Signed Inspection Report (Tue Feb 23, 2021 at 222 PM)INSPECTION WORKSHEET (COMFIN-008437-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0813-2020 Case Module:Permit
Inspection Date:Tue Feb 23, 2021 Inspection Status:Passed
Inspector:O'Brien, John Inspection Type:Commercial Final Inspection
Job Address:Parcel Number:736 GLEN ST
Queensbury, NY, 12804
302.6-1-53
Contact Type Company Name Name
Applicant Hayes, John
Primary Owner Plaza Glen, LP Dembrowski, Paul
Granted Permission Sherwin Williams
Contractor Kucel Contractors Inc
Checklist Item Status
Building Inspector Notes Passed
2/17/21 Final Inspection Not Approved
DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA:
- Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping.
The product you want is made by BOSS PRODUCTS.
- Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides.
- Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor.
- Seal bottom of demise walls on both sides with an approved fire caulk.
2/23/21 Final Inspection Approved - Ok to issue CO!
- All demise wall penetrations and joints sealed with BOSS 813 fire rated foam.
Feb 23, 2021 Page (1)
INSPECTION WORKSHEET (COMFIN-008437-2021)
Checklist Item Status
Stockroom /Storage/Receiving/Shipping Room Passed
2/17/21 Final Inspection Not Approved
DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA:
- Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping.
The product you want is made by BOSS PRODUCTS.
- Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides.
- Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor.
- Seal bottom of demise walls on both sides with an approved fire caulk.
2/23/21 Final Inspection Approved - Ok to issue CO!
- All demise wall penetrations and joints sealed with BOSS 813 fire rated foam.
OK to Issue C/O Passed
2/17/21 Final Inspection Not Approved
DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA:
- Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping.
The product you want is made by BOSS PRODUCTS.
- Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides.
- Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor.
- Seal bottom of demise walls on both sides with an approved fire caulk.
2/23/21 Final Inspection Approved - Ok to issue CO!
- All demise wall penetrations and joints sealed with BOSS 813 fire rated foam.
Feb 23, 2021 Page (2)
O'Brien, John