Loading...
Signed Inspection Report (Wed Mar 31, 2021 at 1217 PM)INSPECTION WORKSHEET (FDTN-009279-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0159-2020 Case Module:Permit Inspection Date:Wed Mar 31, 2021 Inspection Status:Partial Pass Inspector:Dyer, Charles Inspection Type:Building Foundation Job Address:Parcel Number:537 State Rte 149 Lake George, NY, 12845 278.-1-34 Contact Type Company Name Name Insulation Contractor JMR Irish Drywall Inc Applicant Hitchcock, Stephen HVAC Del's Plumbing Primary Owner Hitchcock, Sabrina Primary Owner Hitchcock, Stephen Engineer Jensen, Peter Contractor ACW Family Builders Granted Permission Hitchcock, Stephen Checklist Item Status Building Inspector Notes Failed 1/14/21 footings approved, provide an updated plan showing the change in the vertical dowels from J hook to straight #4 rebar, 4' on center, one foot from each corner. Please have the stamped plans on site for inspection. 2/5/21 as discussed, place plans and permit card in weather protection box @ meter panel 3/19/21 footings for garage approved, 3 rows of #4 rebar continuous, vertical dowels to be wet set. 3/22/21 poly under slab at basement verified Footings Passed Mar 31, 2021 Page (1) INSPECTION WORKSHEET (FDTN-009279-2021) Checklist Item Status Footings approved, 3 rows of #4 rebar continuous Piers Passed Piers approved at basement, 3 #4 rebar each direction Monolithic Slab Failed Reinforcement in Place Passed 3 rows of #4 rebar continuous Foundation / Wallpour Passed For garage wall 3/31/21 with one row continuous top Reinforcement in Place Passed Reinforcement in Place Failed Footing Dowels or Keyway in place Passed Foundation Dampproofing Passed Approved 2/5/21 Footing Drain Daylight or Sump Failed Footing Drain Stone - 12 inch width Passed Footing Drain Stone - 6 inches above footing Passed Mar 31, 2021 Page (2) INSPECTION WORKSHEET (FDTN-009279-2021) Checklist Item Status Backfill Approval Passed Plumbing Under Slab Failed PVC / Cast / Copper Failed Foundation Insulation Interior / Exterior Failed Rough Grade 6 inch drop within 10 ft.Failed Poly Under Slab Passed 3/22/21 poly under slab at basement verified Mar 31, 2021 Page (3) Dyer, Charles