Loading...
Signed Inspection Report (Fri Jan 29, 2021 at 929 AM)INSPECTION WORKSHEET (RPLUM-007976-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0793-2020 Case Module:Permit Inspection Date:Fri Jan 29, 2021 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Rough Plumbing Job Address:Parcel Number:75 CAREY RD Queensbury, NY, 12804 308.20-1-3.3 Contact Type Company Name Name Engineer Bergeron, Mark Applicant O'Connor, Mike Granted Permission Alltek Energy Systems Inc Primary Owner Okie Properties, LLC Contractor Alltek Energy Systems Inc Checklist Item Status Building Inspector Notes Failed 1/15/21 Plumbing Under Slab Partial Approval - The new location of the handicapped bathroom and laundry drain is approved - An infloor oil separator will be required due to the installation of trench drains at the original location of the handicapped bathroom. Once the oil separator is installed call for inspection and also send the specifications on the unit to be installed Plumbing Under Slab Passed 1/15/21 Plumbing Under Slab Partial Approval - The new location of the handicapped bathroom and laundry drain is approved - An infloor oil separator will be required due to the installation of trench drains at the original location of the handicapped bathroom. Once the oil separator is installed call for inspection and also send the specifications on the unit to be installed. 1/29/21 verified trench drains/oil separator, provide specifications as noted from previous inspection. Rough Plumbing / Nail Plates Failed Jan 29, 2021 Page (1) INSPECTION WORKSHEET (RPLUM-007976-2021) Checklist Item Status Plumbing Vent Vents in Place Failed 3" Vent Through Roof Failed 1 ½ inch minimum Drain Size Failed Shower liner test (2" of water)Failed Washing Machine Drain 2 inch minimum Failed Washing Machine Trap: 18"-42" discharge Failed Cleanout every 100 feet change of direction Failed Pressure Test Passed Head test Drain Vent Failed Air Head Passed Head 5 psi or 10 ft. above highest conn. for 15 minutes Passed Jan 29, 2021 Page (2) INSPECTION WORKSHEET (RPLUM-007976-2021) Checklist Item Status Pressure Test Failed Water Supply Piping Failed Air Head Failed 50 P.S.I for 15 minutes Failed Air Test Gas Piping 10 psi for 10 Minutes Failed All Return Air Hard Duct Work Failed Duct Insulation - if required in unheated spaces Failed Duct Testing Outside Conditioned Space Failed Duct work sealed properly Failed Jan 29, 2021 Page (3) Dyer, Charles