ., &tl.::::;:... J 0.70 acr�a y f \ N LX '.•J M
o . 192.49' I- c 0.46 acres .y1 / N08° S't.;•iht OfTc 6:.Q@):.:: ...... \ 18 �\ i ` Z C3 W
12 1 >�5131 00� N08o4,� \� r/14 / � ~ > (yl
LOT ft, 2 �c, ( I ' 3o WIDE r2s.oo' 200, o Is / / •!� r W =
24�BTT %, $e ' N CUT -� f76.00' / Q °tf Ri
y 0.58 acres 1pt '�1� d� et N,R $ ' ZPNE� i 1 0 ..... S08°43'00°W f PART OF LOT 1 \ / 0- ~ e °�
°w `,,� �• Ire $ ' $$ $ - `7 ! - / 1,123,183. aq.ft. p.y l�
ews a wzffm as 1 a:. 0 / o o '* ' o"d o ^, $ + `° l ' \ 25.78 acres ` -
sraa SEM-x'aar /1 '� o N g9 J �o,. 'i. 8e _
/'(�.� .C@? y� "tO „ ^ all
O A
r6,o �-� r f ��e$� o h g N $ �&/ NOTE W
30'WIDE DRAINAGE y ®a ' 0 o `o �' $ l7 LLB Y '4i
ty, 100,OD, '�--f (, � v d N 414 �°• � �- THE POR710N OF LOT ak`I WEST OF THE PROPOSED �i
2 t EASEMENT TO BE CENTERED ,0 f00 " f �o c v a t^ SUBOMSION ROAD IS TO BE DEED RESTRICTED
� 6 a � !Q . 0 � o � m �
l ON 86,NEW STORM " p� ° '90•S6 S08°43�W°W �,+,.�00 ���� q f- ` J jZ NQ c FROM ANY FURTHER SUBDIVISION ¢
,o 100
/ DESCRIBED AFTER PIPE 1S / ^ i •4a '4g Lis�6��i��' -J <�� Q Q
INSTALLED. 0 12 106. ��CyMON �O 0 726. :u Z
A°"*�61b �� 3 ros.00' rob. Nos° E H� sos°�,�"W 12
,� Ir=1
Uj
_ vtk0 /o h�` Q�09 /O �+'h 3 f06.0°`0 ti . �� Lo act ...� Q ~
_ - aZ r /` voa�� �° */ h P $ ! ____ eo.00' ��o ,yb�27, ¢4s.82+ O Q Z l0
•tz, / �`* ti v ' ^ g' _ ��e�n fo D/Q� ° oo'w O z c
b H�
.... ...•.:::,...... / /., 1b y• •~ N08 4*1 Q =
4t
,;.,.. ............. 2 a r r .i off••� � /�, � +�•+" L.�. Q
�^ •is•?v':•:v:•t::ititiCCiiti•::•:':::. C 1 , �F tl• O ^ h 0. h G. p, q 448. + 9,a 7 ►^.♦ E-
... .............. ....
... ............. ......
.......... ........... pp
C1A25 RIM-84.80 ...... .. cy N ' J y' 1� ' $� !h q
�V
W.OUT-60-70
1W.IN.81.00 ..:ic:::..•:.,.•:.:.•::'
......... ......................................
............ .. ................... 9
30 WIDE DRAINAGE .... .. .....:::... . . . ..� .�::....... o o � � ^ v^M ' $ 25 WIDE NO CUT A`?B � OD
F-
EASEMENT-CENTERED r.:::::.;..: ?+� ;.; :::';.;:.: a v a ��; ;a o w h ZONE TO BE RECORDED <orS ?so Z Q
....... . ::::::..
" IN INDMDU 4.
....... .. ,.,.. ... .. .. ! ! ,. AL DEEDS a0+ �
ON PROPERTY LINE •:i::::nc::'..::::•: (� �' N" � �` r�i � Q
.'.:::;i' f:;:::.i}:. is 4 Gr::::•:':.; g w 2 PART OF LOT r _j �- V
35'WIDE NO CUT ::: ...... h 143,236. 8q.ft.
... ................ .
W J ^ -
DEVELOPER SHALL POST A S08°43'Op. : ::;;:;{?y:: :i:::::.
ZONE TO BE RECORDED W DD0...... ::{' :::: 3.28 sores _ py
°NO•CUT°SIGN M THE CENTER IN INDIUVIDUAL DEEDS 60'00' : :. :°:,:e:Y W ~ ® O
OF EACH LOT AT THE EDGE
OF THE NO-CUT BUFFER ADDMONAL 100'POST �j e W Ld �► Zj
SIGN TO MAD
8t RAIL FENCE 7i0 B (/� N, r�
BEGINNING OF 25'NO CUTZONE INSTALLED BY DEVELOPER o �y ° ,9, pq Q r0
PROTECTED KARNER HABITAT cn ®% a FENCE E r��, SOB°43 00.W $, o. ;� �-- H W
DO NOT DEPOSIT ANY C � INSTALLED BY ,.gLd
VEGETATION OR OTHER MATERIALS ARF'1 f DEVELOPER S Off, A b` w 94.8000 w V S
BEYOND THIS POINT. NMPCAPPROVED f AAG $a sos 43' . °
BARRIER W/VEHICULAR f RA� �"`
ACCESS GATE(typ.for 2) f ! O POVE,R CO$POD4TIOX
�'�- s�o. � � Z o J �► �
cn
1 ! ADDITIONAL
NITI O a 100 v BY
O'er A C)
I
I DEV LG RUN FENCE
� ROW.
Q f N61°44'00°w 'POW.
25.00'
THIS DRAWING HAS BEEN REDUCED
g�
DO NOT SCALE IF ACCURATE '' ,
PLANNING BOARD APPROVAL DIMENSIONS ARE REQUIRED
PmbW• ,�, �e�sa,tu�►t�,�oaa
N"wrM2
Approved Under Authority of POWERLINE LAND USE RESTRICTIONS ZONING INFORMATION '
a Resolution Adopted October 20, 2009 THE DEEDS FOR ALL LOTS IN THIS SUBDIVISION TOTAL AREA 49.87 acres Refill
by the Planning Board of the SHALL CONTAIN LANGUAGE PROHIBITING � �ooa
DUMPING, SR-lA AREA OF ROADS 4
a
A MINIMUM LOT SIZE OF ONE 10,000 sq. ft: 4.11 acres � V.X000
DUMPING OF YARD WASTE, AND UNAUTHORIZED REQUIRED FOR CLUSTERING wEnANDS
To of IQ ensbury, New York. ACCESS OF ANY KIND (INCLUDING, BUT NOT SETBACKS: 5 08 acres-existing
C Chairman RESTRICTED TO MOTORIZED VEHICLE ACCESS) TO FRONT 30' 0.62 acres-proposed mitigation OWNER APPLICANT sow TWW
~ NIAGARA MOHAWK POWER COMPANY LANDS. ANNEL• BETTERS
Date Signed �"emA�k Z2-,�... 2009 SIDE 10 min total Of 30 DENSTi1'FOR LOTS THOMAS21 WEST OUNTAIN R sutv�r Dwc NO. o2oso
OAD
REAR 20' 40.06 acres=40 LOTS COPELAND
ANN SEW YORKD 1 QUEENSBURY NEW YORK ....
0..
` w•.w _".. PHONE(518)793-9420 PHONE(518)792.39332
SShoat 2 of 8
E-93
ENGtt. DWG. No. 4Gi7o-2
4-2 Mod ,