Loading...
RC-0068-2021 Office Use Only ADDITION/ALTERATION PERMIT Permit#:_�C— O®Co APPLICATION Permit Fee:$ rMM orQueensbury 742 Bay Road,Queensbury,NY 12804 Invoice#: �v P:518-761-8256 www.ciueensbuDL.net q� Flood Zone? Y N Reviewed By: Project Location: 45 ` 19d'5+r 5 6d m rnonS i Y eY Tax Map ID#: ��o. �� Subdivision Name: PROJECT INFORMATION: TYPE: Residential Commercial, Proposed Use: (Single-Family _Two-Family _Multi-Family(#of units`} Townhouse —Business Office _Retail 'Industrial/Warehouse Garage(#of cars_} —Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 3� 2nd floor: 2nd floor: 31d floor: 31d floor: �-- Basement(habitable space): Basement(habitable space): -- Total sq ft: Total sq ft: 7"� Scope of work to be done: Ftoor" Oho v,rz "r',e rrn o Q,,,P of e l e tila`I`o 12- Retmove_ Pa.i., P k) n t k v I n't V'o o v'V--) Addition/Alteration Application Revised January 2021 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$500 0 2. Source of Heat(circle one):_Gas Oil _Propane Solar Other Ailk Fireplaces/inserts need a separate Fuel Burning Appliances&Chimney Application 3. Are there any structures not shown on the plot plan? YES NO Explain: _ 4. Are there any easements on the property? YES _NO SITE INFORMATION: • Is this a corner lot? _YES NO A. • Will the grade be changed as a result of the construction? _YES NO 0 LI • What Is the water source? PUBLIC PRIVATE WELL • What type of wastewater system is on the parcel? SEWER _PRIVATE SEPTIC DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior-to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn,30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date,100%of.the fee is retained. 3. ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. 1 certify that the application,plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 5. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain 'a certificate of occupancy, 6. 1 also understand that 1/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: 0 PRINT NAME: L ► h'd A/bre.e,1 SIGNATURE: DATE:_ ���D�/ Addit1WA1teraUon Applicat!on Revbo January 2021 V, CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: �} Name(s): Mailing Address, C/S/Z: 51 01 c> ,3 (e cx cQ 5 a 0 Cell Phone: )02.5?-9.3a'1 TOM J L Land Line: (.5/1) Email: Cn a �1� 1� �C.Dl1Str�c`� ► an[io COvr� • Primary Owners}: Name(s): -Marc go,cr'>o�y )� Carve-V (da u b Lem)- Mailing Address, C/S/Z: Cell Phone:�_) Land Line: �} Email: ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): ��c.u�'� Contractor Trade: Mailing Address, C/S/Z: Cell Phone:�_) Land Line: Email: "Workers' Comp documentation must be submitted with this application" • Architect(s)/Engineer(s): Business Name: )YlQ-ff'J-� IA s'J 4h r a Contact Name(s): Mailing Address, C/S/Z: Cell Phone: Land Line: Email: Contact Person for Compliance in regards to this project: )NQ�A icanT_ Cell Phone:_(_} Land Line: Email: Addition/Alteratlon Application Revised January 2021