Loading...
Signed Inspection Report (Fri Apr 9, 2021 at 928 AM)INSPECTION WORKSHEET (SEP-009520-2021) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:SEP-0606-2020 Case Module:Permit Inspection Date:Fri Apr 9, 2021 Inspection Status:Passed Inspector:O'Brien, John Inspection Type:Septic Job Address:Parcel Number:30 SULLIVAN RD Lake George, NY, 12845 289.9-1-25 Contact Type Company Name Name Primary Owner Faella, Sheila Granted Permission North Valley Constructions Services Primary Owner Erwin, Scott Engineer Hutchins Engineering Septic Contractor North Valley Constructions Services Checklist Item Status Building Inspector Notes Passed 3/31/21 Septic System Partial Approval Remaining Items: - Property Transfer Inspection - Seal foundation on inside and out. - Provide Engineer's Final Report and certified as-built plan. 3/31/21 Septic System Partial Approval Remaining Items: - Property Transfer Inspection - Provide Engineer's Final Report and certified as-built plan. 4/6/21 Septic System Partial Approval Received Engineer's Final Report and certified as-built plan. Remaining item: - Property Transfer Inspection 4/09/21 Septic System Approved - washing machine drain installed Apr 09, 2021 Page (1) INSPECTION WORKSHEET (SEP-009520-2021) Checklist Item Status Soil Type: Sand Passed Soil Type: Loam Passed Type of Water: Municipal / Well Water Passed Well Waterline separation distance Passed Well separation distance Passed As per variance Absorbtion Fields: Total Length Passed 70' 15'x25' Absorption Stone and Pipe Bed Septic system field above flood plain Passed Length of Each Trench Passed 3@20' with end looped Depth of Trenches Passed 18"-24" Apr 09, 2021 Page (2) INSPECTION WORKSHEET (SEP-009520-2021) Checklist Item Status System Use Status Passed 3/31/21 Septic System Partial Approval Remaining Items: - Property Transfer Inspection - Seal foundation on inside and out. - Provide Engineer's Final Report and certified as-built plan. 3/31/21 Septic System Partial Approval Remaining Items: - Property Transfer Inspection - Provide Engineer's Final Report and certified as-built plan. 3/31/21 Septic System Partial Approval Remaining Items: - Property Transfer Inspection - Provide Engineer's Final Report and certified as-built plan. 4/6/21 Septic System Partial Approval Received Engineer's Final Report and certified as-built plan. Remaining item: - Property Transfer Inspection 4/09/21 Septic System Approved - washing machine drain installed Size of Stone Passed #2 Building to Tank Passed 4" sdr35 pvc Tank to Distribution Box Passed 4" sdr35 pvc Distribution box to Field / Pit Passed 4" sdr35 pvc to 4" pvc perforated with end looped. Apr 09, 2021 Page (3) INSPECTION WORKSHEET (SEP-009520-2021) Checklist Item Status Opening Sealed:Passed - Seal foundation on inside and out. End Cap Passed End looped InletOutlet Pipes & Baffles Passed Effluent Filter installed Manholes 12 or less below grade Passed Locations / Separations Passed As per septic variance Foundation to Tank Passed 4.7' as per septic variance Foundation to Absorption Passed 82' Conforms as per Plot Plan Passed Engineer Report and As-Built Passed - Provide Engineer's Final Report and certified as-built plan. Location of system on property Passed As per approved plan. Apr 09, 2021 Page (4) O'Brien, John