Signed Inspection Report (Fri Apr 9, 2021 at 346 PM)INSPECTION WORKSHEET (FRM-009460-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-0621-2020 Case Module:Permit
Inspection Date:Fri Apr 9, 2021 Inspection Status:Failed
Inspector:O'Brien, John Inspection Type:Building Framing
Job Address:Parcel Number:719 BAY RD
Queensbury, NY, 12804
289.19-1-27
Contact Type Company Name Name
Contractor BBL Construction Services Crupi, John
Applicant BBL Construction Services Crupi, John
Architect HCP Architects, LLP
Granted Permission BBL Construction Services Crupi, John
Primary Owner Rosetti Acquisitions LLC
Checklist Item Status
Apr 09, 2021 Page (1)
INSPECTION WORKSHEET (FRM-009460-2021)
Checklist Item Status
Building Inspector Notes Failed
2/10/21 As per my site visit I met with the metal stud framing, sheetrock, taping and fireproofing installer Seth
Parker of Parker Hammond. We discussed what I will inspect when they are ready. I also spoke with Bobby
Chatterton of BBL regarding the required inspections discussed with Seth. I asked Bobby to send me the
specifications on the CAFCO-BOARD to be installed in narrow bay between structural steel and exterior structural
metal stud framing at 2nd floor. The product is a replacement of the spray on fireproofing due winter weather
conditions only at the location noted above. Also Dente/Terracon will need to inspect structural steel, structural
exterior metal stud walls and fireproofing(CAFCO-BOARD).
2/17/21 partial approval for framing, south half of east facing exterior wall at first floor approved. 2x6 metal studs.
Ok to sheath walls will check balance of structural metal stud framing items from inside.
Fiber board fireproofing installed at narrow locations.
2/18/21 Building Framing Partial Approval
- South Half of west wall metal stud structural framing partial approval. Ok to sheath walls will check balance of
structural metal stud framing items from inside.
Fiber board fireproofing installed at narrow locations.
3/8/21 Site visit with Dave Hatin, Mark Smith and myself. We met with Bobby Chatterton from BBL and went over
job progress, upcoming structural inspections with third party engineer and under slab plumbing.
4/7/21 Building Framing Partial Approval
- Balance of South Half of Building metal stud structural framing partial approval. Ok to sheath walls will check
balance of structural metal stud framing items(clips and anchors from inside.
Fiber board fireproofing installed at narrow locations.
- Zip Roof Sheathing taping of joints at south half of building approved.
Note:
- Forward all special inspections for fireproofing, structural steel and wood framing performed to date for south
half of building.
- Roof access to dormers and parapets must be a minimum of 20"x30".
4/09/21 Building Framing Inspection Not Approved
- Based on our initial inspection of the 2nd and 3rd floor of the south end of the building the following items will
need to be addressed.
1) Submit truss bracing diagrams to our office so we may verify roof and floor truss bracing, nailing patterns for
girder trusses and truss hangers.
2) Verify all point loads transfer down with blocking between floors.
3) Verify all shear wall nailing has been complete.
Apr 09, 2021 Page (2)
INSPECTION WORKSHEET (FRM-009460-2021)
Checklist Item Status
Framing Failed
2/10/21 As per my site visit I met with the metal stud framing, sheetrock, taping and fireproofing installer Seth
Parker of Parker Hammond. We discussed what I will inspect when they are ready. I also spoke with Bobby
Chatterton of BBL regarding the required inspections discussed with Seth. I asked Bobby to send me the
specifications on the CAFCO-BOARD to be installed in narrow bay between structural steel and exterior structural
metal stud framing at 2nd floor. The product is a replacement of the spray on fireproofing due winter weather
conditions only at the location noted above. Also Dente/Terracon will need to inspect structural steel, structural
exterior metal stud walls and fireproofing(CAFCO-BOARD).
2/17/21 partial approval for framing, south half of east facing exterior wall at first floor approved. 2x6 metal studs.
Ok to sheath walls will check balance of structural metal stud framing items from inside.
Fiber board fireproofing installed at narrow locations.
2/18/21 Building Framing Partial Approval
- South Half of west wall metal stud structural framing partial approval. Ok to sheath walls will check balance of
structural metal stud framing items from inside.
Fiber board fireproofing installed at narrow locations.
4/7/21 Building Framing Partial Approval
- Balance of South Half of Building metal stud structural framing partial approval. Ok to sheath walls will check
balance of structural metal stud framing items(clips and anchors from inside.
Fiber board fireproofing installed at narrow locations.
- Zip Roof Sheathing taping of joints at south half of building approved.
Note:
- Forward all special inspections for fireproofing, structural steel and wood framing performed to date for south
half of building.
- Roof access to dormers and parapets must be a minimum of 20"x30".
4/09/21 Building Framing Inspection Not Approved
- Based on our initial inspection of the 2nd and 3rd floor of the south end of the building the following items will
need to be addressed.
1) Submit truss bracing diagrams to our office so we may verify roof and floor truss bracing, nailing patterns for
girder trusses and truss hangers.
2) Verify all point loads transfer down with blocking between floors.
3) Verify all shear wall nailing has been complete.
Apr 09, 2021 Page (3)
INSPECTION WORKSHEET (FRM-009460-2021)
Checklist Item Status
Attic Access 22 x 30 minimum Failed
- Roof access to dormers and parapets must be a minimum of 20"x30".
Jack Studs Headers Failed
Cont Hdrs/Strapping/Nailing Grid for Garage Door Failed
Truss Specification Provided Failed
Bracing Bridging Failed
Hurricane Clips/Uplift Screws/Nail Holes Filled Failed
Air Seal all Plates and Sills Failed
Air Seal All Registers at Floor Failed
Air Sealing all Joints Before Insulation Failed
Joist hangers Failed
Jack Posts Main Beams Failed
Apr 09, 2021 Page (4)
INSPECTION WORKSHEET (FRM-009460-2021)
Checklist Item Status
Deck (post beam connections hex head bolts)Failed
Exterior sheeting nailed properly Failed
12 O.C.Failed
Headroom 6 ft. 8 in.Failed
Notches Holes Bearing Walls Failed
Metal Strapping for Notches Top Plate Failed
Draft stopping 1,000 sq. ft. floor trusses Failed
>1000 s.f. then firestop must be installed Failed
Anchor Bolts 6 ft. or less on center Failed
Ice and water shield 24 inches from wall Failed
<4:12 pitch double layer of ice/snow underlayment - over lapped 19"Failed
Apr 09, 2021 Page (5)
INSPECTION WORKSHEET (FRM-009460-2021)
Checklist Item Status
Soffits-Insulation Baffel Failed
Windows Habitable Space Bedrooms Failed
24 in. (H)Failed
20 in. (W)Failed
5.7 sf above below grade Failed
5.0 sf grade Failed
Design Professional Sign-off, if required Failed
Apr 09, 2021 Page (6)
O'Brien, John