Loading...
JB201133.0122.Concrete Compressive Strength Test.2021-02-26.Rpt.0122Rev1Report Number: Service Date: Report Date: Task: Client Queensbury, NY 12804 Bay Road and Blind Rock Road Fowler Square SI and CMTRosetti Acquisitions LLC Attn: Christopher Falvey 427 New Karner Rd Albany, NY 12205 518-266-0310 Albany, NY 12203-5169 30 Corporate Cir Ste 201 JB201133.0122 02/26/21 03/29/21 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project Project Number: JB201133 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: 35000 Jointa Galusha, L.L.C Material Information 1345 4905 Plant: Ticket No.: Glens Falls Field Test Data Test Air Content (%): Result Specification 5 1/2 4 - 6 7.5 4.5 - 7.5 60 40 - 95 40 3,500 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:02/26/21 1410 Christian Makasi Partly-Sunny 10 10 End of truckSample Location: Placement Method:Direct Discharge Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): Spread footings at M.26, M.28, N.26, N.25, K.22, K.23, R.22, R.23 & P.28; Building perimeter footing from Stair No 2’s North wall to 15’ North of spread footing at 27.F Placement Location: Laboratory Test Data Set Avg Diam.Area Weight DateDate Test Age at Load Maximum Strength Compressive Fracture No.ID Specimen Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested By(lbs) 1 1 4.00 12.57 03/01/21 8.45 03/05/21 7 45,090 2 3,590 ADB 1 2 4.00 12.57 03/01/21 8.45 03/26/21 28 55,320 2 4,400 ADB 1 3 4.00 12.57 03/01/21 8.40 03/26/21 28 55,510 2 4,420 ADB 1 4 4.00 12.57 03/01/21 8.40 03/26/21 28 55,860 2 4,450 ADB Average (28 days) 4,420 1 5 03/01/21 8.50 Hold 1 6 03/01/21 8.40 Hold Initial Cure:Final Cure:Onsite Cooler Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. 3500psi Concrete - Foundation Walls, Footings, Exterior Hot Water Non-Chloride 1% Mid Range Water-Reducer Samples Made By: Dente Group - A Terracon Co. Sample fresh concrete at the placement locations, perform required field tests and cast compressive strength samples.Services: Reported To: Contractor: Report Distribution: (1) Rosetti Acquisitions LLC, Christopher Falvey (1) 260 Structural Engineering, Dan Thomas (1) BBL Construction Services, Bobby Chatterton (1) BBL Construction Services, Eric Weatherwax (1) BBL Construction Services, Ryan Etue (1) D.A. Collins Construction Co Inc, Robin Stothers (1) Galusha & Sons LLC, Drew Stevens (1) Galusha & Sons LLC, James Campagnone Jared Hall Staff Geologist Bobby w. BBL Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Dente Group - A Terracon Co. Rep.: Christian Makasi The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1CR0001, 11-16-12, Rev.6