Loading...
Signed Inspection Report (Tue Feb 23, 2021 at 222 PM)INSPECTION WORKSHEET (COMFIN-008437-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0813-2020 Case Module:Permit Inspection Date:Tue Feb 23, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Commercial Final Inspection Job Address:Parcel Number:736 GLEN ST Queensbury, NY, 12804 302.6-1-53 Contact Type Company Name Name Applicant Hayes, John Primary Owner Plaza Glen, LP Dembrowski, Paul Granted Permission Sherwin Williams Contractor Kucel Contractors Inc Checklist Item Status Building Inspector Notes Passed 2/17/21 Final Inspection Not Approved DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA: - Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping. The product you want is made by BOSS PRODUCTS. - Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides. - Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor. - Seal bottom of demise walls on both sides with an approved fire caulk. 2/23/21 Final Inspection Approved - Ok to issue CO! - All demise wall penetrations and joints sealed with BOSS 813 fire rated foam. Feb 23, 2021 Page (1) INSPECTION WORKSHEET (COMFIN-008437-2021) Checklist Item Status Stockroom /Storage/Receiving/Shipping Room Passed 2/17/21 Final Inspection Not Approved DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA: - Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping. The product you want is made by BOSS PRODUCTS. - Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides. - Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor. - Seal bottom of demise walls on both sides with an approved fire caulk. 2/23/21 Final Inspection Approved - Ok to issue CO! - All demise wall penetrations and joints sealed with BOSS 813 fire rated foam. OK to Issue C/O Passed 2/17/21 Final Inspection Not Approved DEMISE WALLS AT NEW OVERHEAD DOOR LOADING AREA: - Remove fire foam from around the bar joists on both sides of wall. The foam is for wood framing firestopping. The product you want is made by BOSS PRODUCTS. - Seal all penetrations through demise walls with an approved fire caulk or Boss Products fire foam on both sides. - Demise wall next to overhead door needs to be filled in with sheetrock and fire taped at concrete floor. - Seal bottom of demise walls on both sides with an approved fire caulk. 2/23/21 Final Inspection Approved - Ok to issue CO! - All demise wall penetrations and joints sealed with BOSS 813 fire rated foam. Feb 23, 2021 Page (2) O'Brien, John