Loading...
JB201133.0088.Concrete Compressive Strength Test.2021-01-22.Rpt.0088Rev2 (2)Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201* Report Contains Deviation(s)JB201133.0088 01/22/21 02/19/21 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 35000 Jointa Galusha, L.L.C Material Information 1145 4904 Plant: Ticket No.: Glens Falls 844667 Field Test Data Test Air Content (%): Result Specification 4 4 - 6 4.0 4.5 - 7.5 64 40 - 95 32 * * = Field Test Results do not meet project specifications. 3,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:01/22/21 1222 Christian Makasi Cloudy 10.5 10.5 End of truckSample Location: Placement Method:Direct Discharge Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Building perimeter footing (line 39 from N to A; A from 39 to 28; 28 from A to F) including spread footings around perimeter. Footings at Q.35, Q.32, L.35, L.34. Piers(3) located at the North-East corner of the building (outside perimeter). Placement Location: Laboratory Test Data Set Avg Diam.Area Weight DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By(lbs) 1 A 4.00 12.57 01/25/21 8.70 01/29/21 7 54,750 3 4,360 ADB 1 B 4.01 12.63 01/25/21 8.75 02/19/21 28 63,570 2 5,030 ADB 1 C 4.01 12.63 01/25/21 8.70 02/19/21 28 61,480 2 4,870 ADB 1 D 4.01 12.63 01/25/21 8.75 02/19/21 28 63,080 2 4,990 ADB Average (28 days) 4,970 1 E 01/25/21 8.75 Hold 1 F 01/25/21 8.70 Hold Initial Cure:Final Cure:Onsite Cooler Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. 3500psi Concrete - Foundation Walls, Footings, Exterior. Hot Water. Non-Chloride 2%. Mid Range Water-Reducer Samples Made By: Dente Group - A Terracon Co. Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services: Reported To: Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Bobby w. BBL ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Dente Group - A Terracon Co. Rep.: Christian Makasi The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 3CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201 JB201133.0088 01/22/21 02/19/21 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 35000 Jointa Galusha, L.L.C Material Information 1302 4912 Plant: Ticket No.: Glens Falls 844671 Field Test Data Test Air Content (%): Result Specification 6 4 - 6 4.9 4.5 - 7.5 69 40 - 95 34 3,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:01/22/21 1354 Christian Makasi Cloudy 51 10 End of hoseSample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Building perimeter footing (line 39 from N to A; A from 39 to 28; 28 from A to F) including spread footings around perimeter. Footings at Q.35, Q.32, L.35, L.34. Piers(3) located at the North-East corner of the building (outside perimeter). Placement Location: Laboratory Test Data Set Avg Diam.Area Weight DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By(lbs) 2 A 4.00 12.57 01/25/21 8.60 01/29/21 7 46,270 2 3,680 ADB 2 B 4.01 12.63 01/25/21 8.60 02/19/21 28 56,830 2 4,500 ADB 2 C 4.01 12.63 01/25/21 8.60 02/19/21 28 55,500 2 4,390 ADB 2 D 4.01 12.63 01/25/21 8.60 02/19/21 28 58,330 2 4,620 ADB Average (28 days) 4,500 2 E 01/25/21 8.60 Hold 2 F 01/25/21 8.60 Hold Initial Cure:Final Cure:Onsite Cooler Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. 3500psi Concrete - Foundation Walls, Footings, Exterior. Hot Water. Non-Chloride 2%. Mid Range Water-Reducer Concrete foreman was informed about the low air when pouring. The first truck was fully used. The second truck was tested, and its air was also low (4.2%). The second truck was fully used. The third truck was tested, and air was within range (5.1%). PM was informed about the situation. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 3CR0001, 11-16-12, Rev.6 Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201 JB201133.0088 01/22/21 02/19/21 Revision 2 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Samples Made By: Dente Group - A Terracon Co. Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services: Reported To: Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Jared Hall Staff Geologist Bobby w. BBL Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Dente Group - A Terracon Co. Rep.: Christian Makasi The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 of 3CR0001, 11-16-12, Rev.6