Loading...
Signed Inspection Report (Fri Mar 12, 2021 at 351 PM)INSPECTION WORKSHEET (RPLUM-008816-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0621-2020 Case Module:Permit Inspection Date:Fri Mar 12, 2021 Inspection Status:Partial Pass Inspector:O'Brien, John Inspection Type:Rough Plumbing Job Address:Parcel Number:719 BAY RD Queensbury, NY, 12804 289.19-1-27 Contact Type Company Name Name Granted Permission BBL Construction Services Crupi, John Architect HCP Architects, LLP Primary Owner Rosetti Acquisitions LLC Applicant BBL Construction Services Crupi, John Contractor BBL Construction Services Crupi, John Checklist Item Status Permit Card Visible From Road Failed Building Inspector Notes Failed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. Plumbing Under Slab Passed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. Mar 12, 2021 Page (1) INSPECTION WORKSHEET (RPLUM-008816-2021) Checklist Item Status Rough Plumbing / Nail Plates Failed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. Plumbing Vent Vents in Place Failed 3" Vent Through Roof Failed 1 ½ inch minimum Drain Size Failed Shower liner test (2" of water)Failed Washing Machine Drain 2 inch minimum Failed Washing Machine Trap: 18"-42" discharge Failed Cleanout every 100 feet change of direction Passed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. Pressure Test Passed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved Mar 12, 2021 Page (2) INSPECTION WORKSHEET (RPLUM-008816-2021) Checklist Item Status - South half of building to Column line 18. Drain Vent Failed Air Head Passed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. 5 psi or 10 ft. above highest conn. for 15 minutes Passed 3/12/21 Rough Plumbing Partial Approval - Plumbing under slab partial approval(Deep Sewer, garage floor drains, roof drains, tenant fit up main, and sewer lines to upper floors. - Head tests approved - South half of building to Column line 18. Pressure Test Failed Water Supply Piping Failed Air Head Failed 50 P.S.I for 15 minutes Failed Air Test Gas Piping 10 psi for 10 Minutes Failed All Return Air Hard Duct Work Failed Mar 12, 2021 Page (3) INSPECTION WORKSHEET (RPLUM-008816-2021) Checklist Item Status Duct Insulation - if required in unheated spaces Failed Duct Testing Outside Conditioned Space Failed Duct work sealed properly Failed Mar 12, 2021 Page (4) O'Brien, John