Signed Inspection Report (Fri Apr 9, 2021 at 928 AM)INSPECTION WORKSHEET (SEP-009520-2021)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:SEP-0606-2020 Case Module:Permit
Inspection Date:Fri Apr 9, 2021 Inspection Status:Passed
Inspector:O'Brien, John Inspection Type:Septic
Job Address:Parcel Number:30 SULLIVAN RD
Lake George, NY, 12845
289.9-1-25
Contact Type Company Name Name
Primary Owner Faella, Sheila
Granted Permission North Valley Constructions Services
Primary Owner Erwin, Scott
Engineer Hutchins Engineering
Septic Contractor North Valley Constructions Services
Checklist Item Status
Building Inspector Notes Passed
3/31/21 Septic System Partial Approval
Remaining Items:
- Property Transfer Inspection
- Seal foundation on inside and out.
- Provide Engineer's Final Report and certified as-built plan.
3/31/21 Septic System Partial Approval
Remaining Items:
- Property Transfer Inspection
- Provide Engineer's Final Report and certified as-built plan.
4/6/21 Septic System Partial Approval
Received Engineer's Final Report and certified as-built plan.
Remaining item:
- Property Transfer Inspection
4/09/21 Septic System Approved
- washing machine drain installed
Apr 09, 2021 Page (1)
INSPECTION WORKSHEET (SEP-009520-2021)
Checklist Item Status
Soil Type: Sand Passed
Soil Type: Loam Passed
Type of Water: Municipal / Well Water Passed
Well
Waterline separation distance Passed
Well separation distance Passed
As per variance
Absorbtion Fields: Total Length Passed
70'
15'x25' Absorption Stone and Pipe Bed
Septic system field above flood plain Passed
Length of Each Trench Passed
3@20' with end looped
Depth of Trenches Passed
18"-24"
Apr 09, 2021 Page (2)
INSPECTION WORKSHEET (SEP-009520-2021)
Checklist Item Status
System Use Status Passed
3/31/21 Septic System Partial Approval
Remaining Items:
- Property Transfer Inspection
- Seal foundation on inside and out.
- Provide Engineer's Final Report and certified as-built plan.
3/31/21 Septic System Partial Approval
Remaining Items:
- Property Transfer Inspection
- Provide Engineer's Final Report and certified as-built plan.
3/31/21 Septic System Partial Approval
Remaining Items:
- Property Transfer Inspection
- Provide Engineer's Final Report and certified as-built plan.
4/6/21 Septic System Partial Approval
Received Engineer's Final Report and certified as-built plan.
Remaining item:
- Property Transfer Inspection
4/09/21 Septic System Approved
- washing machine drain installed
Size of Stone Passed
#2
Building to Tank Passed
4" sdr35 pvc
Tank to Distribution Box Passed
4" sdr35 pvc
Distribution box to Field / Pit Passed
4" sdr35 pvc to 4" pvc perforated with end looped.
Apr 09, 2021 Page (3)
INSPECTION WORKSHEET (SEP-009520-2021)
Checklist Item Status
Opening Sealed:Passed
- Seal foundation on inside and out.
End Cap Passed
End looped
InletOutlet Pipes & Baffles Passed
Effluent Filter installed
Manholes 12 or less below grade Passed
Locations / Separations Passed
As per septic variance
Foundation to Tank Passed
4.7' as per septic variance
Foundation to Absorption Passed
82'
Conforms as per Plot Plan Passed
Engineer Report and As-Built Passed
- Provide Engineer's Final Report and certified as-built plan.
Location of system on property Passed
As per approved plan.
Apr 09, 2021 Page (4)