2004-460 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
Community Development - Building & Codes (518) 761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: P20040460 Date Issued: Tuesday, January 18, 2005
This is to certify that work requested to be done as shown by Permit Number P20040460
has been completed.-
Tax Map Number: 523400-297-013-0001-033-000-0000
Location: 214 CRONIN Rd
Owner: HAYES CONSTRUCTION GROUP, LLC
Applicant: HAYES CONSTRUCTION GROUP, LLC
This structure may be occupied as a:
By Order of Town Board
Fireplace TOWN OF QUEENSBURY
Garage - 3 Cars Attached
Single Family Dwelling
Director of Building&Code nfor ent
Fire Marshal's Office Town of Queensbury,742 Bay Road,Queensbury,NY
(518)761-8205
Application for Fuel Burning Appliances & Chimn
applicable to solid fuel & vented gas .appliances
�o
Date Vf- , 20 Pern
Application is hereby made to the Building& Codes Office for the issuance o Ing 4zl Use
Permit pursuant to the New York State Fire Prevention and Building Code. The applica 'a er
agrees to comply with all applicable laws, ordinances, regulations, and all conditions that f
these requirements and also will allow all inspectors to enter premises to perform required in ctions.
NOTE to applicant: Rough-in and Final Inspections are required.
Applicant Information Fuel Burning Appliance Information
(circle appropriate words)
Name: ffilyzF5 C'ga.)_J7X_U67jC)IJ Stove: wood coal pellet gas
Fireplace insert
Address: ?J9(5 646 656 P-0 Fireplace, factory-built: wood as
Y �'Y o Fireplace, masonry: wood gas
Furnace: wood (T�a- oil
Phone: 'Z
If non-masonary applicance,please__``provide
Owner: Cd> � �' Manufacturer Name: 41 ZS 77 C
Address: Model Number: . 7-6 0
Chimney Information
Phone: (circle appropriate words)
Masonry block brick stone
Flue the . size: inches
Exact Address: ����^ ���
of construction or installation Factory-Built
Manufacturer name: 7 6®
Model Number: /
Note: Listed By: Number:
Construction/Installation must
conform to NYS Fire Prevention &Building Indicate(circle) chimney material:
Code. Consult available Town of Queensbury
Handouts regarding required inspections. ouble wa 1 Triple wall / Insulated / Direct venting
ChinIney Liner
Q'�,sc.�i_�ler'16r.Dep�.rtment—�'o�� of Que�ai�rbury, .ZV"�a�Y'i'or�i:
Fire Marshal Code# $Collected $Refunded Received fi•on1 (refunded to):
address: _
A 173 3389 (190) Public SafLety
A 233 2655 (230)Minor Sa es
DAT I_'.• 7 '
yi�wc�i.2�— I oww �iLNAo 02 C� �
White(Applicant) Green(Fire Marshal) / Yellow(Bldg. Dept.) / Pink cx Goldenrod(Cashier's Dept.) -
CheckV2)Fu11
Residential Plan Review: One& Two Family Dwellings
Y/N/N/A
ts of plans,500 sq. ft.—Stamped
Design Loads On Plans: 90 Wind Floor Loads 40 psf
70 Ground Snow Load Sleeping Areas and Attics 30 psf
Calculations:
Window Schedule With Glass Size ,
Door Schedule/Main Entrance 36"Door
Emergency Escape Or Bedrooms and Habitable Space
Above/Below grade, 5.7 sq.ft.
Grade,5.0 sq. ft. ,.J 1> , ' rm�
4"(h)x 20"(w)min. S y T
44"Max.Height above floor
Residential Check Paperwork Compliance and Inspectors Checklist: OK
Dampproofing/Waterproofing Materials On Plans
oundation Drainage On Plans,if required
6"Drop in 10' Exterior Grade
F ming Cross Section For Each Roof Line,Vertical Fire Stopping Every 10' Where
Required
Ice and Snow shield 24"Inside Exterior Wall/24"Inside Knee Walls
LAPlatforms At Exterior Doors
Stairway Headroom 6' 8'All Stairs 36"Width
Stair Run and Rise
Winder Run and Rise
iral Not Allowed From 2nd Story
vj Smoke Detectors Battery Backup and Proper Location
athroom Fixtures Proper Clearance
Hall Width,36"min.
Handrails More Than One Riser On Open Sides
VA
Railing and Guards>30"/Basement Stairs Included/Closed Risers More Than 4"in Ht.
Safety Glazing Notes For Required Areas
arage Fire Separation
Garage Floor Sloped
Attic Access
oof over 30"—22"x 30"/Crawl Spaces 18"x 24"Access
Carbon Monoxide Detector Lowest Sleeping Level
Soil Test Results, if required
Septic To Well Or Water Line Separation
All Paperwork Signed
Building Permit Application
Town of Queensbury—Dept of Community Development,742 Bay Road,Queensbury,NY
(518)761.8256
A permit must be:obtained before beginning construction. Permit File No. C)Z/^11(P D
No inspection will be made until applicant has received a LFeoPazid. S aj� ,'9O
valid Building permit. All applicants' spaces on this aid
application must be completed and must appear.on the d By.
application form.
Applicant: N>a' c-
Address: 7- `q5 btc- 6 R4 Address:
280
Phone#( ie )Z`Lz-��� Phone#(._) /NGQ�FF. 04Q
t Number: / House Number ~' / r0. qN0 C40ERY
Property Location: Lo ,_,____, ,.r._.
Subdivision Name: Tax Map Number:. jt 7,13 ik-33
New Building: residence /commercial 'Estimated Market Value of Construction,
o Addition: residence/ commercial If an Addition,what will use of new addition be?
G Alteration: residenco/ commercial
o No change to exterior size: residence!com'1
0 Other work(describe )
Check =S#Op
ncyInformation i Floor 2` Floor Other floor Total
Below sq.ft. sq.ft. sq.ft. Square Feet
mil dwelling 2 5S 1 o 25 1 �1
o Two fmily dwelling30 !
a Townhouse
o MWftmily dwelling
#ofunits
o office
o Mercantile
o Msaufactuta
G 1 car detached prage
0 2 car detached grago
0 3 car detached Luage
a 1 oar attached ge
0 2 oar attached gamp
'`XP 3 car attached gmse 'Lc> ZO
o Storage building- ^
commercial �,CJ
o Storage building- -
residential
G Other
What is the proposed height of the structure 3�' feet,inches
Will any second-hand-or ungraded lumber be used? If so,for what?
Type of Beating System: electric/ oil / /wood / reed hot air .baseboard/other: -
Number of FILW ces to be installed 'Number of Wo�Ees to be installed D
List below the person(s)responsible for supervision of work as regards to building codes:.
Name - - Address—--- - - Phone Number �1 ` i
Builder Cnj5 �i 5 d'��b 7 q 7___1 I* Z_
Plumber
Mason
Electrician
Declaration please sign below after you have carefully read the statement:
To the best of my knowledge the statements contained in this application,together with the plans and specifications
submitted,are a true and complete statement of all proposed work to be done on the described prernises and that all
provisions of the Building Code,the Zoning Ordinance and all other laws pertaining to the proposed work shall be complied
with,whether specified or noted,and that such work is authorized by the owner. Further,it is understood that Uwe shall
submit,prior to a Cert of Occupancy or Certificate of Compliance being issued,as requested by the Zoning
AdministratorkTD1Xrc=toi!)o1 BuildingandCodes,anji Bullt urvev by a licensed surveyor;drawn to scale,showing actual
location of cons on.
Signature: . own r,owner's a chitect,contractor
Application for Permit=Septic Qisposal System
s Town of Queensbury.742 Bay Road Queensbury,NY 12804 (518) 761-82S6
1. OWNER INFORMATION:
Q Office Use
Location of installation: �� in koa
File Permit No.
ON-7 Tax Map No. a� 2
Fee Paid
Owner's Name: !Qk C27atj
.........................................................-............-..�.
Address: `j BACE 662 Oe.� ob B�
QUF��Sg
2. INSTALLER'S NAME : e S C�.W y7gw e::P-T>j PHONE NO.
3. RESIDENCE,INFORMATION: (circle year of dwelling,,indicate#bedroom(s) and multiply#of
bedrooms with applicable gallons per bedroom to equal total daily flow)
Year of House: No. of Bedrooms x Computation = Total Daily Flow .
1980 or older x -150 gal/bdrm =
1980—1991 x 130 gal/bdrm =
1991 —present _ mil- —'6_. x 110 gandrm = Sisk
Garbage Grinder Installed yes_ ./.no
Spa or Hot Tub Installed yes, / no
4: PARCEL INFORMATION: (circle applicable information&indicate measurements)
Towanh . . Soil Nature . Ground Water Bedrock or Im ervious Material Do Water Su 1
la' at what depth at what depth �iva
Rolling loam feet!- N_ A- feet w
.Steep slope c �/� if well;.water supply
_%slope other 6l 7-La from any septic-system
depth: Ge + Q�r�I�.\ absorption is ft,
J other
Percolation Test: (To be completed by licensed professional engineer or architect) ~�
Rate: 9 0 minute per inch
5. PROPOSED SYSTEM: For New Construction: All individual sewage disposal systems must be designed by a licensed
professional engineer or architect(unless installed in a Planning Board approved subdivision). Add 250 gallons to the size
of the septic tank and leach field for each Garbage Grinder,.Spa or Whirlpool Tub.
Septic Tank: gallon(min.size I,000 gal) Z 50 a �l t A)f uv Cv-
Tile Field: each trench 5 ft, Total System Length. ft.
Seepage Pit(s): number of size of each: fl, by ft.
Size.gf Stone to be used: # / depth or thickness feet
Bed/System Size: x
Alternative System: length and/or size.
6. HOLDING TANK SYSTEM: (if required)
Number of tanks: / Size of each: gallons /TOTAL Capacity: gallons_
Note: Alarm System and associated electrical work must be inspected by a Town approved
electrical inspection agency.
7. SIGNATURE &INFORMATION FOR RESPONSIBLE PERSON(please read)
For your protection,please note that pursuant to Section 136-29 of the Code of the Town
of Queensbury,any permit or approval granted which is based upon or is granted in
reliance upon any material misrepresentation or failure to make a material fact or
circumstance known by or on behalf of an applicant, shall be void.
I have read the regulations with respect to this application and agree.to abide by these and all
requirements the To of Queensbury Sanitary Sewage Disposal Ordinance.
�( 0
AAA
l
Sig ture responsible person Date
i' •w R
r '1'c�wtt of tZctt�Clialmry
Srwta•;t ttTltl Hev ill"o. I.M.si m'd Olmotel.
w
1'
Alm luli Y
• A'1�.►iUIZI'`''t'k�)I`�1 Ii'11rI�L� .. ,
811,31111tM IO N Itso(J1.111tIfiN]111ON I'
' M •
'POND
ti'IuL. tN t/(►Tf'R• s .fi_t.t0Ier tt'M••! .
• - . .. 't�frttT CJ�f'1•I�X �.'• ter} +•— •
00
G p �.
• `z
110lY,
\. .�Ile «�""-
w •
w '
r
r
. r
■
7, SICsTI�►►"t'U! &INBORN .Tt� For"
arvi*aWUro
Queensbury Building & Code Enforcement - Residential ' al Inspection
Office No.(518)761-8256 Arrive: m/pm a rt: - m/
Date Inspection request received: _ Inspector's Initia s:
NAME: � �-�p� 0=4�4\el_�— (DTE:
IT#: Q0 Ll
LOCATION: ,� nrC'i��_�,�
TYPE OF STRUCTURE: S Y _
_ Comments
Y N N/A
Chimney Ht./"B"Vent/Direct Vent Location
Fresh Air Intake Gyn(d
3 inch Plumb Vent throw h roof minimum 6"
Roof Complete/Exterior Finish Complete
Guard 30 in.or more @ stairs,decks,patios
Guard at stairwell at 34 in. or more (�
Guard at deck,porches 36 in. or more U
Exterior Finish Complete
Interior/Exterior Railings 34 in.to 38 in.
Platform at all exterior doors
Interior Handrails stairs 2 or more risers
Enclosed Stairs Sheetrock Underside minimum %"
Gypsum
Grade away from foundation 6 in.with 10 ft.
Handrail Termination at Newell Post or Wall
6 inch clearance to sill plate
Gas Valve shut-off exposed/regulator 18"above grade
Gas Furnace shut-off within 30 ft. or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off boiler
Relief Valves installed/Heat Trap/Water Temp 110
Interior privacy/trim/doors/main entrance 36 in.
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety glazing
Interior Smoke Detectors:
Every level: / Every Bedroom:
Outside every bedroom area:
Inter Connected: / Battery backup:
Carbon Monoxide Detector
Bathroom Fans, if no window
Plumbing fixtures
Foundation insulation
Floor truss,draft stopping finished basement 1,000 sf
Emergency egress below grade _
Basement stairs closed rise>4 inches
Garage Floor Pitched _
Garage fire roofin./'/<hour fire door-/door closer
Duct work Sealed properly
Gas Logs in Sealed or Glass Enclosure
Attic access 30 in,x 22 in.x 30 in.(ht.)In accessible area
Crawl Spaces 18"x 24"access, 1 s . ft,150 s . ft. vents
Building No./Address visible from road
Final Electrical
Site Plan /Variance required
Final Survey Plot Plan
As Built Septic System/Sewer Dept.Inspection Sticker
Flood Plain CertificationjLgquired
Okay to issue C/C ZrT O em orar Permanen
L:\PamW\Building&Codes\Inspection Forms\Res.Final Insp. form 2.docLast printed 2/12/04
Queensbury Building & Code Enforcement - Residential Final Inspection
i -3
Office No.(518)761-8256 Arrive: &-9110 am/pm Depart: am/pm
Date Inspection request received: _ T Inspector's Initials:
NAME: u lAj� PERMIT
LOCATION:— DATE:
A0 4—
TYPE OF STRUCTURE: r— _
Comments
Y N N/A
Chimney Ht./"B"Vent/Direct Vent Location
Fresh Air Intake
3 inch Plumb Vent through roof minimum 6"
Roof Complete/Exterior Finish Com lete
Guard 30 in.or more(a)stairs,decks patios
Guard at stairwell at 34 in. or more
Guard at deck,porches 36 in, or more
Exterior Finish Complete
Interior/Exterior Railings 34 in.to 38 in.
Platform at all exterior doors
Interior Handrails stairs 2 or more risers
Enclosed Stairs Sheetrock Underside minimum '/"
Gypsum
Grade away from foundation 6 in.with 10 ft. GroJA�J
Handrail Termination at Newell Post or Wall
6 inch clearance to sill plate
Gas Valve shut-off exposed/regulator 18"above grade
Gas Furnace shut-off within 30 ft.or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off boiler
Relief Valves installed/Heat Trap/Water Temp 110
Interior privacy/trim/doors/main entrance 36 in.
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety glazing
Interior Smoke Detec ors:
Every level: V / Every Bedroom:
Outside every bedroom
Inter Connected: ✓ / Battery backup: ✓
Carbon Monoxide Detector
Bathroom Fans, if no window
Plumbing fixtures
Foundation insulation
Floor truss,draft stopping finished basement 1,000 sf
Emergency egress below grade
Basement stairs closed rise>4 inches
Garage Floor Pitched
Garage fireproofing/3/<hour fire door/door closer
Duct work Sealed properly
Gas Logs in Sealed or Glass Enclosure
Attic access 30 in.x 22 in.x 30 in.(ht.)In accessible area
Crawl Spaces 18"x 24"access, 1 s . f3.-150 s . ft. vents
Building No./Address visible from road
Final Electrical
Site Plan /Variance required
Final Survey Plot Plan
As Built Septic System/Sewer Dept.Inspection Sticker
Flood Plain Certification Kpuired '
Okay to issue C/C rc%O em orar / ermanenf
L:\PamW\Building&Codes\Inspection Forms\Res. Final Insp. form 2.docLast printed 2/12/04
a s v
v I
I
GRU5HED
5TONE
DRIVE
2 5TORY:
WOOD FRAMED O
HOU5E
- tiry h0/
a H LAND5 N./F OF
. c BRITTON
0334.
�� J
Rough Plumbing / Insulation Inspection Report
Office No. (518)761-8256 Date Inspection requ cc' ee
Queensbury Building&Code Enforcement Arrive: am/ ml Dep —a
742 Bay Road, Queensbury,NY 12804 Inspector's Initials:
NAME: PERMIT#: O
LOCATION: INSPECT ON:
TYPE OF STRUCTURE:
Y N N/A
PVC: R-1,R-2,R-3, R-4 Drain/Vents
Cast Iron,Copper Drain/Vent 1 Comm.
Plumbing Vent/Vents in Place
Rough Plumbing/Nail Plates
Head or Air Supply Test
Drain and Vents
5 PSI or 10 ft. above highest
Connection for 15 minutes
Water Supply Piping
Copper Commercial
Copper, CPVC,Pex One &Two Family
sulation/Residential Check/Commercial Check
Proper Vent,Attic Vent.:
Duct/Hot Water Piping insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct Work Sealed Properly
COMMENTS:
L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doe January 28,2003
Rough Plumbing/ Insulation Inspection Report
Office No. (518) 761-8256 Date Inspect request rec
Queensbury Building&Code Enforcement Arrive: am/pm, p m/pIn
742 Bay Road, Queensbury,NY 12804 Inspector's Initla
J `
NAME: � ,�,t 'PERMIT#:
LOCATION: C` / INSPECT ON:
TYPE OF STRUCTURE:
X N N/A
PVC: R-1,R-2,R.-3,R-4 Drain/Vents
Cast Iron, Copper Drain/Vent/Comm.
Plumbing Vent/Vents in Place
Rough Plumbing/Nail Plates
Head or Air Supply Test
Drain and Vents
5 PSI or 10 ft. above highest
Connection for 15 minutes
Water Supply Piping
Copper Commercial
o per, CPVC,Pex One &Two Family
sulation/Residentia h c /Commer ial Check
Proper Vent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace ,J\v
Duct Work Sealed Properly
COi MENTS: al
L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doe January 28,2003
1 - 3pA—
Rough Plumbing / Insulation Inspection Report
Office No. (518) 761-8256 Date Inspection reque re iv 1/( 2_
.6`
Queensbury Building& Code Enforcement Arrive: pm De art: r; a pm
742 Bay Road, Queensbury,NY 12804 Inspector's Initi
NAME:_ PERMIT
LOCATION: 6ii Co jj,-3 ID INSPECT ON: 1 l v
TYPE OF STRUCTURE:
Y N N/A
PVC: R-1,R-2,R-3,R4 Drain/Vents
Cast Iron, Copper Drain/Vent/ Comm.
Plumbing Vent/Vents in Place
Rough Plumbing/Nail Plates
1 % inch min. Drain Size
Washing Machine Drain 2 inch min.
Head or Air Supply Test
Drain and Vents
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water Supply Piping
Cooper Commercial
o er, CPVC,Pex One and Two-Family
Insu ation/Residential Check/ Commercial Check
Proper Vent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct work sealed properly/No duct tape
\� 1J
COMMENTS: �`c�
�• ��J��\ \O� ��
'A
LASueHemingway\Building.Codes.Inspection.FORWRough Plumbing Insulation Repoit.doc November]7,2003
Rough Plumbing / Insulation Inspection Rep rt/o
Office No. (518) 761-8256 Date Inspection reqFs
i
Queensbury Building&Code Enforcement Arrive: a a pm
742 Bay Road, Queensbury,NY 12804 Inspector's InitiNAME: #: 0
LOCATION: INSPECT ON:
TYPE OF STRUCTURE:
fit' N N/A
PVC: R-1,R-2,R-3,R4 Drain/Vents
Cast Iron, opper Drain/Vent/Comm.
Plupagmg Vent/Vents in Place
ou h Plumbing/Nail Plates
1 % inch min. Drain Size
Washing Machine rain 2 inch min.
Head o it upply Test
Drain an
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water Supply Piping
Cooper Commercial
Cooper, CPVC,Pex One and Two-Family
Insulation/Residential Check/Commercial Check
Proper Vent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air S!!pply for Furnace
Duct work sealed erl /No duct tape
COMMENT
LASueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003
Queensbury Building & Code Enforcement - Residential Final Inspection Z � "
Office No.(518)761-8256 Arrive: 113 am/pm Depart: am/pm 1 L /
Date Inspection request received: _ Inspector's Initials: _'; Z = �� '
_ _
NAME: _ PERMIT#:
LOCATION: C DATE:
TYPE OF STRUCTURE:
_ Comments
Y N N/A
Chimney Ht./"B"Vent/Direct Vent Location
Fresh Air Intake
3 inch Plumb Vent through roof minimum 6"
Roof Complete/Exterior Finish Complete
Guard 30 in.or more(0)stairs,decks,patios
Guard at stairwell at 34 in. or more
Guard at deck,porches 36 in. or more
Exterior Finish Complete
Interior/Exterior Railings 34 in.to 38 in.
Platform at all exterior doors
Interior Handrails stairs 2 or more risers
Enclosed Stairs Sheetrock Underside minimum %"
Gypsum
Grade away from foundation 6 in. with 10 ft.
Handrail Termination at Newell Post or Wall l
6 inch clearance to sill plate �Z� Cr�r�t �iil�/�—v al
Gas Valve shut-off exposed/regulator 18"above grade
Gas Furnace shut-off within 30 ft.or within line of site
Oil Furnace shut-off at entrance to furnace area
Furnace/Hot Water Heater operating
Low water shut-off boiler
Relief Valves installed/Heat Trap/Water Temp 110
Interior privacy/trim/doors/main entrance 36 in.
Bathroom/Kitchen watertight
Safety glazing/Window in stairwells safety lazin
Interior Smoke Detec rs:
Every level: V / Every Bed r m: ✓ , ,1 n^� (���Pc�c.;
Outside every bedroom area:
`
Inter Connected: ✓ / Batter backup:
Carbon Monoxide Detector
Bathroom Fans, if no window
Plumbing fixtures ✓ ` �� F ���r ��� ls �'"
Foundation insulation ,� �/
Floor truss,draft stopping finished basement 1,000 sf j fc L1SZf�►i'�� -�"�s"/Sf7Icr
Emergency a ress below grade
Basement stairs closed rise>4 inches
Garage Floor Pitched _
Garage fireproofing/'/<hour fire door/ oor clo 7
Duct work Sealed properly
Gas Logs in Soa1ed-offGlass Enclosure `��r� 9
Attic acces 0 in.x 22 i .x 30 in.(ht.)In accessible area j71)
Crawl Spaces x 24'access, 1 s . ft.-150 s . ft.vents
Building No./Address visible from road it Y ,y ,f�z ,.�v^' °�% -4]
Final Electrical
Site Plan /Variance required
Final Survey Plot Plan L/, ��! fVr✓ty
As Built Septic System/Sewer Dept. Inspection Sticker
Flood Plain Certification, if required
Okay to issue C/C or C/O Temporary/Permanent
L:\PamW\Building &Codes\Inspection Forins\Res. Final Insp. form 2.docLast printed 2/12/04
Final Survey Inspection
Dept. of Community Development
Town of Queensbury
742 Bay Road
Queensbury,NY 12804
Date received:
r —�J
NAME: wo=�:M� 011�
LOCATION:
PERMIT
Final Survey Plot Plan
Approved Denied
The attached final
survey has been
received by the /
Dept. of
Community
Development.
Upon review the
survey has been:
(ipl—z)
Craig Brown, Zo ing Administrator
Notes:
L:\.SueHemingway\Building.Codes.Inspection.FORMS\Final Survey
Zoning Administrator.doc
MAP REFERENCE:
MAP OF A 5URVEY MADE FOR
EILENE C. BANNON
BY, VAN DUSEN 5TEVE5
DATED= DECEMBER 31. 1g87
CROATTN
ROto
A.D
S84004140"E
498.47'
q
O - /.� OO
1V to
�
74,341 sq.ft. CRUSHSTONED
1.71 acres I DRIVE / 7�
LANDS N/F OF 279.4T 1
FATNODE /� s
N
O
a:
2 STORY
WOOD FRAMED DO O
DECK HOUSE
�ryO♦h�/
r 5
v
oc
0O LANDS N/F OF
/ BRITTON
Nj3 49*0?'
. c• • •
C.
LANDS N/F OF "'�'i 50'
BANNON {AW,
0obt4- qW
� ' 7 Date, JANUARY 13, 2005
l.-+L 'UNALIMOMED ALn RAIN OR Aoana+TO A SURVEY Scale 1'=30'
v a & ►SAP�Na A � aEAL L3 A Map of a Survey made for
VIOLATKM OF SECTION nN.SIB-DIN90N 2,Dc 7HE
P P C NEW YDRK STATE EDUCATKM LAW.*
S t e v V *ONLY COPIES FROM IAL OF NM.OF iHS SURVEYORS
NM®MTH AN tatlpNAl OF TIE WO S<RUE COS -
FOR� HAYES CONSTRUCTION GROUP , LLC 1
RM
CERm"mm s NDICAm HEREON sm"THAT
THIS SURVEY WAS PREPARED N ACCOMOM MTH THE
IM CM OF
Land Survey ors BY D S NEW O ft S7A,E AS90CIA,KM DF a RUM KNAL
LAM slmMRM F SAD m NE SU VE s15 P RIM aNLA �T
ro 7Iff PERSON FOR wIDY NE SSIRVEY 6 PREPMFD,AND
ON HS BEHALF TC THE TOLE COMPANY.60VFRW09AL
169 Haviland Road Queensbu New York 12804 70 W S ""' O "S"'°'nD"`"'m aml AM Town of Queensbury, Warren County, New York
rya ro T!ff A59ONFES OF THE LEUDIND BETn1UT10N.'
ItAYES 01427
(518) 792-8474 New York Lie. No. 50135 NO. DATE DESCRIPTION DWG. NO. 02154-A
P.D. 2g7.13-1-33 / 5q-3-13
•
Septic Inspection Report
Office No. (518)761-8256 Date Inspection r ues re ive
Queensbury Building&Code Enforcement Arrive: am/p i D part: ®a in
742 Bay Rd.,Queensbu`ry,N`Y�12804 Inspector's Initials:
NAME: 1-y1� - -- P IT NO.: 2-00 LI
LOCATION: J —I '-A CRQIJ 1 h) Rn ECT ON: —
RECHECK:
Comments and/or diagram
Soil Type: CSa�n
k oam/Clay
Type of Water: unici a ell Water 1
Waterline se aratlon istance ft.
Well separation distance ft•
Other wells: ft
Absorption Field: Total length amft.
Length of each trench ft.
Depth of trenches f ft
Size of Stone R�l- -ADO
Seepage Pits: Number 0 =R Ear - ►�`� zt�F
Size: x 1
Stone Size: _
piping Size T e
Building to tank 1% s6C8 'LAD
=1L=�=�
Tank to Distribution Box
Distribution Box field/Pit 1�
Opening Sealed Y/ /Partial
Location/Separations
Foundation to tank ft.
Foundation to absorption ft• _ _ :_
Separation of Pits ft
Conforms as per Plot Plan Y N
Location of System on Property:
Front Rear Left Side Right Side
le Front Middle Rear
System Use Status:
Approved
Partial Approved and needs to be re-inspected, please call the Building&Codes Office
Disapproved
L:\SueHemingway\Building.Codes.Inspection.FORMS1Septic Inspection Report.doc January 28,2003
----__�._____
FATTENS MILLS- ,.OIN`CA GAL.USHA, L. L. C.
PATTENS MILLS ROAD DRIVER
WLST FORT, ANN, NY 12801 ti
TICKET ## 417639
DATg/T.XME PRODUCT, ; HAULER/TRUCK �
-11��5/k4' .-�-_ __ _,��..� ________.�.---_y4a166�w .,-HAhZRIS, TF{EI1"H _�__'_ _ _w_ -
14:441 NY8' #2 STONE 017 84_AUTOCAR TRAC
CUaTCJMFt I, UTY UNIT PRODUCT ROfCF AMOUNT.
7P�846M �--, -- ---__ ._._...._�.-�-�"1;,,1.�hN �� -TONNYS #2 STONEY__--____
FREIGHT PICK UP C
I., as ,Tooay: 2. ZONE ,
t t :Today a �+1. 00 TAX WAS'
TOTAL
METRIC- F°AUNDS TONS ' CRON I N RD
-
___ _.�___-____-_.�__
G"S 34:29� . ,75600 37. 80
4T�IA E 5. 15 .33400.. 16. 70
ITT 19: 14 fi ''1 2101
i
W HMA87EF?°a DICK '
_.-:.s...,'._.-�v_-�_r-r:-•>=-e '.^-•--. -, -.' _ :-y-.......,v-.. ,. -- .«•;--"''a "''sac ""'`_"'.'"'*'�.s+-'
PATTEN8, MILLS JOINTA GALUSHA, L. L. C. = _- ---
.(516) 798-5029 PAT TENS MILLS ROAD DR I V
t . -WEST' rOFJ T ANN, NY' A;9O1
TICKET # • '417 626
'e'- DATE/,TIME PRODUCT J ;HAULER,/TRUCK j
--------------
11/0,5/04 ' c: "49166 -HARRIS, KEITH
12:22 NYS -## 5 T ONE �Zi 17 84 AUTOCAR TRAC
1
CUSTOMER OTY -..UNIT-- PRODUCT ,PRICE {AMOUN�
'. .7�6'4�� -;-���» 9''��TgN '•-NYS-#�-STaP,�E----• fF__.�__ �-__w _:_ -���
to Y9'
CRONIN
FRIGHT PICK UP `
t
Loarjl-s 'Tadao►a 1,F ZONE
O y. Tray i . 9i TAX WAS
- ------- —= ---
i
--_.-._..__- ---- __... --- --------
POUNDS TONS CRONIN RD
— — - r----- --- __—ri
DROSS 3- . 2'0 2►�0 ~36. 60 ,.
TARE, 15. 15 33400 1C-,.70 � , 1,
Septic Inspection Report
Office No.(518)761-8256 Date Inspection r ues re ive _
Queensbury Building&Code Enforcement Arrive: am/p part: k a pm
742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials:
NAME: �-1 A�F P NO.: ZO O —
LOCATION: _= 1 YA CR O iJ 11,) ECT ON: —
LL
RECHECK:
Comments and/or diagram
Soil Type: an oam Clay
Type of Water: unici a lVell Water
Waterline se aratlon istance ft•
Well separation distance ft.
Other wells: ft.
Absorption Field: Total lengthLen h of each trench De th of trenchesSize of Stonei&i
Se a e Pits: Number �� =( o6K tJ` v"' Z—
Size: x _ _ __
Stone Size:
pG1 i� �l�� -
Piping Size Type
Buildingto tank �� �t=tz) �
Tank to Distribution Box o
Distribution Box Wield ield/Pit U VHF,
Opening Sealed Y/ /Partial
Location/Separations a ==-
Foundation to tank ft• F
Foundation to absqr
ption ft• = ' , � °`� Pc �J
Separation of Pits -
Conforms as per Plot Plan Y ZLNh
Location of System on Property: .
Front Rear Left Side Right Side
�IefrontMiddle Rear
System Use Status:
Approved
,,Partial Approved and needs to be re-inspected,please call the Building&Codes Office
Disapproved
L:1SueHemingway\Building.Codes.Inspection.FORMS\.Septic Inspection Report.doc January 28,2003
� -d etiv -
Rough Plumbing / Insulation Inspection Deport
Office No. (518) 761-8256 Date Inspection request
/Queensbury Building& Code Enforcement Arrive:742 Bay Road, Queensbury,NY 12804 Inspector's Ini al -
NAME: #0w,c� V-
LOCATION: CZ 114 -;?cy INSPECT ON:
TYPE OF STRUCTURE:
Y N N/A
PVC: R-1,R-2, R-3,R-4 Drain/Vents
Cast Iron, Copper Drain/Vent/Comm.
Plumbing Vent/Vents in Place
Rough Plumbing/Nail Plates
1 % inch min. Drain Size
Washing Machine Drain 2 inch min.
Head or Air Supply Test
Drain and Vents
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water.Supply Piping
Cooper Commercial
CPVC,Pex One and Two-Famil
usulation% esidential Check/ Commercial Check
Pro er ent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct work sealed properly/No duct tape
COMMENTS:
LASueHemingway\Building.Codes.Inspection,FORM S\Rough,Plumbing Insulation Report.doc November 17,2003
Septic Inspection Report
' Office No. (518)761-8256 Date Inspection r ues recei (l G
Queensbury Building&Code Enforcement Arrive: am/p art: . a
742 Bay Rd.,Queensbury,NY 12804 - Inspector's Initi
NAME:
'ti NO.: -
�" c. _
LOCATION: INSPECT ON:
RECHECK:
Comments and/or diagram
Soil TYPK. San ay
Type of ici a /Well Water — 1ST LF,AC-4 L t �� GL.0.SF TT
Waterlines aration i ce ft.
Ho
Well separation distance ft. C
Other wells: ft. �
Absorption Field: Total length ft. �E
Len of each trench i�t. M A L L 6 1 o tjE_ F_&_%j i� j p
-
De Depth of trenches - ft.
p Q� v To � `F Size of Stone �j
Seepage Pits: Number .
x
Stone Size:
Piping Size Type
Building to tank
Tank to Distribution Box
Distribution Box to Fje4/Pit
Opening Sealed: Y N artial
Location/Separations
Foundation to tank ft.
Foundation to absorption
Separation of Pits fy
Conforms as per Plot Plan Y N
Location of System on Property:
Front Rear Left Side Right Side
Middle Front dle Rear
System Use Status:
pproved
Partial Approved and needs to be re-inspected,please call the Building&Codes Office
Disapproved
Rough Plumbing / Insulation Inspection Report
Office No. (518) 761-8256 Date Inspection request received:
Queensbury Building&c Code Enforcement Arrive: amM
pait: rn/pm742 Bay Road, Queensbury,NY 12804 Inspector's Initials
14
NAME: ,Q
PERMIT #:
LOCATION: INSPECT ON:
TYPE OF STRUCTURE: �=�
1
Y N N/A
rast
C: R-1,R-2, R-3,R-4 Drain/Vents
Iron, Copper Drain/Vent/ Comm.
m ' ent/Vents in Place
ou h Plumbin /Nail Plates
1 % inch min.. Drain Size
,,Washing Machine Drain 2 inch min.
Head or Air Supply Test
Drain and Vents
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout eveq 100 feet/change of direction
Water Supply Piping
Cooper Commercial
Cooper,CPVC,Pex One and Two-Family
Insulation/Residential Check/Commercial Check
Proper Vent,Attic Vent
Duct!Hot Water Piping Insulation
If required unheated spaces
Combustion Air S!!pply for Furnace
Duct work sealed properly/No duct tape
COMMENTS: 4i6p &—owe&' ! <% 1A , 6A S C�
r
L.\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003
`
Rough Plumbing / Insulation In i � (�
s ect o n�e ort
Office No. (518) 761-8256 Date Inspection request e ved- o4 .
Queensbury Building& Code Enforcement Arrive: pm art: `
742 Bay Road, Queensbury,NY 12804 Inspector's Init' Is-
NAME: PERMIT #:
LOCATION: y` INSPECT ON: D
TYPE OF STRUCTURE: nA ,3
Y N N/A
PVC: R-1,R-2,R-3,R4 Drain/Vents
Cast Iron, Copper Drain/Vent/ Comm.
Plumbing Vent/Vents in Place
Rough Plumbing/Nail Plates
I % inch min. Drain Size
Washing Machine Drain 2 inch min.
Head or Air Supply Test
Drain and Vents
5 PSI or 10 feet above highest
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water Supply Piping
Cooper Commercial
CPVC,Pex One and Two-Tamil
Nnsulahon Residential Check/ Commercial Check
ro er Vent,Attic Vent
Duct/Hot Water Piping Insulation
If required unheated spaces
Combustion Air S!!pply for Furnace
Duct work sealed properly/No duct tape
COMMENTS:
L:\SueHemingway\Building.Codes.Inspection.FORMS\Rough Plumbing Insulation Report.doc November 17,2003
Framing / Firestopping Inspection Report
V
�S- toad
Office No. (518) 761-8256 Date Inspection r ques re el ed: 1 L 3
Queensbury Building& Code Enforcement Arrive: rn/ art: a m `I
742 Bay Road, Queensbury, NY 12804 Inspector's Initi Is-
NAME: l �' PERMIT#: p2 U`7 7jq
LOCATION: Cil INSPECT ON: p
TYPE OF STRUCTURE:
/ v � r4Z
Y lv /
Framing COMMENTS
1 '
uds/Heade s /
Bracing/Bridging V/
Joist hangers ✓�
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft. 8 in.
Stairwells 36 in. or more
Headroom 6 ft. 8 in.
Notches/Holes/Bearing Walls L
Metal Strapping for Notches Top Plate
1 %z (w) 16 gauge (8) 16D nails each side
Draft stopping 1,000 sq. ft. floor trusses
Anchor Bolts 6 ft. or less on center
Ice and snow shield 24 inches from wall
Fire separation 1, 2, 3 hour
ire wall 2, 3, 4 hour o' A�,�✓`� ' `7`� 1
Firestopping Wf�&�M—VPenetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side %2 inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in. (H)
20 in. (W)
5.7 sf above/below grad
5.0 sf grade
LASueHemingw•ay\Building.Codes.Inspection.FORM S\Framing Firestopping Inspection Report.doc January 28,2003
2— oQ �� t 9 0
Rough Plumbing / Insulation Inspection Report
Office No. (51 8) 761-8256 Date Inspection request ece ed: lib✓ , ��
Queensbury Building& Code Enforcement Arrive: pm D rt: b
742 Bay Road, Queensbury,NY 12804 Inspector's Initi s:
NAME: PERM #: C>A
LOCATION: 1 INS CT ON: �✓� �`f
TYPE OF ST
Y N N/A
PVC: R-1,R-2, R-3,R4 Drain/Vents
Cast Iron, Copper Drain/Vent/ Comm.
Plumbing Vent/Vents in Place /
ou umbin� Nail Plates
1 % inch min. Drain Size v
Washing Machine Drain 2 inch min. \�
Head or Air'Supply Test
Drain and Vents 7 /.�
5 PSI or 10 feet above highest -�
connection for 15 minutes
Cleanout every 100 feet/change of direction
Water Supply Piping
Cooper Commercial ���
Cooper, CPVC,Pex One and Two-Fa z* y
Insulation/Residential Check/Comm rcial Check
Proper Vent, Attic Vent
Duct/Hot Water Piping Insulatio
If required unheated spaces
Combustion Air Supply for FurAace
Duct work sealed properly/ ,6 duct tape
COMMENTS:
LASueHemingway\l3uilding.Codes.Inspection.FORM S\Rough Plumbing Insulation Repo t.doc November 17,2003
V
Foundation Inspection Report ,t/�/ '•
Office No. (518) 761-8256 Date Inspection request received: 101).5W
Queensbury Building&Code Enforcement Arrive: am/ i Depart: a'�m/pm
742 Bay Rd., Queensbury, NY 12804 Inspector's Initials:ki
NAME: _ _ &tAt _ PERMIT#: e CCU `
LOCATION: J %n, INSPECT ON:
TYPE OF STRUCTURE: S ED
Comments
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour-
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofing/Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
NIP"
: 51g Under Slab
V /Cast/Copper
Foundation Insulation Interio /Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:1sueHemingway\Auilding.Codc,Inspcetion.BORM,111 n a i specdon Report.doe January 28,2003
� DC,
������y B
P
2— vuy
Framing / Firestopping Inspection Deport / �l
Office No. (518) 761-8256 Date Inspection ague t r cei ed:
Queensbury Building&Code Enforcement Arrive: ,airl/p epart: a
742 Bay Road, Queensbury, NY 12804 Inspector's Initi '`
NAME: U C
ti PERMIT#:
LOCATION: INSPECT ON:
TYPE OF STRUCTURE:( Z
�F '✓
4raming
Y N N/A COMMENTS✓IIENTS
t_NA .�+ `=Ltd pdz �, 2t
Jack Studs/Headers
Bracing/Bridging / 1 �-i -�11 ��
Joist hangers
Jack Posts/Main Beams &o ���\ t��
Exterior sheeting nailed properly f F
12°' O.C.
Headroom 6 ft. 8 in.
U
Stairwells 36 in. or more
Headroom 6 ft. 8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 % (w) 16 gauge (8) 16D nails each side
Draft stoppi 1,000 sq. ft. floor trusses
Ncho olts 6 ft. or less on center >
and snow shield 24 inches from wall =t L(
Fire separation 1, 2, 3 hour
Fire wall 2, 3, 4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side % inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in. (H)
20 in. (W)
5.7 sf above/below grade
5.0 sf grade
L:\SueHeminew•ay\Building.Codes.Inspection.FORM S\Framing Firestopping Inspection Report.doc January 28,2003
Foundation Inspection Report
Office No. (518) 761-82.56 Date Inspection r?4FF
ed: O I O
Queensbury Building&Code Enforcement Arrive: aDepart: am/
742 Bay Rd., Queensbury,NY 12804 Inspector's InitialNAME: P4
LOCATION: _ �— _ INSPECT ON: 0 100
run—
TYPE OF STRUCTU .S F-D
Comments
— —�� — Y N N/A
Footings
Piers
Monolithic-Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this pu_pr ose on site.
Foundation/Wallpour
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofing/Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone: T
12 inch width
6 inches above footing
6 mil p lyfor wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R- _
Rough Grade 6 inch drop within 10 ft.
LASueHemingway\Building.Codes.Inspection.FORMSToundation Inspection Report.doe January 28,2003
Foundation Inspection Report
Office No. (518) 761-82.56 Date Inspectio equest r ce' ed:
Queersbury Building&Code Enforcement Arrive: any pm epart:
742 Bay Rd., Queensbury,NY 12804 Inspector's Inr Ia s.
NAME: 11��' .,KNIT#. _
LOCATION: _ �J l✓� ; � _ IN, ON: — —
TYPE. OF STRUCTURE:
Comments
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Rei rcement in Place
oundation Dampproofing
",� undation/Waterproofing 10
Type of Dampproofing/Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
LASucHemingway\Building.Codes.Inspection.PORMS\1'oundation Inspection Report.doc January 28,2003
Foundation Inspection Report
Office No. (518) 761-8256 Date InspectionfERMIT
tece,
Queensbury Building&Code Enforcement Arrive: epart: a m
742 Bay Rd., Queensbury,NY 12804 Inspector's Initi
04
NAME: _ _ Q� #:
LOCA'CION: sn IN'SPECT ON: —6 T
TYPE OF STRUCTURE:
Comments
----- y N N/A
Footings
Piers _
Monolith4c Slab
Rein£ &cement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site. _
Foundation/Wallpour
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofing/Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under SIab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
LASueHemingway\Building.Codes.Inspecti on.FORMS\Foundation Inspection Report.doc .January 28,2003
Foundation Inspection Report
Office No. (518) 761-8256 Date Inspection request received:
Queensbury Building&Code Enforcement Arrive: anvp8 p Dep rt: _ an-L/pm
742 Bay Rd., Queensbury,NY 12804 Inspector's Initials:—H v�
NAME: „ PERMIT#: "
LOCATION: _ _ INSPECT ON
TYPE,OF STRUCTURE: S F-
Comments
Y N N/A
Footings
Piers ^�
Monolithic Slab
Reinforcement in Place
—
The contractor is responsible-rot-
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this puTose on site. _
Foundation/Wallpour
Reinforcement in Place
Foundation Dampproofing
Foundation/Waterproofing
Type of Dampproofing/Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under SIab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\SueHemingway\Building.Codes.Inspection.FORMS\foundation Inspection Report.doc January 28,2003
Town of Queensbury Fire Marshal /�1
742 Bay Road
Queensbury,NY 12804
761-8205/761-8206
fax 7455-4437
Factory Built Gas Fireplace/Stove Lnspection Report
Notice:New York State requires that all UL misted,factory built appliances be installed according to the instructions
specifications contained in the Installation Manual accompanying the appliance.No deviation from the manufac rer's
instructions or specifications is allowed. "
Permit# v chedule Inspection Time 9` I 1 In anytime Inspector
CName Address �l vl �� Rough In Fin —
Appliance Manufacturer- —i� �—— ���� Model#
Direct Vent Factory Built Chimney Flue Size Double Wall Triple Mall Insulated
- Yes No N/A Comments
Floor Protection
Clearances to Combustibles (all sides)
Firestop(s) Vertical Chase
Wall Penetration �.
Vent Clearances to Combustibles /
Vent/Chimney Termination
Chimney height must be 3 feet above roof
penetration;2 feet above any combustible
construction within 10 feet
Gas Shut-Off Valve
Combustion Air
Hearth Extension (if any)
Mantel
Height above f/p opening
Witness Operation
Tank Placement(if LP)
White—EulldingDept, —,__ ~ �— -Yellow Custic ater Pink—Fire Maxshal
June 4, 2004
Daniel W. Ryan, P.E.
Hayes.Construction Group
395 Big Bay Road Queensbury, NY 12804 �O 18�
Town of Queensbury /NcO��S6U
Building & Codes Department
742 Bay Road
Queensbury, NY 12804
RE: Building Permit Application for lot on Cronin Road
We are pleased to submit the following percolation test results for the above referenced
project.
Location Percolation Rate
Front Center 2 min. 40 sec./inch
Please do not hesitate to call if you have any questions. I can be contacted at 361-2618.
Thank you for your time.and consideration in this matter.
Sincere)
L ,
Daniel . Ryan, P.E. OF NEWY
�P L q y O
.
LU
�pA No 9 060 �2
ROPES S 10��
PROFESSIONAL SEAL
November 11, 2004 ` Q
Daniel W. Ryan, P.E.
10 Kimberly Lane
Queensbury, NY 12804
Town of Queensbury
Building &Codes Department
742 Bay Road
Queensbury, NY 12804
RE: Revised Percolation Test and Septic for 214 Cronin Road
I am pleased to submit the following percolation.test results for the above referenced project.
Location Percolation Rate
Front Center 1 min. 52 sec./inch
Additionally, I have attached the septic design for this location. Please do not hesitate to call if
you have any questions. I can be contacted at 361-2618. Thank you for your time and
consideration in this matter.
Sincerely
f -
Daniel W. Ryan, P.E.
OF NE ,I-
0
2 �
m l. . w
N
OFFS S 1 OAP
PROFESSIONAL SEAL
s
PROPERTY LINE
15' MIN. SEPTIC DESIGN
WELL S7REq►y
WELL POND LOCATION: 214 CRONIN RD.
PERCOLATION RATE: 1MIN. 52 SEC.
I
APPLICATION RATE: 1.2 GPD/SQ FT
NO. OF BEDROOMS: 5
MINIMUM SEPTIC TANK CAPACITY: 1500 GAL
PDRY WELL DESIGN FLOW RATE: 550 GPD
i
(ASSUMING NEW STANDARD FIXTURES)
100' MIN. i TYPE OF SYSTEM: ABSORPTION TRENCH
I
. I
1 00 MIN• I 100' MIN. I REQUIRED TOTAL LENGTH OF ABSORPTION TRENCH:
10, MIN. I H U 230 FT
20' MIN. G R G 00' MIN.
I SEPTIC TANK
I
I I
I
a I �0F NFL
I I I DISTRIBUTION BOX
• I I I I Q 92��
50% EXPANSION I I I
10 MIN.
ABSORPTION FIELD I N�
-- -- -- -- �,o �O. 07906�
SEWAGE DISPOSAL LAYOUT R°"FssloNP�"
NOT TO SCALE
NOTES
1. TILE FIELD TO BE 100' OR MORE FROM ANY 3. DISCHARGE FOOTING, ROOF AND CELLAR DRAINAGE
LAKE, SWAMP, DITCH OR WATERCOURSE AND 10' AWAY FROM SEWERAGE SYSTEM.
OR MORE FROM ANY WATER LINE UNDER PRESSURE.
4. DISPOSAL FIELD SHALL BE CONSTRUCTED PARALLEL
2. FOR SEWAGE PIPE BETWEEN HOUSE AND SEPTIC TANK WITH CONTOUR LINES.
USE DUCTILE OR CAST IRON PIPE, OR SCHEDULE 40
PVC WITH CEMENTED JOINTS.
REVISED DATE VISION Engineering and Construction, UC _Septic System
10 Xbnberly Iene, Qeeenebmy, N.Y. 12804 DWG 1
PHONE: M-9284 Noor STANDARD CONSTRUCTION of 3
DETAILS
TOPSOIL FOR SETTLING
EARTH BACKFILL SLOPE TRENCH
I' UNTREATED .BLDG. PAPER BOTTOM
° OR STRAW 1/16" — 1/32" %o°°rp y , •8° :°Oep 18-sub
PER FOOT
m' DISTRIBUTOR PIPE — 6'-0" O.C.
CRUSHED STONE OR 4" PERFORATED\
WASHED GRAVEL PVC LATERAL
3/4 TO 1 1/2
N BEDROCK, IMPERVIOUS LAYER, OR NOTE: LENGTH AND LAYOUT OF FIELD
EVIDENCE OF HIGHEST LEVEL OF SHALL BE BASED ON DESIGN SUBMITTED
r-o• GROUND WATER BY PROFESSIONAL ENGINEER
LEACH FIELD SECTION LEACH FIELD PROFILE p.
N.T.S. NOTEI. ENDS OF ALL DISTRIBUTOR PIPES MUST BE CAPPED OR P D� �.1\EL W. T.S'
GROUND SURFACE LOCATION STAKE 2. ALL LATERALS T0,BE OF EQUAL LENGTH. * QP f
i
MANHOLE COVER
MANHOLE COVER y
SCHED. 40 SCHED. 35 N ' `U3
INLET r n OUTLET RING BOLTS �`a o 79060 ����
.O (7
LI
VE
QUID R----- ssIONP`-�
SANITARY TEE m INV OF INLET I INLET r
2. ABOVE m SANITARY TEE (SLOPE 1/4
U INV OF OUTLET' u PER FTLOPE.) OUTLET "
PRECAST SEPTIC I I I I I I ( PER FT.)8
TANK "�I 20 IMIN.
L J
` ? BAFFLES MAY BE
'� B USED INSTEAD OF
X ;+ v SANITARY TEE
NOTE: TANK SIZE BASED ON DESIGN SUBMITTED
`/�`/- MIN. 4" SAND OR PEA BY PROFESSIONAL ENGINEER
SEPTIC TANK SECTION GRAVEL WHERE REQ'D SEPTIC TANK PLAN
N.T.S. N.T.S.
REVISED DATE VISION Engineering and Construction, UC Septic System
IU»>a>b 4ne, Quaw>W, N.Y. 1NO4 DWG . 2
more. M-w" STANDARD CONSTRUCTION OF 3
DETAILS
CONCRETE OR STONE
MARKER ABOVE ALL A.
BURRIED COVERS
RECOMMENDED. SEPTIC TANKS
INLET BAFFLE 1. ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK
12" MIN. COVER OVER STATE DEPARTMENT OF HEALTH AND SHALL BE PRECAST CONCRETE
ALL STRUCTURES AS MANUFACTURED BY FORT MILLER OR EQUIVALENT.
8—HOLE DISTRIBUTION 2. ALL STRUCTURES TO BE PLACED ON FIRM, COMPACT SAND OR
',—
BOX GRAVEL FOUNDATION. WHEREVER EXISTING FOUNDATION CONDITIONS
ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS
NECESSARY TO ACHIEVE A STABLE FOUNDATION.
3. SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE EXTRA HEAVY
CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING.
MIN. SLOPE
1/8" PER FOOT
ALL OUTLET INVERTS
*%-SAND OR TO BE
CT SET AT
N
EXACTLY THE SAME
DISTRIBUTION BOX GRAVEL ELEVATION.
(USE OF SPEED LEVELERS
NOT TO SCALE ENCOURAGED)
INSTALLATION OF DISPOSAL FIELDS
1. CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING,
AND SHALL BE IN ACCORDANCE.WITH THE N.Y.S.
DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS, AND
ASTM F481-76 INSTALLATION OF THERMOPLASTIC PIPE AND
CORRUGATED TUBING IN SEPTIC TANK LEACH FIELDS. OF NEW y
2. NO HEAVY EQUIPMENT SHALL BE ALLOWED WITHIN THE LIMITS
OF THE DISPOSAL FIELDS AFTER PIPE INSTALLATION HAS BEGUN. OP��E RY
3. AFTER EXCAVATION 2' WIDE TRENCH TO THE DEPTHS REQUIRED,
THE WALLS AND FLOOR OF EACH TRENCH SHOULD BE CLEANED
AND RAKED TO ACHIEVE AN EVEN SURFACE AND TO LOOSEN
SMEARED SECTIONS OF TRENCH.
4. PLACEMENT OF CRUSHED STONE, PERFORATED PIPE AND UNTREATED BUILDING ° w 1M
PAPER OR STRAW SHALL BE AS SHOWN, AND CARE SHALL BE � -1. w
EXERCISED TO AVOID INCLUSION OF FINE GRAINED SOILS AND (P
OTHER WASTE MATERIAL IN THE STONE AND PIPE.
5. THE PIPE SHOULD BE LAID AT THE GRADES AND TO THE �O �0. C79060
RELATIONSHIPS SHOWN ON THIS DRAWING, MAINTAINING STRAIGHT ROFESSI��A�
CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS
OR OTHER UNSUITABLE CONDITIONS. THE PIPE SHALL BE LAID
WITH THE HOLES DOWN IN ALL CASES.
6. ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL
AND TO DIVERT SURFACE RUNOFF FROM ADJACENT AREAS AWAY
FROM THE DISPOSAL FIELD.
7. REMOVE LEAVES, ROOTS, PLANTS AND ORGANIC DEBRIS. PLOW SURFACE PRIOR
TO SPREADING FILL MATERIAL
8. DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION FIELD AREA.
9. PLACE FILL AND ALLOW TO STABILIZE IN ACCORDANCE WITH NEW YORK STATE
DEPARTMENT OF HEALTH STANDARDS.
REVISED DATE VISION Engineering and Construction, LLC Septic System 10 Himbaly Lane. Qu"wbwy, N.Y. IN04 DWG
G 3
PROBE: M-9m STANDARD CONSTRUCTION of 3
DETAILS
7-1t CA.,r'l.-J /4-V
Permit Number
REScheck Compliance Certificate Checked By/Date
New York State Energy Conservation Construction Code
REScheckSoftware Version 3.5 Release lc
Data filename: C:\Documents and Settings\Dan Ryan\My Documents\Hayes Construction Group\Projects\New
Folder\214mcheck.rck
TITLE:214 Cronin Rd
COUNTY:Warren
STATE:New York
HDD:7635
CONSTRUCTION TYPE:Detached 1 or 2 Family
HEATING TYPE:Non-Electric
DATE:07/26/04
DATE OF PLANS: 7/19/04 1 ECr—jv Q
COMPANY INFORMATION:
Hayes Construction Group Jl)L `� B 2'004
TOWN()F QUEENSBURY
COMPLIANCE:Passes BUILDING AND CODE
Maximum UA=595
Your Home UA=477
19.8%Better Than Code(UA)
Gross Glazing
Area or Cavity. Cont. or Door
Perimeter R-Value R-Value U-Factor UA
Ceiling 1:Flat Ceiling or Scissor Truss 1373 30.0 0.0 48
Ceiling 2: Cathedral Ceiling(no attic) 200 30.0 0.0 7
Wall l:Wood Frame, 16"o.c. 1495 19.0 0.0 77
Window 1:Vinyl Frame:Double Pane with Low-E 114 0.360 41
Door 1: Glass 74 0.320 24
Door 3: Solid 20 0.140 3
Wall 2:Wood Frame, 16"o.c. 1536 19.0 0.0 82
Window 2:Vinyl Frame:Double Pane with Low-E 177 0.360 64
Wall 3:Wood Frame, 16"o.c. 240 19.0 0.0 11
Window 3:Vinyl Frame:Double Pane with Low-E 28 0.360 10
Door 2: Glass 34 0.320 11
Basement Wall 1: Solid Concrete or Masonry 860 0.0 10.0 75
Wall height:7.8'
Depth below grade:6.5'
Insulation depth:4.0'
Floor 1:All-Wood Joist/Truss:Over Outside Air 76 30.0 0.0 3
Floor 2: Slab-On-Grade:Unheated 30 10.0 21
Insulation depth:4.0'
Furnace 1:Forced Hot Air,92 AFUE
COMPLIANCE STATEMENT: The proposed building represented in this document is consistent with the building plans,
+specifications,and other calculations submitted with this permit application. The proposed systems have been designed to meet the
New York State Energy Conservation Construction Code requirements. When a Registered Design Professional has stamped and
signed this page,they are attestine that to the best of his/her knowledge,belief,and professional judgment,such plans or
specifications are i ompli c -th this Code.
Builder/Designer Date 2
IF NtltV
43-v O�
,o �O. 0790613
R°FEs S I ON P�
`REScheck Inspection Checklist
New York State Energy Conservation Construction Code
REScheckSoftware Version 3.5 Release lc
DATE:07/26/04
TTTLE:214 Cronin Rd
Bldg. I
Dept. I
Use
I
Ceilings:
[ ] I 1. Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity insulation
Comments:
[ ] I 2. Ceiling 2: Cathedral Ceiling(no attic),R-30.0 cavity insulation
Comments:
I
Above-Grade Walls:
[ ] I 1. Wall 1: Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
[ ] I 2. Wall 2:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
[ ] I 3. Wall 3:Wood Frame, 16"o.c.,R-19.0 cavity insulation
Comments:
I
Basement Walls:
[ ] I 1. Basement Wall 1: Solid Concrete or Masonry,7.8'ht/6.5'bg/4.0'insul,
R-10.0 continuous insulation
Comments:
Exterior insulation must have a rigid,opaque,weather-resistant protective covering that
I covers the exposed(above-grade)insulation and extends at least 6 in.below grade.
I
Windows:
[ ] I 1. Window 1:Vinyl Frame:Double Pane with Low-E,U-factor:0.360
For windows without labeled U-factors,describe features:
I #Panes Frame Type Thermal Break?[ ]Yes[ ]No
Comments:
[ ] I 2. Window 2:Vinyl Frame:Double Pane with Low-E,U-factor:0.360
For windows without labeled U-factors,describe features:
I #Panes Frame Type Thermal Break? [ ] Yes [ ]No
Comments:
[ ] I 3. Window 3:Vinyl Frame:Double Pane with Low-E,U-factor:0.360
For windows without labeled U-factors,describe features:
I #Panes Frame Type Thermal Break?[ ]Yes[ ]No
Comments:
I
Doors:
[ ] I 1. Door 1: Glass,U-factor:0.320
Comments:
[ ] 2. Door 3: Solid,U-factor: 0.140
Comments:
[ ] I 3. Door 2: Glass,U-factor: 0.320
Comments:
I
Floors:
[ ] I 1. Floor 1:All-Wood Joist/Truss:Over Outside Air,R-30.0 cavity insulation
Comments:
[ ] I 2. Floor 2: Slab-On-Grade:Unheated,4.0'insulation depth,R-10.0 continuous insulation
Comments:
Slab insulation to extend down from the top of the slab to at least 4.0 ft.OR down to at
least the bottom of the slab then horizontally for a total distance of 4.0 ft.
Exterior insulation must have a rigid,opaque,weather-resistant protective covering that
covers the exposed(above-grade)insulation and extends at least 6 in.below grade.
Heating and Cooling Equipment:
[ ] I 1. Furnace 1:Forced Hot Air,92 AFUE or higher
Make and Model Number
Air Leakage:
[ ] I Joints,penetrations,and all other such openings in the building envelope that are sources of air
leakage must be sealed.
E l Recessed lights must be 1)Type IC rated,or 2)installed inside an appropriate air-tight assembly
with a 0.5"clearance from combustible materials. If non-IC rated,the fixture must be installed with a
3"clearance from insulation.
Vapor Retarder:
[ ] Required on the warm-in-winter side of all non vented framed ceilings,walls,and floors.
Materials Identification:
[ ] I Materials and equipment must be installed in accordance with the manufacturer's installation instructions.
[ ] I Materials and equipment must be identified so that compliance can be determined.
[ ] I Manufacturer manuals for all installed heating and cooling equipment and service water heating
equipment must be provided.
[ } Insulation R-values,glazing U-factors,and heating equipment efficiency must be clearly marked on
I the building plans or specifications..
Duct Insulation:
[ ] Supply ducts in unconditioned attics or outside the building must be insulated to R 11.
Return ducts in unconditioned attics or outside the building must be insulated to R-6.
[ ] Supply ducts in unconditioned spaces must be insulated to R-11.
[ ] I Return ducts in unconditioned spaces(except basements)must be insulated to R-2.
Insulation is not required on return ducts in basements.
I
Duct Construction:
[ ] I All joints, seams,and connections must be securely fastened with welds,gaskets,mastics
(adhesives),mastic-plus-embedded-fabric,or tapes. Duct tape is not permitted.
Exception:Continuously welded and locking-type longitudinal joints and seams on ducts
operating at less than 2 in.w.g. (500 Pa).
E ] I Ducts shall be supported every 10 feet or in accordance with the manufacturer's instructions.
[ ] Cooling ducts with exterior insulation must be covered with a vapor retarder.
[ ] Air filters are required in the return air system.
[ l I The HVAC system must provide a means for balancing air and water systems.
I
Temperature Controls:
[ ] I Each dwelling unit has at lesat one thermostat capable of automatically adjusting the space
temperature set point of the largest zone.
Electric Systems:
[ ] I Separate electric meters are required for each dwelling unit.
Fireplaces:
[ ] I Fireplaces must be installed with tight fitting non-combustible fireplace doors.
[ ] I Fireplaces must be provided with a source of combustion air,as required by the Fireplace construction
provisions of the Building Code of New York State,the Residential Code of New York State or
the New York City Building Code,as applicable.
Cn.vrinn Wn4n.•Ann4Cnn•
•[ ] Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the
water heater has an integral heat trap or is part of a circulating system.
[ ] Insulate circulating hot water pipes to the levels in Table 1.
Circulating Hot Water Systems:
[ ] Insulate circulating hot water pipes to the levels in Table 1.
Swimming Pools:
[ ] All heated swimming pools must have an on/off heater switch and require a cover unless over 20%
of the heating energy is from non-depletable sources. Pool pumps require a time clock.
Heating and Cooling Piping Insulation:
[ ] HVAC piping conveying fluids above 105 OF or chilled fluids below 55 OF must be insulated to the
levels in Table 2.
w
Table 1: Minimum Insulation Thickness for Circulating Hot Water Pipes.
Insulation Thickness in Inches by Pipe Sizes
Heated Water Non-Circulating Runouts Circulating Mains and Runouts
Temperature(F) Up to 1" Up to 1.25" 1.5"to 2.0" Over 2"
170-180 0.5 1.0 1.5 2.0
140-160 0.5 0.5 1.0 1.5
100-130 0.5 0.5 0.5 1.0
Table 2: Minimum Insulation Thickness for HVAC Pipes.
Fluid Temp. Insulation Thickness in Inches by Pipe Sizes
Piping System Types Range F 2"Runouts 1"and Less 1.25"to 2" 2.5"to 4"
Heating Systems
Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0
Low Temperature 120-200 0.5 1.0 1.0 1.5
Steam Condensate(for feed water) Any 1.0 1.0 1.5 2.0
Cooling Systems
Chilled Water,Refrigerant, 40-55 0.5 0.5 0.75 1.0
and Brine Below 40 1.0 1.0 1.5 1.5
NOTES TO FIELD (Building Department Use Only)
N AYE 5 C ,�5-W(JC T7YJ o r
S F,l,,-�,A
F-RoNro
POSED p C6tT ,,�, [V O
49.'38. `
r p` 408 W
AA
.. `AiN (31
o
C/- CT tp+
\ ZCD
m►J 4oSEC r O —+
✓ ,41�o 00 O O
Tm%1WostE \h.
Ta gemA rJ 25� 4M 47'
S84'04.40"E
m
CRONIN ROAD
..
rn
lY - rZ - 13- I - 3 3