Signed Inspection Report (Wed Apr 7, 2021 at 1049 AM)INSPECTION WORKSHEET (FRM-009428-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0621-2020 Case Module:Permit Inspection Date:Wed Apr 7, 2021 Inspection Status:Partial Pass Inspector:O'Brien, John Inspection Type:Building Framing Job Address:Parcel Number:719 BAY RD Queensbury, NY, 12804 289.19-1-27 Contact Type Company Name Name Applicant BBL Construction Services Crupi, John Contractor BBL Construction Services Crupi, John Granted Permission BBL Construction Services Crupi, John Primary Owner Rosetti Acquisitions LLC Architect HCP Architects, LLP Checklist Item Status Apr 07, 2021 Page (1) INSPECTION WORKSHEET (FRM-009428-2021) Checklist Item Status Building Inspector Notes Failed 2/10/21 As per my site visit I met with the metal stud framing, sheetrock, taping and fireproofing installer Seth Parker of Parker Hammond. We discussed what I will inspect when they are ready. I also spoke with Bobby Chatterton of BBL regarding the required inspections discussed with Seth. I asked Bobby to send me the specifications on the CAFCO-BOARD to be installed in narrow bay between structural steel and exterior structural metal stud framing at 2nd floor. The product is a replacement of the spray on fireproofing due winter weather conditions only at the location noted above. Also Dente/Terracon will need to inspect structural steel, structural exterior metal stud walls and fireproofing(CAFCO-BOARD). 2/17/21 partial approval for framing, south half of east facing exterior wall at first floor approved. 2x6 metal studs. Ok to sheath walls will check balance of structural metal stud framing items from inside. Fiber board fireproofing installed at narrow locations. 2/18/21 Building Framing Partial Approval - South Half of west wall metal stud structural framing partial approval. Ok to sheath walls will check balance of structural metal stud framing items from inside. Fiber board fireproofing installed at narrow locations. 3/8/21 Site visit with Dave Hatin, Mark Smith and myself. We met with Bobby Chatterton from BBL and went over job progress, upcoming structural inspections with third party engineer and under slab plumbing. 4/7/21 Building Framing Partial Approval - Balance of South Half of Building metal stud structural framing partial approval. Ok to sheath walls will check balance of structural metal stud framing items(clips and anchors from inside. Fiber board fireproofing installed at narrow locations. - Zip Roof Sheathing taping of joints at south half of building approved. Note: - Forward all special inspections for fireproofing, structural steel and wood framing performed to date for south half of building. - Roof access to dormers and parapets must be a minimum of 20"x30". Apr 07, 2021 Page (2) INSPECTION WORKSHEET (FRM-009428-2021) Checklist Item Status Framing Failed 2/10/21 As per my site visit I met with the metal stud framing, sheetrock, taping and fireproofing installer Seth Parker of Parker Hammond. We discussed what I will inspect when they are ready. I also spoke with Bobby Chatterton of BBL regarding the required inspections discussed with Seth. I asked Bobby to send me the specifications on the CAFCO-BOARD to be installed in narrow bay between structural steel and exterior structural metal stud framing at 2nd floor. The product is a replacement of the spray on fireproofing due winter weather conditions only at the location noted above. Also Dente/Terracon will need to inspect structural steel, structural exterior metal stud walls and fireproofing(CAFCO-BOARD). 2/17/21 partial approval for framing, south half of east facing exterior wall at first floor approved. 2x6 metal studs. Ok to sheath walls will check balance of structural metal stud framing items from inside. Fiber board fireproofing installed at narrow locations. 2/18/21 Building Framing Partial Approval - South Half of west wall metal stud structural framing partial approval. Ok to sheath walls will check balance of structural metal stud framing items from inside. Fiber board fireproofing installed at narrow locations. 4/7/21 Building Framing Partial Approval - Balance of South Half of Building metal stud structural framing partial approval. Ok to sheath walls will check balance of structural metal stud framing items(clips and anchors from inside. Fiber board fireproofing installed at narrow locations. - Zip Roof Sheathing taping of joints at south half of building approved. Note: - Forward all special inspections for fireproofing, structural steel and wood framing performed to date for south half of building. - Roof access to dormers and parapets must be a minimum of 20"x30". Attic Access 22 x 30 minimum Failed - Roof access to dormers and parapets must be a minimum of 20"x30". Jack Studs Headers Failed Apr 07, 2021 Page (3) INSPECTION WORKSHEET (FRM-009428-2021) Checklist Item Status Cont Hdrs/Strapping/Nailing Grid for Garage Door Failed Truss Specification Provided Failed Bracing Bridging Failed Hurricane Clips/Uplift Screws/Nail Holes Filled Failed Air Seal all Plates and Sills Failed Air Seal All Registers at Floor Failed Air Sealing all Joints Before Insulation Failed Joist hangers Failed Jack Posts Main Beams Failed Deck (post beam connections hex head bolts)Failed Exterior sheeting nailed properly Failed Apr 07, 2021 Page (4) INSPECTION WORKSHEET (FRM-009428-2021) Checklist Item Status 12 O.C.Failed Headroom 6 ft. 8 in.Failed Notches Holes Bearing Walls Failed Metal Strapping for Notches Top Plate Failed Draft stopping 1,000 sq. ft. floor trusses Failed >1000 s.f. then firestop must be installed Failed Anchor Bolts 6 ft. or less on center Failed Ice and water shield 24 inches from wall Failed <4:12 pitch double layer of ice/snow underlayment - over lapped 19"Failed Soffits-Insulation Baffel Failed Windows Habitable Space Bedrooms Failed 24 in. (H)Failed Apr 07, 2021 Page (5) INSPECTION WORKSHEET (FRM-009428-2021) Checklist Item Status 20 in. (W)Failed 5.7 sf above below grade Failed 5.0 sf grade Failed Design Professional Sign-off, if required Failed Apr 07, 2021 Page (6) O'Brien, John