Loading...
JB201133.0106.Structural Steel Observations.2021-02-12.Rpt.0106STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:JB201133.0106 Service Date:02/12/21 30 Corporate Cir Ste 201 Report Date:02/15/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. J2-SteelCR-2016-01-08,Rev.1 Page 1 of 3 Visited site to perform observation and testing of structural connections: Upon arrival, observed the following items: Framing Level:1st Floor Framing Area/Gridlines:Between grid lines A - T/ 1 -19 (south) Item #Description Details 1 Connection Type:Column to Foundation Status:Final connection observations snug tight calibrated impact wrench Reference Detail(s):Approved drawings (fabrication and structural) Discrepancies:none observed Notes / Exceptions:Anchor bolts were observed to be installed (with nut and washer) and tightened at the above referenced locations. These anchor bolts appeared to be in general compliance with the contract documents. Framing Level:1st Floor Framing Area/Gridlines:Between grid lines A - T/ 1 -19 (south) Item #Description Details 2 Connection Type:Tube Steel Wind Girt to Column Status:Final connection observations fillet smaw Reference Detail(s):Approved drawings (fabrication and structural) Discrepancies:none observed Notes / Exceptions:HSS wind girt brace frames were observed to be installed and welded (top and bottom connections) at the above referenced locations. These welds appeared to be in general compliance with the contract documents. Framing Level:2nd Floor Framing Area/Gridlines:Between grid lines A - T/ 1 -19 (south) Item #Description Details 3 Connection Type:Beam to Column and Beam to Beam Status:Final connection observations snug tight tension-control fasteners Reference Detail(s):Approved drawings (fabrication and structural) Discrepancies:none observed Notes / Exceptions:Structural bolted connections were observed to been installed and tightened at the above referenced locations. These bolts appeared to be in general compliance with the contract documents. STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:JB201133.0106 Service Date:02/12/21 30 Corporate Cir Ste 201 Report Date:02/15/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. J2-SteelCR-2016-01-08,Rev.1 Page 2 of 3 Framing Level:2nd Floor Framing Area/Gridlines:Between grid lines A - T/ 1 -19 (south) Item #Description Details 4 Connection Type: Floor deck Status:Final connection observations tek screw Reference Detail(s):Approved drawings (fabrication and structural) Discrepancies:none observed Notes / Exceptions:Second level floor decking was observed to be installed and fastened (PAF and TEK screws) at the above referenced locations. This deck appeared to be in general compliance with the contract documents. Framing Level: Area/Gridlines: Item #Description Details Connection Type: Status: Reference Detail(s): Discrepancies: Notes / Exceptions: Framing Level: Area/Gridlines: Item #Description Details Connection Type: Status: Reference Detail(s): Discrepancies: Notes / Exceptions: Framing Level: Area/Gridlines: Item #Description Details Connection Type: Status: Reference Detail(s): Discrepancies: Notes / Exceptions: STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:JB201133.0106 Service Date:02/12/21 30 Corporate Cir Ste 201 Report Date:02/15/21 Albany, NY 12203-5169 518-266-0310 Client Project Rosetti Acquisitions LLC Fowler Square SI and CMT Attn: Christopher Falvey Bay Road and Blind Rock Road 427 New Karner Rd Queensbury, NY 12804 Albany, NY 12205 Project Number: JB201133 Services: Observe structural steel activities as requested in general accordance with project specifications and/or client request(s). Dente Group - A Terracon Co. Rep.: F. Torre, CWI Reported To: Contractor:Tri City Steel/Troy Iron Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas(1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax Reviewed By:____________________________________ (1) BBL Construction Services, Ryan Etue (1) Galusha & Sons LLC, Drew Stevens M. McHenry (1) Galusha & Sons LLC, James Campagnone Materials Department Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. J2-SteelCR-2016-01-08,Rev.1 Page 3 of 3 Items referenced above were field connections unless otherwise noted. Connections were visually observed to be in general accordance with the referenced details of the project plans and specifications unless noted in the Discrepancies section. Discrepancies, if any, are further detailed on the attached Discrepancy List. Additional Remarks: BD000P, 08-24-13, Rev.1 Selec t Picture Selec t Picture Selec t Pic ture Select Pic ture Photo No. 1 South section Photo No. 2 Bolted connections (typical) Photo No. 3 Anchor bolts (typical)Photo No. 4 HSS brace frame weld (typical T&B) Project Number:JB201133Fowler Square SI and CMT Report Number:JB201133.0106 Bay Road and Blind Rock Road Technician:F. Torre, CWI 30 Corporate Cir Ste 201 Queensbury, NY 12804 Date:02/12/21 Albany, NY 12203-5169 Scale:Not to Scale 518-266-0310 BD000P, 08-24-13, Rev.1 Selec t Picture Selec t Picture Selec t Pic ture Select Pic ture Photo No. 5 After welds received approved zinc based primer (typical)Photo No. 6 PAF fasteners penetration (typical) (Photo No.)(Enter caption.)(Photo No.)(Enter caption.) Project Number:JB201133Fowler Square SI and CMT Report Number:JB201133.0106 Bay Road and Blind Rock Road Technician:F. Torre, CWI 30 Corporate Cir Ste 201 Queensbury, NY 12804 Date:02/12/21 Albany, NY 12203-5169 Scale:Not to Scale 518-266-0310