Signed Inspection Report (Wed Mar 31, 2021 at 1146 AM)INSPECTION WORKSHEET (RESFINAL-009232-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0549-2018 Case Module:Permit
Inspection Date:Wed Mar 31, 2021 Inspection Status:Passed
Inspector:Dyer, Charles Inspection Type:Residential Final Inspection
Job Address:Parcel Number:12 Chestnut LN
Lake George, NY, 12845
226.19-1-20
Contact Type Company Name Name
Applicant McNeice, Laura
Engineer Hutchins Engineering
Granted Permission McNeice, Laura
Architect Jelley, Frank
Primary Owner McNeice, Laura
Checklist Item Status
General Comments Passed
11/3/20 walk through for CO
Items from previous list completed/ OK to issue CO
4 inch Building Number Address visible from road Passed
Provide 4" house numbers
Provided
Chimney Height / B Vent / Direct Vent Location Passed
Fresh Air Intake Passed
Fresh air supply 3' from grade Passed
Mar 31, 2021 Page (1)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
3" Plumbing Vent through roof minimum 18 inch Passed
Outside Spigots have Air Gap Passed
Not yet installed
Installed and verified
Roof Complete / Exterior Finish Complete Passed
Platform at all exterior doors Passed
Provide guards and handrails at balconies
Completed
Handrail 4 or more risers Passed
Guards at stairs,decks,patios 30" + above grade Passed
Guard at stairwell at 34" or more Passed
Window guards req:<2' above floor/6' above grade - quick release installed Passed
Guard at deck, porches 36" or more Passed
Handrail Termination at Newell Post or Wall Passed
Interior/Exterior Railings 34 to 38 Passed
Mar 31, 2021 Page (2)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
Wood deck: 2'+ from grade dia bracing required - H/C ramp compliant Passed
At front entry
4+ Deck Joist Ledger Connections-24" From Ends Passed
At front entry
Deck Ledger-Bolted per Code Passed
Front stoop
Grade away from foundation: 6" down, 10' out Passed
Not completed
Raking out top soil
6" clearance to sill plate Passed
Gas Shut-off Exposed & Regulator (18) Above Grade Passed
Propane
HVAC Vent Terminal 10' from Lot Line & Openings Passed
Dryer Duct Max Length 35', Labeled Over 35'Passed
Interior privacy/trim/doors/main entrance 36 Passed
Bathroom / Kitchen Watertight Passed
Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet Passed
Mar 31, 2021 Page (3)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
Smoke Detectors:Passed
Smoke Detectors 3' from Kitchens & Baths R314 Passed
Every level, Every bedroom Passed
Outside every bedroom area Passed
Battery backup: _____Passed
Inter Connected Passed
Carbon Monoxide Detectors:Passed
CO Detectors within 10' of all sleeping areas Passed
Attic Access 22 x 30 minimum Passed
Attic Access Insulation = Attic R- Value Passed
Provide ceiling insulation at access hatch
Attic Access Gasketed Passed
Provide gasket
Crawl Space Access 18 x 24 Passed
Mar 31, 2021 Page (4)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
Bathroom Fans, if no window Passed
Plumbing fixtures Passed
Not yet installed
Installed and working
Backflow Preventors where required Passed
Foundation insulation to floor Passed
ICF's
Energy Sticker on Elec. Panel:R-Val. & Heating Sys Passed
All Hot Water Systems: 3/4" or larger piping R-3 Passed
Duct work sealed properly Passed
Intake Openings Passed
Range Hood 400+ cfm-Fresh Air REQUIRED NA
Blower Door Test Certification Passed
Must provide for CO
Provided by T. Locascio
HRV or ERV Installed per Bedroom Requirements Passed
Mar 31, 2021 Page (5)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
Emergency egress below grade Passed
Crawl area
Furnace shut-off w/in 30 ft. or w/in line of site Passed
Propane Tank: Proper Setback from Prop Line/Struct Passed
Furnace/Hot Water Heater operating Passed
Low water shut-off boiler NA
Relief Valve ,Heat Trap/Water Temp 110 deg or less Passed
In process of being installed
Basement stairs closed rise greater than 4 inches Passed
Provide risers no more than 4" gap as discussed
Basement Egress: 5s.f. window w/sill or Bilco door NA
Crawl area
Jack posts in basement lagged at top and bottom Passed
Fin Elect; Energy Saving Light Bulbs 50 Percent Passed
Final Survey Plot Plan Passed
Provide for CO
Mar 31, 2021 Page (6)
INSPECTION WORKSHEET (RESFINAL-009232-2021)
Checklist Item Status
Arc Fault Breaker Habitable Spaces Passed
Flex Gas Pipe Bonding Passed
Propane
As Built Septic System Passed
Provide septic asbuilt
Site Plan / Variance required NA
Flood Plain Certification, if required NA
Fuel Tanks above flood plain elevation NA
Buried Fuel Tanks anchored in flood zone NA
Truss ID Signage Installed at Electrical Meter Passed
Provide sticker with V over R at electrical meter panel
OK to Issue C/O Passed
Mar 31, 2021 Page (7)
Dyer, Charles